| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil. |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause |
| 3 | Providing ,Laying Spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in sub base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 4 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60kg/sqm using mechanical means. |
| 5 | Providing and laying 40mm thick bituminous macadem with 100-120 TPH Hot mix plant producing an average output of 75 tones per hours using crused aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade level and alignment and rolled as per clauses 501.6 and 501.70 to achieve the desired compaction |
| 6 | Providing and applying tack coat with bitumen Packed (VG 10) pressure distributor at the rate of 0.20kg per sqm on the prepared granular surface cleaned with mechanical broom. |
| 7 | Providing and laying semi dense graded bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5to5.00 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. |
| 8 | Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory ompaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge 80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern. |
| 9 | Construction of Boundary/Compound wall with Pre-Cast & pre-stressed Concrete 1:1.5:3 Panel of size2.4*0.3*0.05 mts and column 0.15*0.15*3.0 mts (2.10 mt above ground level and 0.90 mt below Ground level including fixing of panel in column,in panel PCC steel with 6 mm & 4 pieces per set with stressing system and in column PCC steel with 6 mm & 7 pieces per set with stressing system, cost of all material labour and T&P etc. required for proper completion of work Please Enable Macros to View BoQ information |