| 1 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 2 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 3 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 4 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 5 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 6 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. |
| 7 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 8 | Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole. |
| 9 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 10 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 11 | Renewal of existing damaged/broken old LT stay in existing stay rod. |
| 12 | Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling. |
| 13 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling. |
| 14 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50 sqmm with bare/insulated Messenger through existing poles |
| 15 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 16 | Erection of suspension clamp for LT ABC of any size |
| 17 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 18 | Providing Cable Tie |
| 19 | Providing End Caps |
| 20 | Installing One No. Insulation piercing connector of size Main :16 to 95 ,Tap:1.5 to 16 Sq.mm |
| 21 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap 16-95 sqmm |
| 22 | Installation of Insulation piercing connector for main to service line main :16-95 sqmm, Tap : 4-35 sqmm |
| 23 | Installing One No. 4 way Satellite Connector of size Main :16 to 95, Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 24 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 25 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 26 | Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. |
| 27 | Installation of Pre-insulated lugs for 70sqmm |
| 28 | Installation of Pre-insulated lugs for 50sqmm |
| 29 | Installation of Pre-insulated lugs for 16sqmm |
| 30 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 31 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. Please Enable Macros to View BoQ information |