| 1 | Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment /dumping area with lead upto 1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. |
| 2 | Dismantling of existing structutres like culvert, bridges, retaining walls and other structure comprising of masonry, cement concree, wood. steel work, including T&P and scaffolding Wherever necessary, sorting the dismantled Material, disposal of unserviceable material and Stacking the serviceable material with all lifts and lead of 1000 metres Cement concrete Grade M15 & M20 |
| 3 | Dismantling stone masonry |
| 4 | Providing and laying of dry rubble flooring complete as per drawing and technical specification Clause 1303.3 |
| 5 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification.(PCC Grade M-15) |
| 6 | Stone masonry work in cement morter in foundation complete as per drawing and technical specification Clauses 702, 704, 1202 & 1203 (Square Rubble Coursed Rubble Masonary (1st sort) in CM 1:3) |
| 7 | Stone masonry work in cement morter in sub-structure complete as per drawing and technical specification Clauses 702, 704, 1202 & 1203 (Coursed Rubble Masonary in C.M. (1:3) in sub-structure |
| 8 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specification.(PCC Grade M-15) |
| 9 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specification.(PCC Grade M-20) |
| 10 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specification.(PCC Grade M-25 Deck slab) |
| 11 | Providing and laying cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and technical specification |
| 12 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specification |
| 13 | Plastering with cement mortar (1:3) 15mm thick on brick or stone masonary work in substructure as per technical specification Clauses 613.4 & 1204 |
| 14 | Providing weep holes in brick masonary/stone masonary, plain/reinforced concrete abutment, wing wall, return wall with 100mm dia AC pipe extending through the full width of the structures with slpoe of 1V:20H towards drawing face complete as per drawing and technical specification Clause 614, 709, 1204.3.7 |
| 15 | Item No.6. By Mix in Place Method (Grading - 1 material) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. |
| 16 | Item No.7. Separation Membrane of impermeable plastic sheeting 125 micron thick |
| 17 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering,- all work upto plinth level. 1:1.5:3, 20 mm nominal size |
| 18 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. |
| 19 | Centering and shuttering including strutting, propping etc and removal of form for Foundation, footing, base of columns etc for mass concrete |
| 20 | Filling in foundation trenches and plinth in layer not exceeding 150 mm.thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) |
| 21 | Backfilling behind abutment, wing wall and return wall with sandy material complete as per drawing and technical specification Clause 1204.3.8 |
| 22 | Cement |
| 23 | Steel |
| 24 | Chips |
| 25 | Metals |
| 26 | Boulder |
| 27 | GST @ 18% |
| 28 | Labour Cess @ 1% Please Enable Macros to View BoQ information |