|
| 1 | Slip Clearance disposal lead upto 50m and lift upto 1.5m |
| 2 | In ordinary soils |
| 3 | in soils; mixed with moorumiKankar/shingle/ boulders. |
| 4 | in soils; mixed with Decomposed Rocks; by blasting or any other means |
| 5 | in medium hard rocks; by blasting |
| 6 | in hard rocks; by blasting |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: |
| 8 | All kind of Soil |
| 9 | Ordinary Rock |
| 10 | Hard Rock (requiring Blasting) |
| 11 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 12 | All kinds of soil : |
| 13 | Ordinary Rock |
| 14 | Hard Rock (Requiring Blasting ) |
| 15 | Hard Rock (Blasting prohibited ) |
| 16 | carriage of mulba from an average distance of 01Km by MT |
| 17 | carriage of mulba from an average distance of 02Km by MT |
| 18 | carriage of mulba from an average distance of 03Km by MT |
| 19 | carriage of mulba from an average distance of 04Km by MT |
| 20 | carriage of mulba from an average distance of 05Km by MT |
| 21 | Clearing snow (with frost) from Roads, manually/ Machinecally using picks and shovels; snow depth upto 150 mm |
| 22 | Clearing Snow (without frost) from Roads, manually/ Machinecally |
| 23 | Snow depth upto 150 mm |
| 24 | Snow depth over 150 mm but upto 250mm |
| 25 | Snow depth over 250 mm but upto 350mm |
| 26 | Snow depth over 350 mm but upto 450mm |
| 27 | Snow depth over 450 mm but upto 550mm |
| 28 | Snow depth over 550 mm but upto 650mm |
| 29 | Snow depth over 650 mm but upto 750mm |
| 30 | Snow depth over 750 mm but upto 850mm |
| 31 | Snow depth over 850 mm but upto 950mm |
| 32 | Snow depth over 950 mm but upto 1050mm |
| 33 | Snow depth over 1050 mm but upto 1150mm |
| 34 | Snow depth over 1150 mm but upto 1250mm |
| 35 | Supplying and stacking at site |
| 36 | 90 mm to 45 mm |
| 37 | Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering andcompacting to the required density. |
| 38 | Supply of labour for miscellance manual work not susceptable to be paid as actual. |
| 39 | Dumping stone excluding cost of stones.in Horizontal on level (Labour Rates) |
| 40 | Dumping stone excluding cost of stones. Full Rate |
| 41 | Dry random rubble masonry with hard stone in foundation and plinth:Without bond stone |
| 42 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: |
| 43 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stoneaggregate) finished with a floating coat of neat cement including cementslurry and curing complete, but excluding the cost of nosing of steps etc.complete.50 mm thick with 20mm nominal size stone aggregate |
| 44 | Making knitted wire crates of approved mesh-size; including weaving,binding sides and partitions, and binding top after filling; excluding costof filling, stones and weaving materials |
| 45 | Hand-packing stones in wire-crates; excluding cost of crates and stones |
| 46 | Carriage of stone aggrigate at an average distance of 05 kms |
| 47 | Carriage of stone at an average distance of 05 kms Please Enable Macros to View BoQ information |