| 1 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead. |
| 2 | Taking out existing CC interlocking Paver Blocks from footpath/central verge, including removal of rubbish etc. disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exccding 30 cm in depth, 1.5m in width or 10 sqm on plan) including disposal of excavated lead upto 50 mtr. & lift upto 1.5Mtr. dispose earth to be leveled & dressed. : All kinds of soil. The Contractor has to detect Different utilities like sewer line, water Supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge |
| 4 | Construction of granular sub base by providing close graded material, spreding in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) DSR 18/I.No. 4.1.8/P- |
| 6 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-in-charge. (The panel shuttering work shall be paid for separately).(Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). |
| 7 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). All works upto plinth level |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, Thermo Mechanically Treated bars of grade Fo_500D or more. Iten No.-5.22.6 |
| 9 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all loads including all lifts involved. |
| 10 | P/L applying tack coat using hot straight run bituman of grade 80/100 on bitumanious surface @0.50 kg/Sqm |
| 11 | Providing and laying Bituminous Concrete with higher capacity batch type Hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achieve the desired compaction as per Morth specification clause no 507 complete in all respects. |
| 12 | Painting with synthetic enamel paint of approved brand and manufacture of required to colour to give an even shade. Two or more coat on new work. (DSR 2018 I.No. 13.61.1/P-227) |
| 13 | Refixing of Mild Steel Railing including all labour, T & P etc. all complete as per direction or Engineer-in-charge. |
| 14 | Centring and shuttering including strutting, propping etc. and removal of form work for. Foundation, footings, bases of Columns etc for mass concrete. Please Enable Macros to View BoQ information |