|
| 1 | Hire and labour charges for supply , fixing and dismantling of 4'20 w LED tube light fitting with tube on existing support (one Trial day and one end day) 2 day |
| 2 | Hire charges for maintaining of supply , fixing and dismantling of 4'20 w LED tube light fitting with tube on existing support (14 days) |
| 3 | Hire and labour charges for supply, fixing and dismantling of 200 w LED fitting with suitable cross arm on existing support one trial day (one Trial day and one end day) 2 days |
| 4 | Hire charges for maintaining 200 w LED fitting (14 days) |
| 5 | Hire and labour charges for 6Mtr GI Post from one trial day and One End day 2 days |
| 6 | Hire charges for for maintaining 6Mtr GI Post from one trial day and One End day (14 days) |
| 7 | Hire and labour charges for supply , fixing and dismantling of AC Ceiling fan on existing clamp or support (one Trial day and one end day) (2 days) |
| 8 | Hire charges for maintaining from and dismantling of AC Ceiling fan on existing fan or support (14 days) |
| 9 | Hire and labour charges for supply, fixing and dismantling 16\\" pedestal fan (One trail day and one End Day) (2 days) |
| 10 | Hire charges for for maintaining 16\\" pedestal fan (14 days) |
| 11 | Hire and labour charges for supply, fixing and dismantling 15A / 5 Amps plug board (2 days) |
| 12 | Hire charges for maintainence of supply, fixing and dismantling 15A / 5 Amps plug board (14 days) |
| 13 | Hire and labour charges for supply, run off and dismantling of 2 x 3/20 PVC copper wires on bearer wire one trial day (2 days) |
| 14 | Hire charges for maintaining 2 x 3/20 PVC copper wire on bearer wire(around strong room building, fire service, toilets, agents room lights and plugs)(14 days) |
| 15 | Hire and labour charges for maintaining 2 x 7/20 PVC copper wire on bearer wire(around strong room building, fire service, toilets, agents room lights and plugs) (2 days) |
| 16 | Hire charges for maintaining 2 x 7/20 PVC copper wire on bearer wire(around strong room building, fire service, toilets, agents room lights and plugs) (14 days) |
| 17 | Hire and labour charges for supply, run off and dismantling of 4 x 7/20 PVC copper wires on bearer wire one trial day for external lights upto main gate (2 days) |
| 18 | Hire charges for maintaining 4 x 7/20 PVC copper wire on bearer wire for external lights upto main gate (14 days) |
| 19 | Hire and labour charges for supply, run off and dismantling of 4 core 7/16 flexible wires on bearer wire (one trial day and one End day) (2 days) |
| 20 | Hire charges for maintaining 4 core 7/16 flexible wires wire on bearer wire (14 days) |
| 21 | Hire and labour charges for supply, run off and dismantling of 4 core 10/6 Sq mm flexible PVC copper wires on bearer wire (one Trial day and one end day) (2 days) |
| 22 | Hire charges for maintaining 4 core 10/6 flexible PVC copper wire (14 days) |
| 23 | Hire charges for supply, laying and dismantling of 4x19/16 Sqmm LTUG cable (one Trial day and one end day) (2 days) |
| 24 | Hire charges for maintaining 4x19/16 sqmm LTUG cable (14 days) |
| 25 | Hire and labour charges for supply, installation and dismantling of 100A Panel Board with 100A TPN Switch & 7 Nos. 63A DPMCB switch and 8 nos 32A TPMCB with indicator and necessary connection. (one Trial day and one end day) (2 days) |
| 26 | Hire charges for maintaining 100A Panel Board with 100A TPN Switch & 7 Nos. 63A DPMCB switch and 8 nos 32A TPMCB with indicator and necessary connection. (14 days) |
| 27 | Hire and labour charges for supply, fixing and dismantling of 100A change over switch with connection (one Trial day and one end day) (2 days) |
| 28 | Hire charges for maintaining 100A change over switch (14 days) |
| 29 | Hire and labour charges for supply, installation and dismantling of 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch and 8 nos 32A TPMCB with indicator and necessary connection. (one Trial day and one end day) (2 days) |
| 30 | Hire charges for maintaining 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch and 8 nos 32A TPMCB with indicator and necessary connection. (14 days) |
| 31 | Hire and labour charges for supply, fixing and dismantling of 250A change over switch with connection (one Trial day and one end day) (2 days) |
| 32 | Hire charges for maintaining 250A change over switch with Connection (14 days) |
| 33 | Hire and labour charges for supply, fixing, operating and dismantling of 125KVA diesel Generator set excluding diesel and with operator charges. One trial day (2 days) |
| 34 | Hire charges for maintaining 125 KVA towing type diesel Generator set (14 days) |
| 35 | Hire and lobour charges for supply, fixing, operating and dismantling of 250KVA diesel Generator set excluding diesel and with operator charges.(one Trial day and one end day)(2 days) |
| 36 | Hire charges for maintaining 250KVA diesel Generator set (14 days) |
| 37 | Hire and Labour charges for supply, run off and dismantling of 3.5 X 50 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) (2 days) |
| 38 | Hire r charges for maintaining 3.5 X 50 sqmm LTUG armoured cable (14 days) |
| 39 | Hire and Labour charges for supply, run off and dismantling of 4 x 120 sqmm LTUG armoured cable ((one Trial day and one end day) dismantling) (2 days) |
