| 1 | Civil Work |
| 2 | Operation of gates & valves and cleaning of screenings / floating materials properly round the clock from influent by mechanical bar screen or manually including floating materials lifting & placing on platform for drying and collection at desired place in campus as directed by E/I( 1 lalour X 3 shift X 365 Days = 1095 Man days) |
| 3 | Cleaning of grits form grit channels as per direction of E/I of PTU and collection at desired place in campus as directed by E/I (2 lalour X 2 shift X 365 Days = 1460 Man days) |
| 4 | Provide one safety officer at site for safaty of the working staff at desired place in campus as directed by E/I (1 lalour X 1 shift X 365 Days = 365 Man days) |
| 5 | Provide one fitter / machanic of class - 1st at site for repair of mechanical equipment & fittings at desired place in campus as directed by E/I (1 lalour X 1 shift X 365 Days = 365 Man days) |
| 6 | Provide one electrician of class - 2nd at site for repair of electrical equipment at desired place in campus as directed by E/I (1 lalour X 1 shift X 365 Days = 365 Man days) |
| 7 | Operation of valves and gates and cleaning of chokages of UASB reactor including lifting & placing the chokages materials on platform for drying and collection at desired place in campus as directed by E/I for following works. Removing of floating, scum etc from the surface & notches and removing the chockage from feed pipes and feed boxes by providing roding and submersible pump.( 3 lalour X 2 shift X 365 Days = 2190 Man days) |
| 8 | Removing of scum & dead algae form the surfaces of 2 No. polishing ponds , collecting the same in a vessel and thier to handcart and its safe disposal at desired place in the campus of including operating of gates / valves etc.( 2 lalour X 2 shift X 365 Days = 1460 Man days) |
| 9 | Sludge withdrawal from reactors through all withdrawal pipes of reactors to maintain uniformity through out the reactor to flow the sludge by gravity into sludge sump and from there by pumping to enable to flow into channels of sludge drying beds so as to apply the sludge on a desired bed evenly for drying incluidng operation of valves/gates of reactors, sump and SDBs including proper maintenance of all the SDBS and leveling ther filter media of all the SDBS.( 3 lalour X 2 shift X 365 Days = 2190 Man days) |
| 10 | Providing beldar for watch and ward of all unit of STP and campus as per direction of engineer in charge ( 3 lalour X 2 shift X 365 Days = 2190 Man days) |
| 11 | Providing sweeper for regular cleaning of all units of STP as per direction of engineer in charge ( 2 Sweeper X 1 shift X 365 Days = 730 Man days) |
| 12 | Provision for necessary safety equipments & T&P such as Bamboo, Gumboots, Wire mesh, Panji, Hand cart, Gloves, Helmets, Gas mask with Oxygen cylinder, Safety belt, for successful running, operation & maintenance of STP. |
| 13 | Regular cleaning/ maintenance of parks, cutting of grass & hedging regularly by machine, grassing, plantation, replacement of dead plants by new one, adding of manure etc. including supply of grass cutting machine, rubber pipe for watering the plants & grass, scissors etc. in campus as per direction of Engineer by deploying minimum one Gardner, per day. |
| 14 | Providing Armed and Unarmed security Guards for watch and ward of existing assets in STP campus by providing minimum two Guard (one armed and one unarmed for 24 hours ) |
| 15 | Conducting required tests as per direction of Engineer in charge in STP laboratory by deploying one lab assistant of required qualification as per direction of E/I. keeping the record of tests and other data of plant in prescribed formats in register, sending the information of plant through messanger or through office telephone to office as desired. |
| 16 | Cleaning of Reactors, Polishing ponds, Sludge Drying Beds etc including bailing out of water from polishing ponds etc., supply of all labour, material, T&P required for proper completion of work as per direction of engineer in charge |
| 17 | Disposal of Silt upto a distance of 8 km from stp campus including supply of labour, material, T&P all complete as per direction of engineer in charge |
| 18 | Excavation of sludge cake (manure) from Sludge Drying Beds manually, and its carriage and stacking in a proper good manner at the specified place inside the campus of STP for sale if there is no sale of sludge cakes, the contractor shall have to remove this from site at his own cost as per direction of E/I. |
| 19 | deduct from sale of sludge cake @ 70% collected from the sludge beds the amount received in this head, shall be recovered from the running bills of the contracor recovery rate. |
| 20 | supply of Lab equipments, materials and chemicals etc all complete as per direction of engineer in charge |
| 21 | Supply & installation of 500 liter PVC tank for replacement of old damaged PVC tanks including all labour T&P etc. complete. |
| 22 | Ist class brick work with 1:4 cement and,Coarse sand mortar in Sub-structure in half brick wall including supply of all materials, labour , T&P etc required for proper completion of the work . |
