| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. |
| 2 | Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar(1 cement : 4 coarse sand) |
| 3 | Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. (DSR-11.27) |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-Ill) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 5 | Dismantling old plaster or skirting raking out joints and cleaning thesurface for plaster including disposal of rubbish to the dumping groundwithin 50 metres lead |
| 6 | Distempering with 1st quality acrylic distemper, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two or more coats on DSR 13.81.1 |
| 7 | Painting with synthetic enamel paint of approved brand andmanufacture of required colour to give an even shade : One or more coats on old work |
| 8 | Providing and fixing 4mm thick plain glass panes with beading when required over exixting chowkhat or fixed shutter or fixed portion or glazed shutter including the cost of nails, putty etc. complete in all respect to the entire satisfaction of Engineer-in-charge. |
| 9 | Removing dry or oil bound distemper, water proofing cement paintand the like byscrapping, sand papering and preparing the surfacesmooth including necessary repairs to scratches etc. complete. |
| 10 | Providing and applying filling with cement based putty (Birla, Jk or equivalent) to the required finish complete in all respect and to the entire satisfaction of Engineer-in-charge. |
| 11 | Providing and laying tactile tile (for vision impaired persons as per standards) of size 300x300x9.8mm having with water absorption less than 0.5% and conforming to IS:15622 of approved make in all colours and shades in for outdoor floors such as footpath, court yard, multi modals location etc., laid on 20mm thick base of cement mortar 1:4 (1 cement : 4 coarse sand) in all shapes & patterns including grouting the joints with white cement mixed with matching pigments etc.complete as per direction of Engineer-in-Charge |
| 12 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. (DSR-15.60) Please Enable Macros to View BoQ information |