| 1 | Hire charges of electrical fittings & goods, fitted & fixed in position complete in all respect and removal of all after the completion of election works as per direction of authority. |
| 2 | Providing on hire basis following switches on angle iron frame including providing interconnection wiring with accessories socking earthing attachmentetc. And dismantling at the end of the election programme. Panel Accessories:- |
| 3 | 500V, 250Amps. TPN main switch |
| 4 | 500V, 200 Amps. TPN main switch |
| 5 | 500V, 100 Amps. TPN main switch |
| 6 | 500V, 60/63 Amps. TPN main switch |
| 7 | 250V, 60/63 Amps. TPN main switch |
| 8 | 500V, 100 Amps. TPN change over switch |
| 9 | Power Distribution Board |
| 10 | 24-way M.C.B.D.B.T.P.N |
| 11 | 24-way M.C.B.D.B.S.P.N |
| 12 | 16-way M.C.B.D.B.T.P.N |
| 13 | 16-way M.C.B.D.B.S.P.N |
| 14 | 10-way M.C.B.D.B.T.P.N |
| 15 | 10-way M.C.B.D.B.S.P.N |
| 16 | 8-way M.C.B.D.B.T.P.N |
| 17 | 8-way M.C.B.D.B.S.P.N |
| 18 | 6-way M.C.B.D.B.T.P.N |
| 19 | 6-way M.C.B.D.B.S.P.N |
| 20 | Power Cable |
| 21 | 95 sq. mm, 3.5 core |
| 22 | 70 sq. mm, 3.5 core |
| 23 | 50 sq. mm, 3.5 core |
| 24 | 25 sq. mm, 3.5 core |
| 25 | 10 sq. mm, 3.5 core |
| 26 | 6 sq. mm, 3.5 core |
| 27 | Distribution Wire for Power Distribution |
| 28 | Supplying and providing 7/0.064 wire on hire basis single core PVC wire and dismantling |
| 29 | Supplying and providing 3/0.036 wire on hire basis single core PVC wire and dismantling |
| 30 | Supplying and providing 2 x 3/0.036 Single Core PVC to light/fan/bell and other necessary point and dismantling after the end of programme. |
| 31 | Supplying and providing 3 x 3/0.036 Single Core PVC wire for 5 & 15 Amps. Plug point and dismantling. |
| 32 | Hire charges of Electrical fittings & goods, fitted & fixed in position complete in all respect & removal of all after the completion of election work as per direction of authority. |
| 33 | Fluorescent Tube Set (1 x 40 Watt) |
| 34 | Fluorescent Tube Set (2 x 40 Watt) |
| 35 | Bulbs - 100 watts |
| 36 | Bulbs - 200 watts |
| 37 | Table Fan (400mm x 450mm) |
| 38 | Ceiling Fan (1200mm) |
| 39 | Ceiling Fan (1400mm) |
| 40 | Pedestal Fan (500mm) |
| 41 | Air Circulator Fan (600mm) |
| 42 | Sodium Vapour Lamp |
| 43 | 400 watt |
| 44 | 250 watt |
| 45 | Halogen - 1000 watt for |
| 46 | Flood Light - 1000 watts |
| 47 | Mercury Light - 1000 watts |
| 48 | Metal Lamp - 400/1000 watts |
| 49 | 32\\" LCD/LED T.V. with Remote Control |
| 50 | P.L. light |
| 51 | (1 to 18 watt) |
| 52 | (20 to 36 watt) |
| 53 | (36 to 85 watt) |
| 54 | Temporary earthing arrangement 50 mm dia. G.I. pipe 3.64 mm. thick x 3.04 mtr. Long and 1 x 4 S.W.G G.I. wire, 13 mm dia. X 80 mm long G.I. bolts, double nuts, double washers, including S & F 15 mm dia. G.I. pipe protection (1 mtr long) to be filled with bitumen partly under. |
| 55 | Supply and fixing on hire basis of different types of Fire Extinguisher on wall and dismantling: |
| 56 | Dry powder type Fire Extinguisher (DCP), capacity - 5 kgs. |
| 57 | Water type CO2 Gas Cartridge Fire Extinguisher; capacity - 9 litres. |
| 58 | Mechanical Foam (FFF) type Fire Extinguisher; capacity - 9 litres. |
| 59 | CO2 type Fire Extinguisher; capacity - 4.5 kgs. |
| 60 | Dry Powder (stored pressure) Fire Extinguisher; capacity - 5 kgs. |
| 61 | ABC type Fire Extinguisher; capacity - 5 kgs. |
| 62 | Fire Bucket |
