|
| 1 | Sub Estimate No.(I) Cleaning of Roads. Sweeping of road carriage way, footpath & central verge every alternate day in a month and open land width two times in a month including removing weeds, shrubs garbage in land width of roads including disposing off the garbage outside the area & cleaning storm water, drainage line including all labour, tools and plants, cleaning material required for job etc. The road surface shall be cleaned by the mechanical sweeping machine and the footpath and the balance land width portion shall be cleaned by manually with brooms etc. complete. Manual cleaning for road land width by brooms |
| 2 | Manual cleaning for road Footpath & Central Verge by brooms |
| 3 | Mechanical cleaning |
| 4 | Disposing of garbage in Tipperas directed thrice in week i.e. 1/2 for each trip. Rental Tipper as (Rate taken from PWD SSR for the year 22-23) as required or as directed by Enginner-in-charge. |
| 5 | Engaging unskilled labour for Cleaning of drainage line, drainage chamber and gutter etc. 6 times/month as required or as directed by Enginner-in-charge. |
| 6 | Sub Estimate No. (II)- Maintenance of tree Plantation. Maintenance of tree plant including pruning, trimming, removing grass, shrubs and watch and ward etc. completed for the period of 12 months.a) In fenced area. b) Along road side or periphery |
| 7 | Providing water supply arrangement including labour charges and tools for watering tree plants for the period one month .. Etc complete a) In fenced area. b) Along road side or periphery |
| 8 | Maintenance of shrubbery bed including, watering, removing weeds, cutting, trimming, applying the dose of manure & insecticides etc complete. |
| 9 | roviding the drip Irrigation system for single, double or multi rows of approved brand like Jain irrigation, Finolex EPC or equivalent for plantation below 0.3 mtrs ground including excavation, testing and commissioning as directed, including LD mains, spaghaty pipes, non openable constant pressure dripers, PP bowl valves as required etc. complete (every single row shall be counted for measurement) a) 16mm dia |
| 10 | b) 12mm dia |
| 11 | c) 16mm line dripper |
| 12 | d) 12mm line dripper |
| 13 | e) 6mm dia laterial |
| 14 | f) 4 lit./PH dripper |
| 15 | g) 2 lit./ PH dripper |
| 16 | Uprooting the weeds from the trenched area after 10 to 15 days of flooding with water including disposal of uprooted vegetation. |
| 17 | GARDEN SOIL:-Supplying on site garden soil well sieved 80 % to pass through I.S. sieve of 10 mm size free from stones rubbish like dried grass roots and other such materials. The soil should be fresh from quarry. The color of the soil generally is red. The soil will be measured by measuring box. (Farma) Item includes Transporting, loading -unloading etc (.Lead charges per 35 km. considered Excluding royalty.) |
| 18 | FARM YARD MANURE:-Supplying on site well decayed, well dried, well powdered, without clods and free from stones, dried grass and other rubbish material. The color of the manure generally is black. The manure will be measured by measuring box.(Farma) Item includes Transporting, loading -unloading etc (.Lead charges per 30 km. considered.) Please Enable Macros to View BoQ information |