|
| 1 | Laying of Interlocking tiles & Rennovation work of Toilets |
| 2 | Earth work in excavation in ordinary soil (Loam,clay or sand) including lift up to 1.50 M and lead up to 30.M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-4/251) |
| 3 | Concrete in 1:6:12 with brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work.(Chpt-5/273) |
| 4 | Concrete in 1:2:4 with stone ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work.(Chpt-5/279a) |
| 5 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in Raft and wall i/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/287a) |
| 6 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in wall i/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/289) |
| 7 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone gritt of 2cm guage in slab i/c supply of all material,labour and T&P etc.including all complete of work,(Chpt-5/284a) |
| 8 | Supply and fixing of mild steel bars for RCC work and angle for channel including supply of all material,labour and T&P etc.required for proper completion of work,(As per SAIL) |
| 9 | Diversion of water for culvert including supply of all material,labour and T&P etc.required for proper completion of work, |
| 10 | Dismantling of old and damage Nala Brick work including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-17/692) |
| 11 | Deduction of old and workable brick 40% of above items including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-1/1a) |
| 12 | Disposal of Excavated Material material up to3km lead inc loading/unloading including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-3/231a) |
| 13 | M-150 brick work in 1:4 with cement, coarse sand mortar in super structure including supply of all material,labour and T&P etc.required for proper completion of work, |
| 14 | 12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work |
| 15 | Add sign board |
| 16 | As per Tax Please Enable Macros to View BoQ information |