Tender For N.S. Item , Provision For Providing And Installing Of Horizontal Centrifugal Pumping Sets For Raw Water Capable Of Delivering A Discharge Of (1100 Lpm) Per Hour Against A Head Of 12 Mtrs. Driven By Electric Motors. (Provision For Providing, Fatehabad-Haryana
TDR : 54974005
Tender Notice
BOQ
19 Days Left
Fatehabad
Haryana
Tender For N.S. Item , Provision For Providing And Installing Of Horizontal Centrifugal Pumping Sets For Raw Water Capable Of Delivering A Discharge Of (1100 Lpm) Per Hour Against A Head Of 12 Mtrs. Driven By Electric Motors. (Provision For Providing
Provision for providing and installing of horizontal centrifugal pumping sets for raw water capable of delivering a discharge of (1100 LPM) per hour against a head of 12 mtrs. driven by electric motors. (Provision for providing and installing of horizontal centrifugal pumpingsets for raw water capable of delivering a discharge of 13500 Glns.(1100 LPM) per hour against a head of 12 mtrs. driven by electricmotors 5.00 BHP)
3
Providing, instillation and commissioning of water proofing BS BL Led moving head light 30.00 W. light stage lighting with 4060 IS color by DMX and sound activated control spotlight for foundation including cost of wiring , connection, MCB, and other related accessories complete in all respect as per IS marked.
4
Providing , Installation and Commissioning of 150 Wattage LED lights outdoor with Lamp Operation Mode ON, OFF Light Source High Power SMD LED, Lamp Life span of LEDs used in the Luminaire shall be 0 ) 50000 hours. @l L70 ,Color rendering index (CRI) of the LEDs used in the luminaire shall be ) 70 including Cost of all accessors wiring and other material complete in all respect.
5
-Providing , Installation and Commissioning of 100Wattage LED lights outdoor with Lamp Operation Mode ON,OFF Light Source High Power SMD LED, Lamp Life span ofLEDs used in the Luminaire shall be 0 ) 50000 hours. @l L70 ,Color rendering index (CRI) of the LEDs used in theluminaire shall be ) 70 including Cost of all accessors wiringand other material complete in all respect.
6
Supply and erection of Raw Water Submersible Pumping Set Having discharge of 2100 LPM discharge with 25 Mtrs. Head. (25 BHP) with upto date amendment ISI Make complete in all respect. (supply and erection of Raw water submersible pumping set of 2100LPM discharge with 25 Mtrs. Head. (25 BHP))
7
Operation and Maintenance of Independent Canal based water works for complete scope of work mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. (1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
8
1st year Operation and maintenance after defect liability period
9
2nd year Operation and maintenance
10
3rd year Operation and maintenance
11
4th year Operation and maintenance
12
5th year Operation and maintenance
13
Item Description
14
HSR Item Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.