| 1 | Details of works |
| 2 | 33 KV XLPE Cable(3X300SQ MM) 2CKT |
| 3 | 33 KV Cable Jointing Kit Straight through |
| 4 | 33 KV Cable Jointing Kit Outdoor |
| 5 | G.I. Pipe 6\\" Dia |
| 6 | NUT &BOLT WITH WASHER |
| 7 | Clamp for holding of GI Pipe |
| 8 | Laying of 33 kv cable machine / manual drilling method |
| 9 | Fixing of Heat Shrinkable type intermination kit for 33 kv 3x300 sqmm. XLPE |
| 10 | Outdoor jointing kit |
| 11 | Straight Thourgh Jointing kit |
| 12 | Hoisting of 33 kv 3x300 sq.mm. cable with o/d cable box & GI Pipe 3 mtr long on double pole with jumpering |
| 13 | STP 11 Mtr. Long |
| 14 | Stone Pad |
| 15 | Top Channel 100X50X3200mm |
| 16 | Cross Bracing M.S. Angle with Clamp |
| 17 | DISC FITTING |
| 18 | 33 KV Disc Insulator Polymer |
| 19 | 33 KV Pin Insulator |
| 20 | P.G. Clamp |
| 21 | Barbed wire |
| 22 | Danger Board with clamp Nut & Bolt |
| 23 | Grouting Material of STP |
| 24 | Earthing Complete |
| 25 | F-Bracket |
| 26 | Stay Set Complete |
| 27 | Grouting material of Stay |
| 28 | Aluminum Paint |
| 29 | Erection, grouting and earthing of 11 Mtr. Long Double pole support with fixing of necessary clamp & other accessories |
| 30 | Painting of Double pole with Al. paint |
| 31 | A.B.C. Cable (3X120+1X95+1X16)mm2 |
| 32 | A.B.C. Cable (3X95+1X70+1X16)mm2 |
| 33 | Dog conductor for support of STP |
| 34 | 9 Mt. Long STP |
| 35 | I-Hook |
| 36 | Dead End Clamp |
| 37 | Suspension Clamp |
| 38 | Piericing Connector 120 mm2 |
| 39 | Piericing Connector 90 mm2 |
| 40 | Distribution Boxes with accessories |
| 41 | Off/On Switch for Street Light |
| 42 | L.T. Clamp for STP for Section Joint |
| 43 | L.T. Insulator |
| 44 | Erection of 9/11 Mtr STP |
| 45 | Spreading & Hanging of ABC |
| 46 | Fixing of LT Distribution box for ABC |
| 47 | Erection & Grouting of stay rod with nazoling |
| 48 | Painting of 9/11 Mtr. STP single pole with Al. Paint |
| 49 | Distmantling of old line and Pole Please Enable Macros to View BoQ information |