| 1 | Erecting steel tubular poles (9 mtr, 11 mtr and 13 mtr) in a vertical position, including transportation to the designated location, excavation of a pit measuring 0.9 x 0.9 x 1.83 meters, and disposal of surplus soil up to a distance of 50 meters |
| 2 | Dismantling steel tubular poles (9 mtr, 11 mtr and 13 mtr) and transporting them to the designated location |
| 3 | Installation of single pole brackets on a steel pole using 5/8\\" MS bolts, nuts, and washer clamps (all fasteners provided by the contractor) |
| 4 | Supply and installation of pin insulator with pin on pole brackets as per the instructions of the EIC |
| 5 | Stringing of conductor, including necessary jumpering and joining as required |
| 6 | Stringing and laying of 7/14 SWG GI earth wire |
| 7 | Supply and installation of a 5’/8’ x 6” stay set, including an anchor plate, bow thimble, nuts and bolts, stay insulator, stay wire, and all necessary accessories |
| 8 | Supply of 7/14 SWG GI earth wire |
| 9 | Supply of cement for grouting poles and stays |
| 10 | Providing and fixing 125A TP&N disconnector fuse switch unit inside the existing panel board with ISI marked HRC fuses including drilling holes in cubicle panel, making connections, etc. as required |
| 11 | Providing 7/14 SWG Galvanized Iron (G.I.) wire for cradle/cage type guarding and connection to the existing earthing system for overhead lines at required crossings and identified spans |
| 12 | Providing 10 SWG Galvanized Iron (G.I.) wire for lacing and binding of guarding wires in cradle/cage formation at overhead crossings and identified spans |
| 13 | Stringing, installation and proper lacing of 7/14 SWG G.I. guarding wire with 10 SWG G.I. lacing wire in cradle/cage formation at required locations of overhead line crossings and identified spans, including tightening, binding, anchoring, and providing proper connection to the existing earthing system, complete as per standard practice and site requirements Please Enable Macros to View BoQ information |