| 1 | Hire and labour charges for supply,fixing and dismantling of 200W LED fitting with suitable cross arm on existing support (One trial day and one end day ) 2 days |
| 2 | Hire charges for maintaining of 200W LED fitting for (14 days) |
| 3 | Hire and labour charges for supply,fixing and dismantling of Pedastal Fan on existing support (One trial day and one end day ) 2 day |
| 4 | Hire charges for maintaining of Pedastal Fan for (14 Days) |
| 5 | Hire and labour charges for supply, fixing and dismantling 48\\" Ceiling fan on the existing clamp or support (One trial day and one end day ) 2 day |
| 6 | Hire charges for maintaining of 48\\" Ceiling fan for (14 days) |
| 7 | Hire and labour charges for supply, fixing and dismantling of 4'40W patty tube light on the existing clamp or support (One trial day and one end day ) 2 day |
| 8 | Hire charges for maintaining of 4'40W patty tube light for (14 days) |
| 9 | Hire and labour charges for supply, fixing and dismantling of 15A / 5A plug sets (One trial day and one end day ) 2 day |
| 10 | Hire charges for maintaining of 5A / 5A plug sets for (14 days) |
| 11 | Hire and labour charges for supply, fixing and dismantling of 20A AC plug sets (One trial day and one end day ) 2 day |
| 12 | Hire charges for maintaining of 20A AC plug sets for (14 days) |
| 13 | Hire and labour charges for supply run off and dismantling of 4 x 185 sqmm LTUG Cable (One trial day and one end day ) |
| 14 | Hire charges for maintaining of 4 x 185 sqmm LTUG Cable for (14 days) |
| 15 | Hire and labour charges for supply run off and dismantling of 3 1/2 x 150 sqmm LTUG Cable (One trial day and one end day ) 2 day |
| 16 | Hire charges for maintaining of 3 1/2 x 150 sqmm LTUG Cable for (14 days) |
| 17 | Hire and labour charges for supply run off and dismantling of 3 1/2 x 120 sqmm LTUG Cable (One trial day and one end day ) 2 day |
| 18 | Hire charges for maintaining of 3 1/2 x 120 sqmm LTUG Cable for (14 days) |
| 19 | Hire and labour charges for supply run off and dismantling of 3 1/2 x 70 sqmm LTUG Cable (One trial day and one end day ) |
| 20 | Hire charges for maintaining of 3 1/2 x 70 sqmm LTUG Cable for (14 days) |
| 21 | Hire and labour charges for supply run off and dismantling of 3 1/2 x 50 sqmm LTUG Cable (One trial day and one end day ) |
| 22 | Hire charges for maintaining of 3 1/2 x 50 sqmm LTUG Cable for (14 days) |
| 23 | Hire and labour charges for supply run off and dismantling of 4 of 17/19 sq mm wire (One trial day and one end day ) |
| 24 | Hire charges for maintaining of 4 of 17/19 sq mm wire for (14 days) |
| 25 | Hire and labour charges for supply run off and dismantling of 4 of 19/16 sq mm wire (One trial day and one end day ) |
| 26 | Hire charges for maintaining of 4 of 19/16 sq mm wire for (14 days) |
| 27 | Hire and labour charges for supply run off and dismantling of 4 of 7/16 sq mm wire (One trial day and one end day ) |
| 28 | Hire charges for maintaining of 4 of 7/16 sq mm wire for (14 days) |
| 29 | Hire and labour charges for supply run off and dismantling of 4 of 19/18 sq mm wire (One trial day and one end day ) |
| 30 | Hire charges for maintaining of 4 of 19/18 sq mm wire for (14 days) |
| 31 | Hire and labour charges for supply run off and dismantling of 4 of 7/18 sq mm wire (One trial day and one end day ) |
| 32 | Hire r charges for maintaining of 4 of 7/18 sq mm wire for (14 days) |
| 33 | Hire and labour charges for supply run off and dismantling of 2 of 7/20 wire (One trial day and one end day ) |
| 34 | Hire charges for maintaining of 2 of 7/20 wire for (14 days) |
