| 1 | The work of safe carriage of the following material from Byebagh store center to work site under the jurisdiction of EDD- Shajahanpur. Approx. distance upto 80 KM. Including safe loading and unloading. |
| 2 | PCC Ple 8.5/ 9/11 meter Long. |
| 3 | STP 9/11/13 Meter Long. |
| 4 | Erection of new PCC Single@Double Pole in H.T/L.T Line Including fitting of all accessories as per RESSPO Norms. |
| 5 | PCC Pole 8.5 /9/11 meter Long Sngle Pole. |
| 6 | PCC Pole 8.5 /9/11 meter Long Double Pole. |
| 7 | ST Pole 9/11/13 Meter Long Single Pole. |
| 8 | ST Pole 9/11 Meter Long Double Pole. |
| 9 | Grouting with 1:4:8 mixture In Size(450x450x1500mm) Including cost of cement/BB & sand required as per RESSPO Norms |
| 10 | PCC Ple 8.5/9/11Meter Long Single Pole |
| 11 | PCC Ple 8.5/9/11Meter Long Double Pole |
| 12 | ST Pole 9/11/13 Meter Long Single Pole. |
| 13 | ST Pole 9/11/13 Meter Long Double Pole. |
| 14 | The work of Driving the earthing electrode and making connections with 6 S.W.G GI Wire as per RESSPO Norms. |
| 15 | Laying stringing & sagging of Following Conductor Complete in all respect |
| 16 | ACSR Weasal Conductor |
| 17 | ACSR rabit/Dog Conductor |
| 18 | 3 Phase arial Bunched Conductor |
| 19 | 1 Phase Arial Bunched Conductor |
| 20 | Mounting of CT PT unit on double Pole. |
| 21 | UNDER GROUND LAYING OF FOLLOWING CABLE IN SINGLE CIRCUIT ON RIVER SAND TO DOUBLE POLE SITUATED AT BOTH SIDES OF ROAD COMPLETE IN ALL RESPECT. MINIMUM DEPTH SHOULD BE 0.75 METER AND CABLE SHOULD BE COVERED BY BRICKES FROM THREE SIDES. ALONG WITH FILLING OF 04 NOS. CABLE JOINING KITES. |
| 22 | 11 KV XLPE Cable Size 3x70 SQMM |
| 23 | 11 KV XLPE Cable Size 3x185 SQMM |
| 24 | Construction of Plinth |
| 25 | Fencing of Plinth |
| 26 | The work of digging of pits, erection of stay Clampm, insulator etc. |
| 27 | INSTALLATION OF X ARM |
| 28 | Mounting of Following Capacity Transformers as per norms complete in all respect. |
| 29 | 250/400 KVA T/F |
| 30 | Fixing of Distribution Box complete in all respect |
| 31 | Guarding at road crossing complete in all respect |
| 32 | Dismantling of Lines |
| 33 | Safe back carriage of scrap (if any) from work site to bye bagh stroe shahjahanpur approx distance upto 80 KM including safe loading and unloading. |
| 34 | Fabrication works |
| 35 | Dismantling of T/F KVA/ 25 KVA/63KVA/100 KVA |
| 36 | Fixing and Providing of x-ARM Clamp. |
| 37 | Fixing and Providing of Stay Clamp. |
| 38 | Fixing and Providing of top Channel Clamp. |
| 39 | Fixing and Providing of TEE OFF CHANNEL Clamp. |
| 40 | Fixing and Providing of LT CLAMP FOR PCC/ STP . |
| 41 | Fixing and Providing of DED AND CLAMP FOR PCC/STP. |
| 42 | Fixing and Providing of SUSPENSION CLAMP FOR PCC/STP. |
| 43 | Fixing and Providing of GI HOOK FOR PCC/STP. |
| 44 | Fixing and Providing of NUT AND BOLT OFF Size. |
| 45 | Fixing and Providing of PRC Connector |
| 46 | Fixing and Providing of LT PG Clamp |
| 47 | Repair of damaged/rusted 11 Mtr Long STP Pole Site-Near Power House Bahadurganj with the help of 03 No. MS 65*65*6/1.60 Mtr long angle work, Opening of insulator binding , alignment of damaged rusted pole , digging of pits, fitting and welding of angle work |
| 48 | Maintenanaince of VCB with Supply of Material |
| 49 | Sagging & Stringing of LT line(3 Phase/ Single Phase) |
| 50 | Sagging & Stringing of LT line(3 Phase/ Single Phase) |
| 51 | Fixing and Providing of All Lugs . |
| 52 | Fixing and Providing of LT Rods for 25/63/100 KVA |
| 53 | Cutting/Chopping of Tree Branches. Please Enable Macros to View BoQ information |