| 1 | Supply, Installation, testing and Commissioning of Duplex Strainers (Manual Cleaning) with 14 Inch inlet, outlet and working pressure of 10 Bars along with valves to control & direct the water flow though either one or both channel. Filtration of 2000 Microns. |
| 2 | Supply, Installation, testing and Commissioning of Duplex Strainers (Auto Self-Cleaning) with 14 Inch inlet, outlet and working pressure of 10 Bars along with valves to control & direct the water flow though either one or both channel. Filtration of 2000 Microns |
| 3 | Supply, Design, Installation, testing and Commissioning of 14 Inch Seamless pipeline (in Metres). SCH 40, Thickness- 11 mm, confirming to ASTM A106 Gr.B |
| 4 | Supply, Installation, testing and Commissioning of SCADA compatible motorised AUTO Open/ Close Gate Valves – 14 inch in the main Penstock tapping input with following specifications as per site & Design requirement: Material: CS. Working Pressure: 6 Bars, Designed Pressure: 25 Bars, ANSI standard according to designed pressure, Class: 300 or higher |
| 5 | Supply, Installation, testing and Commissioning of SCADA compatible motorised MANUAL Open/ Close Gate Valves – 14 inch in the main Penstock tapping input with following specifications as per site & Design requirement: Material: CS. Working Pressure: 6 Bars, Designed Pressure: 25 Bars, ANSI standard according to designed pressure, Class: 300 or higher |
| 6 | Supply, Installation, testing and Commissioning of Gate Valves – 14 inch in the main 14 inch pipeline with following specifications as per site & Design requirement: Material: CS. Working Pressure: 6 Bars, Designed Pressure: 20 Bars, ANSI standard according to designed pressure, Class: 150 or higher |
| 7 | Supply, Installation, testing and Commissioning of Non Return Valves – 14 inch in the with following specifications as per site & Design requirement: Material: CS. Working Pressure: 6 Bars, Designed Pressure: 20 Bars, ANSI standard according to designed pressure, Class: 150 or higher |
| 8 | Supply, Installation, testing and Commissioning of 10 inch seamless pipeline in the individual unit header (in metres)- SCH 40, Thickness- 9mm, confirming to ASTM A106 Gr.B |
| 9 | Supply, Installation, testing and Commissioning of 10 Inch control Gate valves- 03 NO. with following specifications as per site requirement: Material: CS. Working Pressure: 6 Bars, Designed Pressure: 20 Bars, ANSI standard according to designed pressure, Class: 150 or higher |
| 10 | Supply, Installation, testing and Commissioning of flow meters and relays at different locations to transmit the flow data and low flow alarms to SCADA in Control Room |
| 11 | SITC of pressure transmitters at different locations to pressure data alarms in case of pressure drop to SCADA in Control Room |
| 12 | Supply, Installation, testing and Commissioning of 4 inch seamless pipeline in the individual unit header (in metres)- SCH 40, Thickness- 6mm, confirming to ASTM A106 Gr.B for drain mechanism including control valves. |
| 13 | Supply, Installation, testing and Commissioning Flanges ANSI 150: ID- 14 Inch as per requirement |
| 14 | Supply, Installation, testing and Commissioning Flanges ANSI 150: ID-10 inch as per requirement |
| 15 | Supply, Installation, testing and Commissioning Flanges ANSI 150: ID- 4 Inch as per requirement |
| 16 | All allied works like Civil works like support structure for pipeline and strainers. |
| 17 | Installation of trash disposal system, so that all trash collected in the strainer basket is disposed in the space provided. |
| 18 | Enabling of SCADA including wiring, control cables, panels.The Status, Supervision and Control of Valves, Flow, Pressure status should be visible from CR Work station. Please Enable Macros to View BoQ information |