| 35 | Hire and labour charges for supply run off and dismantling of 2 of 2.5 sqmm wire (One trial day and one end day ) |
| 36 | Hire charges for maintaining of 2 of 2.5sqmm wire for (14 days) |
| 37 | Hire and labour charges for supply run off and dismantling of 2 of 4 sqmm wire (One trial day and one end day ) |
| 38 | Hire charges for maintaining of 2 of 4sqmm wire for (14 days) |
| 39 | Hire and labour charges for supply run off and dismantling of 2 of 6 sqmm wire (One trial day and one end day ) |
| 40 | Hire charges for maintaining of 2 of 6 sqmm wire for (14 days) |
| 41 | Hire and labour charges for supply,fixing and dismantling of Public address system with necessary - Mic -2Nos, Amplifier - 1No and speaker - 2 Nos etc., (One trial day and one end day ) |
| 42 | Hire charges for maintaining of Public address system with necessary - Mic -2Nos, Amplifier - 1No and speaker - 2 Nos etc., on (14 days) |
| 43 | Hire and labour charges for supply,fixing and dismantling of Earth pipe (One trial day and one end day ) (SR) |
| 44 | Hire charges for maintaining of Earth pipe for (14 days) |
| 45 | Hire and labour charges for supply,fixing and dismantling of 6mtr GI post for Focus light fitting (One trial day and one end day ) (SR) |
| 46 | Hire charges for maintaining of of 6mtr GI post for Focus light fitting for (14 days) |
| 47 | Hire and labour charges for supply,fixing and dismantling 100A Panel Board with 100A TPN Switch & 5 Nos. 30A TPN switch with Bus Bar (One trial day and one end day ) (SR) |
| 48 | Hire charges for maintaining of 100A Panel Board with 100A TPN Switch & 5 Nos. 30A TPN switch with Bus Bar for (14 days) |
| 49 | Hire and labour charges for supply,fixing and dismantling 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch(One trial day and one end day ) (SR) |
| 50 | Hire charges for maintaining of 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch for (14 days) |
| 51 | Hire and labour charges for supply,fixing and dismantling 63A Distribution Board with 63A TPN MCB & 18 Nos. 10-32A SP MCB Switch (One trial day and one end day ) (SR) |
| 52 | Hire charges for maintaining of 63A Distribution Board with 63A TPN MCB & 18 Nos. 10-32A SP MCB Switch for (14 days) |
| 53 | Hire and labour charges for supply,fixing and dismantling of 12 way SP MCB Distribution Board with 32A SPN MCB & 10 Nos. 10-32A SP MCB Switch (One trial day and one end day ) (SR) |
| 54 | Hire charges for maintaining of12 way SP MCB Distribution Board with 32A DP MCB & 10 Nos. 10-32A SP MCB Switch for (14 days) |
| 55 | Hire and labour charges for supply,fixing and dismantling of Exhaust Fan (One trial day and one end day ) |
| 56 | Hire charges for maintaining of Exhaust Fan (14 days) |
| 57 | Hire and labour charges for supply,fixing and dismantling of 2 KVA inverter with 4 hours backup (One trial day and one end day ) |
| 58 | Hire charges for maintaining of 2 KVA inverter with 4 hours backup for (14 days) |
| 59 | Hire and labour charges for supply,fixing and dismantling 250 A Change over switch for DG Set ( (One trial day and one end day ) |
| 60 | Hire charges for maintaining of 250 A Change over switch for (14 days) |
| 61 | Hire and labour charges for supply,fixing and dismantling 400 A Change over switch for DG Set ( (One trial day and one end day ) |
| 62 | Hire charges for maintaining of 400 A Change over switch for (14 days) |
| 63 | Hire and labour charges for supply,fixing and dismantling of 125 KVA Generator set (One trial day and one end day ) |
| 64 | Hire charges for maintaining of 125 KVA Generator set for (14 days) |
