|
| 1 | Cartage of following material from store center Meerut to Vice-Versa of work Including loading & unloading at both ends maximum distance up to 100 Km. as per direction of Superintending Engineer. :– |
| 2 | A) PCC/STP Pole 8.5 mtr /11/13 mtr. Long |
| 3 | (B) 10 to 400 KVA T/F |
| 4 | Line material such as HT/LT cross arm, HT/LT pin insulator, HT/LT Pin, HT/LT disc insulator with fitting, stay rod, stay wire, LT AB cable (3x120) sq. mm./(3x95) sq.mm. ACSR Conductor, GI wire, MS Angle, Iron and MS channel , TPMO, Fuse set, Earthing J hook, GI wire for guarding, MS Nuts and Bolts, suspension clamp etc . |
| 5 | Distribution Box single phase/three phase. |
| 6 | Erection of PCC/STP Pole 8.5 mtr/11/13 Mtr. long after digging a pit of size 1.6 mtr deep in all type of soil including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo) |
| 7 | Fabrication and fixing of all HT/LT line accessories (as per Uppcl Respo) |
| 8 | Mounting of 10 to 400 KVA Transformer as per site |
| 9 | Erection of Double Pole on PCC/STP pole 8.5 mtr/11/13 Mtr. long after digging a pit of size 1.6 mtr deep in all type of soil for each pole including grouting ratio (1:4:8) & back filling of the pole with proper ramming after completion of work. (as per UPPCL Respo) |
| 10 | Fabrication and fixing of MS angle and MS channel, fixing all HT/LT accessories TPMO, Fuse set HT/LT pin insulators on double pole. (as per Uppcl Respo) |
| 11 | Erection of stay set complete after digging a pit of size 1.6 mtr deep and grouting the same in block of size 0.60x0.60x0.30 mtr and nuzzling at the both ends and filling the pit with excavated earth soil with proper ramming. (as per Uppcl Respo) |
| 12 | Laying, lifting, strainging & proper sagging of old ACSR conductor for 3 phase 3 wire HT/LT line including, binding & jumpering properly (as per uppcl Respo) |
| 13 | Laying of LT ABC cable of various size including fixing of all LT ABC Cable accessories on suport. (as per UPPCL Respo) |
| 14 | Fixing of distribution box including fixing the cable from transformer and and consumer service cable. (as per UPPCL Respo) |
| 15 | Earthing of each HT/LT line pole & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with G.I Wire. (as per uppcl respo) |
| 16 | Guarding of line with G.I Wire having 2 nos. horizontal wire & 3 mtr. Distance odf laces of ten 6 SWG/8SWG, G.I wire complete work in all respect (as per uppcl respo) |
| 17 | Open the binding and resagging of existing HT/LT line. |
| 18 | Dismentling of STP Pole/R.S Joist by digging the pits & removal of complete HT/LT line accessoires (as per uppcl respo) |
| 19 | Straigthing Titled pole due to storm & resagging of conductor/cable after opening the binding and making properly (as per UPPCL RESPO) |
| 20 | Providing and fixing of F clamps (as per direction of Supervising Engineer) |
| 21 | Providing and fixing of Holding clamps (as per direction of Supervising Engineer) |
| 22 | Providing & Fixing of MS Nut & Bolts (as per direction of supervising Engineer) |
| 23 | Cutting & Chopping tree branches near side of line for making the clearance between line and tree. |
| 24 | Back cartridge ST pole/R.S Joist from work site central to store Meerut L.S |
| 25 | Back Cartage 10 to 400 KVA T/F Please Enable Macros to View BoQ information |