| 40 | Hire charges for maintaining from 4 x 120 sqmm LTUG armoured cable (14 days) |
| 41 | Hire and Labour charges for supply, run off and dismantling of 3 1/2 x 185 sqmm LTUG armoured cable ((one Trial day and one end day) dismantling) (12 days) |
| 42 | Hire charges for supply, run off and dismantling of 3 1/2 x 185 sqmm LTUG armoured cable ((one Trial day and one end day) dismantling) (14 days) |
| 43 | Hire and Labour charges for supply of earthing as per PWD standard (2 days) |
| 44 | Hire charges for earthing as per PWD standard (14 days) |
| 45 | Hire and labour charges for supply , fixing and dismantling of 32A DP MCB control switch for disconnecting power supply with 2Pole enclosure box (for Strong room and Store room) (2days) |
| 46 | Hire charges for maintenance of 32A DP MCB control switch for disconnecting power supply with 2Pole enclosure box (for Strong room and Store room) (14 days) |
| 47 | Hire charges for supply, run off and dismantling of 1No 15 Amps and 3nos 5A plugswith 12 Module box (Counting Hall computers,Printers and Xerox machine) (2 days) |
| 48 | Hire charges for maintaining of 1No 15 Amps and 3nos 5A plugswith 12 Module box (Counting Hall computers,Printers and Xerox machine) (14 days) |
| 49 | Hire and labour charges for supply, fixing of 5TR Slim package AC unit (2 days ) |
| 50 | Hire charges for Maintaining of 5TR Slim package AC unit (14 days ) |
| 51 | Hire and labour charges for supply, fixing of 2TR AC unit including transportation (2 days ) |
| 52 | Hire charges for maintaining of 2TR AC unit (14 days ) |
| 53 | Hire and labour charges forsupply of Air Cooler with Stand Two Days (2 days ) |
| 54 | Hire charges for maintaining of Air Cooler with Stand Two Days (14 days ) |
| 55 | Hire and Labour Charges for Supply and fixing of 2KVA Inverter with 4 hour backup capacity. (one trial day, & last day dismantling) (2 days ) |
| 56 | Hire charges for maintaining of 2KVA Inverter (14 days ) |
| 57 | Hire and Labour Charges for Supply and fixing of 5KVA UPS with 1 hour backup on full load operation for mentioned capacity. (one trial day, & last day dismantling) (2 days ) |
| 58 | Hire for maintenance of 5KVA UPS with 1 hour backup on full load operation for mentioned capacity. (14 days ) |
| 59 | Supply and fixing of Lightening arrestor with 1. Aluminium alloy Solid Round Conductor with 8mm dia of material AlMgSi as per IEC 62561-2 with Conductor Hold- er, glue, connectors, joints etc. - 2. Air termination rod 16/ 10 mm(1.2 metre Lightning rod) - 6 Nos 2. Air termination rod 16/ 10 mm(4 metre Lightning rod) - 1 No 3. 25mm X 6mm GI strip - 500 Mtrs 4. Earthing as per ISI specification with an earth electrode of 2.1 mtr class ‘B” GI pipe of dia not less than 40mm with copper earth plate of size 125mm x 50mmx6mm with necessary funneling arrangement with necessary masonry work with 38 mm RCC cover slab for brick masonry works. - 2 Nos |
| 60 | Hire Charges for maintainence of lighting arrestor (14 days) |
| 61 | Hire and labour charges for supply,fixing and dismantling Fire Alarm Panel(4 zone Panel) and transportation charges (on trial day and End day ) (2 days ) |
| 62 | Hire charges for maintaining of Fire Alarm Panel(4 zone Panel) for (14 days) |
| 63 | Hire and labour charges for supply,fixing and dismantling Smoke Detector and transportation charges (on trial day and End day ) (2 days ) |
| 64 | Hire charges for maintaining of Smoke Detector for (14 days) |
| 65 | Hire and labour charges for supply,fixing and dismantling Manual Call point and transportation charges (on trial day and End day ) (2days ) |
| 66 | Hire charges for maintaining of Manual Call point for (14 days) |
| 67 | Hire and labour charges for supply,fixing and dismantling sounder (one trial day, & last day dismantling) 2 days |
| 68 | Hire charges for supply,fixing and dismantling sounder 14 days |
| 69 | Hire and labour charges for supply,fixing and dismantling 2 Core 1.5 Sqmm Copper Armoured Cable (on trial day and End day ) (2 days ) |
| 70 | Hire charges for maintaining of 2 Core 1.5 Sqmm Copper Armoured Cable(14 days) |
| 71 | Hire and labour charges for supply,fixing and dismantling of 65 inches LED TV for observers room and Media Centre (One trial day and one end day ) (2 days ) |
| 72 | Hire charges for maintaining of 65 inches LED TV for observers room and Media Centre on (14 days) |
| 73 | 55 inch LED TV with stand and neceessary connection(observer Room and Collector Room) (2 days ) |
| 74 | Hire charges for Maintaining of 55 inch LED TV(observer Room and Collector Room) (14 days ) |
| 75 | Hire charges for supply, fixing & dismantling of PA system with necessary mic-2nos, Amplifer - 1no, and speaker -2 Nos,etc on Trial day and end day (2 days ) |
| 76 | Hire charges for maintaining of PA system with necessary mic-2nos, Amplifer - 1no, and speaker -2 Nos,etc on counting days (14 days ) |
| 77 | Hire and labour charges for supply,fixing and dismantling of 400 A ATS Panel (One trial day and one end day ) (2 days ) |
| 78 | Hire charges for maintaining of 400 A ATS Panel on (14 Days) |
| 79 | GST @ 18% Please Enable Macros to View BoQ information |