|
| 1 | Earth work in excavation by manual means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | P/L of dry Stone soling/nallah boulders dully hand packed hand rammed incl stone chippings, all carriages complete |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excl. the cost of centring and shuttering. all work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) all complete |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work forwalls abuts etc |
| 6 | 6 mm cement plaster of mix 1 : 6 (1 cement : 6 fine sand) |
| 7 | steel reinforcement for rcc work including straitening,cutting,bending,placing in /position and binding all completeupto and above plinth level |
| 8 | Carriage of aggregates below 40mm by MT for av lead of 25 kms |
| 9 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 10 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.welded |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade,two or more coats on new work including primer. |
| 12 | P/F of information sign board and photographs Please Enable Macros to View BoQ information |