| 63 | Hire charges of high frequency including loud-Speaker with amplifire & cord-less microphone set for public address system complete and dismantling |
| 64 | 6 nos. Horns |
| 65 | 4 nos. Horns |
| 66 | 2 nos. Horns |
| 67 | 1 no. Horn |
| 68 | Hiring of Generator |
| 69 | 1A. Hire charges of generator set of 10 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) |
| 70 | Open type |
| 71 | Green and sound proof type |
| 72 | 1B. Running cost of generator including fuelling for …...nos.X …….hoursX ……..days = ……..hours |
| 73 | Open type |
| 74 | Green and sound proof type |
| 75 | 2A. Hire charges of generator set of 20 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places.(Dry rate) |
| 76 | Open type |
| 77 | Green and sound proof type |
| 78 | 2B. Running cost of generator including fuelling for …...nos.X …….hoursX ……..days = ……..hours |
| 79 | Open type |
| 80 | Green and sound proof type |
| 81 | 3A. Hire charges of generator set of 30 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) |
| 82 | Open type |
| 83 | Green and sound proof type |
| 84 | 3B. Running cost of generator including fuelling for …...nos.X …….hoursX ……..days = ……..hours |
| 85 | Open type |
| 86 | Green and sound proof type |
| 87 | 4A. Hire charges of generator set of 40 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) |
| 88 | Open type |
| 89 | Green and sound proof type |
| 90 | 4B. Running cost of generator including fuelling for …...nos.X …….hoursX ……..days = ……..hours |
| 91 | Open type |
| 92 | Green and sound proof type |
| 93 | 5A. Hire charges of generator set of 50 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) |
| 94 | Open type |
| 95 | Green and sound proof type |
| 96 | 5B. Running cost of generator including fuelling for …...nos.X …….hoursX ……..days = ……..hours |
| 97 | Open type |
| 98 | Green and sound proof type |
| 99 | 6A. Hire charges of generator set of 63 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) |
| 100 | Open type |
| 101 | Green and sound proof type |
| 102 | 6B. Running cost of generator including fuelling for …...nos.X …….hoursX ……..days = ……..hours |
| 103 | Open type |
| 104 | Green and sound proof type |
| 105 | 7A. Hire charges of generator set of 82.5 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) |
| 106 | Open type |
| 107 | Green and sound proof type |
| 108 | 7B. Running cost of generator including fuelling for …...nos.X …….hoursX ……..days = ……..hours |
| 109 | Open type |
| 110 | Green and sound proof type |
| 111 | 8A. Hire charges of generator set of 125 KVA, 3-phase, 50Hz, 415V fitted & fixed in position complete in all respect and removal of all after the completion of election work as per direction of authority; to be supplied at different places. (Dry rate) |
| 112 | Open type |
| 113 | Green and sound proof type |
| 114 | 8B. Running cost of generator including fuelling for …...nos.X …….hoursX ……..days = ……..hours |
| 115 | Open type |
| 116 | Green and sound proof type |
| 117 | Supplying and providing Split Air Conditionong Machine |
| 118 | 1.25 Ton CUBE type Wall Mounted |
| 119 | 1.50 Ton CUBE type Wall Mounted |
| 120 | 1.50 Ton normal Split type type Wall Mounted |
| 121 | 2.00 Ton normal Split type type Wall Mounted |
| 122 | Stand type Air Conditioning Machine; capacity - 3 Tons |
| 123 | Supplying & providing of Window Air Conditioning Machine |
| 124 | 1.5 Tons |
| 125 | 2.00 Tons Please Enable Macros to View BoQ information |