| 1 | Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead. Dense or Hard soil |
| 2 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. |
| 3 | Providing and laying cement concrete 1:2:4 (1-Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth |
| 4 | Providing formwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. Height of propping and centering below supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in. (A) Foundations Footings Bases of Columns etc. and Mass concrete. |
| 5 | Brick work using common burnt clay building bricks having crushing strength not less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5 -fine sand)(A) Modular |
| 6 | (i) Half brick masonry in common brunt clay building bricks having crushing strength not less than 35 Kg/Sq.Cm. in Cement mortar 1:4 (1- Cement : 4 -coarse sand ) in foundation and plinth (A) Modular |
| 7 | Supplying of crushed stone aggregates, chippings etc. of hard stone of following nominal size free of disintegratedpieces deletarious and oraganic mater d grading asper I.R.C. Code.(vii)6mm |
| 8 | Providing and laying controlled cement concrete 1:1:2 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in Columns, Pillars posts and struts, upto floor two level. |
| 9 | Providing 20 mm thick double coat mala cement plaster on interior brick / concrete work for plastering comprising of base coat of 12 mm thick cement plaster in cement mortar (1 Cement : 4 coarse sand) in rough finishing and 8 mm thick top coat of cement mortar 1:2 (1 Cement : 2 Coarse sand) finished with trovel including scaffolding curing etc. complete. |
| 10 | Providing and fixing machine cut, mirror/ eggshell polished , Marble stone work for wall lining (veneer work) including dado, skirting, risers of steps etc., in required design and pattern (if required with marble stone slab pieces of different shapes, sizes & texture but of even thickness) on 12 mm (average) thick cement mortar 1:3 (1 cement : 3 coarse sand) laid and jointed with white cement slurry @ 3.3 kg/sqm including pointing with white cement slurry admixed with pigment of matching shade, including rubbing, curing, polishing etc. all complete as per Architectural drawings, and as directed by the Engineer-in-Charge.18. mm thick Italian Marble stone slab,Perlato, Rosso verona,Fire Red or Dark Emperadore etc. |
| 11 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. Flamed finish granite stone slab Jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent. per directions of site engineer. |
| 12 | Providing and fixing metal expansion joints as per drawings. Details of expansion joint 50 x 50 x 6mm size two IS and 100 x 6mm MS plate with 6 x 20 x 25mm long hold fast @ 50 cm / cc on both sides of expansion joints. |
| 13 | Providing TMT Bar FE 500D reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level Please Enable Macros to View BoQ information |