| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. S.O.R. Item No. 12.01 I B (i) |
| 2 | Construction of dry rubble flooring at cross drainage works for relatively less important works. S.O.R. Item No. 16.09 |
| 3 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. (P.C.C. Grade M-15) S.O.R. Item No. 12.08 A Case I |
| 4 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Square Rubble Coursed Rubble Masonry (1st sort) in C.M. (1:3) S.O.R. Item No. 12.07 (A) |
| 5 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specificationsCoarse Rubble Masonary in C.M. (1:3) in sub-structure S.O.R. Item No. 13.04 B |
| 6 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical speciofications (P.C.C. Grade M-15) S.O.R. Item No. 13.05 A (p) |
| 7 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical speciofications (P.C.C. Grade M-20 in S/S)S.O.R. Item No. 13.05 B (p) |
| 8 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical speciofications (P.C.C. Grade M-25 in Deck Slab) S.O.R. Item No. 13.05 F (p) |
| 9 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications S.O.R. Item No. 14.04 |
| 10 | Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications S.O.R. Item No. 13.06 |
| 11 | Plastering with cement mortar (1:3) on brick / stone masonary work in substructure as per technical specifications S.O.R. Item No. 13.03 |
| 12 | Providing weep holes in Brick / stone masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications. S.O.R. Item No. 13.08 |
| 13 | Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications S.O.R. Item No. 13.09 (B) |
| 14 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.Random Rubble Masonry Work in Cement Mortar 1:3 in foundation B.C.D.S.O.R. (5.2.29) |
| 15 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications Random Rubble Masonry Work in Cement Mortar 1:3 in S/S B.C.D.S.O.R.(5.2.32) |
| 16 | Pointing with cement mortar (1:3) on brick / stone masonary work in substrucutre as per technical specifications S.O.R. Item No. 13.02 |
| 17 | Carriage of materialsCement:- |
| 18 | Stone Chips |
| 19 | Stone Metal |
| 20 | Boulder |
| 21 | Steel |
| 22 | GST 18% |
| 23 | Labour Cess 1% Please Enable Macros to View BoQ information |