| 23 | Ist class brick work in 1:6 cement ,Coarse sand mortar in foundationand plinth including supply of all materials, labour , T&P etc required for proper completion of the work . |
| 24 | C.C. work in Lintel with cement, coarse sand and 20 mm gauge approved stone ballast in proportion of (1:1.5:3) excluding supply of reinforcement and its bending, but including its fixing and binding the same with 0.50 mm thick binding wire (to be supplied by the contractors) and including necessary centring and shuttering supply of all materials, labour, T&P etc. required for proper completion of the work.Grouting of angle post with c.c.in column |
| 25 | C.C. work for platform under PTU unit with 20 MM STONE BALLAST, COARSE SAND AND CEMENT 4:2:1 Including supply of all material labour T&P etc. proper completion of the work. |
| 26 | P.C.C. with 40 MM Stone Ballast, Local Sand And Cement (12:6:1) In Foundations And Floors. Including supply of all material labour T&P etc. proper completion of the work. |
| 27 | Repairing of Following Size of Sluice valve including Carting & fixing of Sluice valves In proper position and making flanged joints including materials such as bolt nuts,Glan, Rubber insertion, white lead and testing etc.complete |
| 28 | 80 mm CI / DF Sluice Valve |
| 29 | 125 mm CI / DF Sluice Valve |
| 30 | Supply and fixing of M.S. angle 50mm x 50mm x 6mm size,32mm dia M.S.Pipe ,25mm M.S.Flate with hold fasts including simple moulding ,welding work and also supply of all materials, labour, T&P etc required for proper completion of the work as per direction of Engineer-in-charge. |
| 31 | 12 mm thick 1:3 plaster with cement ,Coarse sand mortar over brick work including supply of all materials , labour , T & P etc. required for proper completion of work . |
| 32 | Painting or varnishing of new iron or wood work with one coat of priming and two coats of approved paint & varnish including supply of all materials , labour , T & P etc. required for proper completion of the work . |
| 33 | Supply of all Material Labour T&P Wall Painting with One Priming Coat & Two Coat Of Oil Distemper On Plaster Area.also including necessary Scaffolding. |
| 34 | Supply Of 40mm Thick C.P. Teak Wood Door & Window Shutters With 9mm Thick Plywood Or Pressed Wood Panels And Fixing C.P. Teak Wood Cleats, Stops, Hinges, Lock, Bolts, Handlers, Springs & Other Fittings |
| 35 | Supply of all Labour & T&P to dismental the existing plaster including stacking of service material and disposal of unserviceable material upto 50 mtr. From the site of work |
| 36 | Supply and Carting of 32 mm dia GI medum (ISI mark) class pipe on reactors & PTU Unit including supply of all material, labour T&P etc. complete |
| 37 | G.I. Specials Extra (10%) |
| 38 | Fabrication Charge (cutting, welding, threading etc. complete as per direction of Engineer-in-charge.) (20%) |
| 39 | Supply of 12 mm gauge 2 ply barbed wire at site including its fixing fencing into post holes after streching it all labour T&P etc. required for proper completion of the work as per direction of engineeer incharge. |
| 40 | Supply, laying & jointing of 160 mm dia HDPE pipe with 5% spciales including all labour material T&P etc. proper required for completion of work. |
| 41 | Supply & fixing of 150mm dia sluice valve including all labour material T&P etc. proper required for completion of work. |
| 42 | E&M Works |
| 43 | Supply & Refilling of chlorine gas including carting, handling to plant etc complete in all respect. |
| 44 | Operation & Maintenance of Electromechanical items including DG, Pumps, Screens, Chlorination System, Areators, lighting, Control Panels etc and others Complete in all respect. |
| 45 | Charges for Diesel and Mobile oil required for Operation of DG Set complete with all cartage, loading & unloading, handling, refilling charges etc. complete in all respect. |
| 46 | Repairing & maintenance of DG Set |
| 47 | Supply and erection of M.S. Galvanized Octagonal pole ( as per BSEN 40-3-3:2003 /BSEN 10025/IS 2062 IS:875 Part-1 – 2015/ for MS plate for base flange )of 12 m length and dimension as per table P-01 with base plate on the cement concrete foundation of M- 20 grade (1:1.5:3) as per IS 456/IS 2911. with the help of anchor bolts of grade 6.8 (IS: 1367 P III ). The pole shall have a weatherproof flush door and locking arrangements & Top-100 mm Bottom-200 mm, Thikness-4 mm, Base Plate-320x320x20 mm (1 No.), arm for mounting 150 watt flood lights (1 No.), High Power LED Flood Light 150 W (1 No.) & Providing and fixing of fuse box size 250(H) x 200(W) x 150(D) mm, fabricated of 1.6mm MS sheet with hinged cover, dust and vermin, proof, rubber gasket, locking arrangement, duly holded with 2 nos, pole clamps of 20 mm x 3 mm flat with nut and bolts & one MCB , 4 nos. connector, cable glands of suitable size, complete with anticorrosive treatment, finished with two coat of approved enamel paint (1 No.), GI pipe earthing with GI wire (1 No.), Foundation (1 Job) & 2C, 6.0 Sq. mm CU Cable (12.5m per Pole) (12.5meter) , 4C, 16.0 Sq. mm AL Armoured Cable (30m per Pole) (30 Meter) & Cable Laying (30 Meter) complete with all required materials , fitting and labour etc. complete in all respect. Please Enable Macros to View BoQ information |