|
| 1 | MATERIAL |
| 2 | Providing and applying two coats of water proof cement paint of approved manufacture and of approved colour to the plastered surfaces including scaffolding if necessary, cleaning and preparing the surface, watering for two days etc. |
| 3 | Providing and applying plastic emulsion paint of approved quality, colour and shade to new surface in three coats including scaffolding, preparing the surface. (excluding primer coat) etc. complete. |
| 4 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) |
| 5 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) |
| 6 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, watering etc. complet |
| 7 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete. |
| 8 | Providing and laying Cast in situ/ReadyMix cement concrete in M15 of trap/granite/quartzite/gneiss metal for foundation and bedding/steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honey combed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honey combed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Woodencenteringwillnotbeallowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mixplant (Panmixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) |
| 9 | Providing and laying in situ/Ready Mix cement concrete M-20 of trap / granite /quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. including bailing out water, formwork, laying/pumping cover blocks, compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel) etc. complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality Artificial Sand |
| 10 | Providing, fabricating and erecting at site of work the tubular steel structure (shed) as per standard design and specifications having various spans in between trusses and in multiples of standard length of bays as specified as per standard specifications, inclusive of cost of steel tubular trusses, tubular columns purlins, tie runners, foundation bolts, base plates, nuts and bolts, welding wherever required etc. as per detailed drawing inclusive of one coat of anticorrosive paint and two coats of oil painting of approved quality and shade etc. complete.Spec. No. : As directed by Engineer-in-charge. |
| 11 | Providing and fixing corrugated galvanised iron sheets of 0.63mm thick (24 B.W.G.) for roofing without wind tiles including fastening with galvanised iron screws and bolts, lead and bitumen washers as per drawing etc. complete.(Weight of 5.5 kg/sq.m.).SSR I.No. 38.04 |
| 12 | Providing and supplying skilled Superwiser with uniform dress code and with necessary safety equipment for various works related cleaninig of verious placess in mc |
| 13 | Providing and supplying unskilled labour with uniform dress code and with necessary safety equipment for various works related cleaninig of verious placess in mc |
| 14 | RWH - Shallow Percolation Pit providing, constructing 2.0m deep shallow depth percolation pit comprising of 1.0m dia pre-cast RCC rings, 300mm thick side filling around outside of RCC rings (annular space) with 40mm size boulders including filling of percolation pit up to 0.5m depth (from bottom up) with 25-75mm clean washed gravels followed by 0.5m depth of 10-25mm of clean washed stones followed by 0.5m of washed river fine aggregate (natural sand/crushed sand VSIgrade finely washed etc.) including netlon mesh between each gravel/fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) media layer including covering with RCC slab, manhole frame & cover, PVC rungs etc. including arrangement for inlet & outlet pipe, excavation & backfilling as shown in the drawing. The rate shallbe inclusive of all labour, material, wastage, scaffolding, transportation, taxes, including all leads, lifts at all levels. All material should be of approved make. All works complete as per the drawing, technical specification and direction of the Engineer in charge SSR I.No 48.46 |
| 15 | Providing, supplying of PVC pipe & laying water supply-lines from RWH-tank/Well/Bore-well to UG-Flushing-tank,Supp 6 inch |
| 16 | Providing, supplying PVC bend 90 degree & laying water supply-lines from RWH-tank/Well/Bore-well to UG-Flushing-tank,Supp 6 inch |
| 17 | Providing, supplying of PVC pipe & laying water supply-lines from RWH-tank/Well/Bore-well to UG-Flushing-tank,( 4 inch Pipe) |
| 18 | Providing, supplying PVC bend 90 degree & laying water supply-lines from RWH-tank/Well/Bore-well to UG-Flushing-tank, ( 4 inch Pipe) |
| 19 | Supply Of Jcb Including Fuel And Driver. |
| 20 | Supply Of Tractor Including Fuel And Driver. Up to 5 km |
| 21 | Transportation of material obtained from debris of various sorts including necessary excavation/ loosing including loading, unloading and conveying and disposing as directed. |
| 22 | (a) For 1 Km. |
| 23 | (b) For 2 Km. |
| 24 | (c ) For 3 Km. |
| 25 | (d) For 4 Km. |
| 26 | (e) For 5 Km. Please Enable Macros to View BoQ information |