| 65 | Hire and labour charges for supply,fixing and dismantling of 250 KVA Generator set (One trial day and one end day ) |
| 66 | Hire charges for maintaining of 250 KVA Generator set for (14 days) |
| 67 | Hire and labour charges for supply,fixing and dismantling 2 TR split type AC units including erection, gas filling, Testing dismantling and transportation charges (for observer Room) (on trial day ) |
| 68 | Hire charges for maintaining of 2 TR split type AC units on (14 days) |
| 69 | Hire and labour charges for supply,fixing and dismantling Air Cooler with Stand (on trial day ) (SR) |
| 70 | Hire charges for maintaining of Air cooler with stand on for (14 days) |
| 71 | Hire and labour charges for supply,fixing and dismantling stabilizer for AC units dismantling and transportation charges (on trial day ) |
| 72 | Hire charges for maintaining of stabilizer for AC units on (14 days) |
| 73 | Hire and labour charges for supply,fixing and dismantling Fire Alarm Panel(4 zone Panel) and transportation charges (on trial day and End day ) |
| 74 | Hire charges for maintaining of Fire Alarm Panel(4 zone Panel) for (14 days) |
| 75 | Hire and labour charges for supply,fixing and dismantling Smoke Detector and transportation charges (on trial day and End day ) |
| 76 | Hire charges for maintaining of Smoke Detector for (14 days) |
| 77 | Hire and labour charges for supply,fixing and dismantling Manual Call point and transportation charges (on trial day and End day ) |
| 78 | Hire charges for maintaining of Manual Call point for (14 days) |
| 79 | Hire and labour charges for supply,fixing and dismantling Hooter and transportation charges(on trial day and End day ) |
| 80 | Hire charges for maintaining of Hooter for(14 days) |
| 81 | Hire and labour charges for supply,fixing and dismantling 2 Core 1.5 Sqmm Copper Armoured Cable (on trial day and End day ) |
| 82 | Hire charges for maintaining of 2 Core 1.5 Sqmm Copper Armoured Cable(14 days) |
| 83 | Hire and labour charges for supply,fixing and dismantling of 65 inches LED TV for observers room and Media Centre (One trial day and one end day ) |
| 84 | Hire charges for maintaining of 65 inches LED TV for observers room and Media Centre on (14 days) |
| 85 | Hire and labour charges for of 1. Aluminium alloy Solid Round Conductor with 8mm dia of material AlMgSi as per IEC 62561-2 with Conductor Hold- er, glue, connectors, joints etc. - 2. Air termination rod 16/ 10 mm(1.2 metre Lightning rod) - 6 Nos 2. Air termination rod 16/ 10 mm(4 metre Lightning rod) - 1 No 3. 25mm X 6mm GI strip - 500 Mtrs 4. Earthing as per ISI specification with an earth electrode of 2.1 mtr class ‘B” GI pipe of dia not less than 40mm with copper earth plate of size 125mm x 50mmx6mm with necessary funneling arrangement with necessary masonry work with 38 mm RCC cover slab for brick masonry works. - 2 Nos |
| 86 | Hire charges for lighting arrestor (14 Days) |
| 87 | Hire and labour charges for supply,fixing and dismantling of 400 A ATS Panel (One trial day and one end day ) |
| 88 | Hire charges for maintaining of 400 A ATS Panel on (14 Days) |
| 89 | Hire and labour charges for supply,fixing and dismantling of 5 KVA inverter with 1 hour backup (One trial day and one end day ) |
| 90 | Hire charges for maintaining of 5 KVA inverter with 1 hour backup for(14 Days) |
| 91 | Hire and labour charges for supply,fixing and dismantling of Refrigerator (One trial day and one end day ) |
| 92 | Hire charges for maintaining of Refrigerator for (14 Days) |
| 93 | GST at 18% Please Enable Macros to View BoQ information |