| 1 | Removal of slip in all kind of soil ( including saturated soil but excluding boulders and rocky portion requiring blasting upto a distance of 1.20 mtr disposing of unserviceable materials stacking serviceable materials and neatly dressing the surface. |
| 2 | Chiselling/wedging out of rock where blasting id prohibited: Hard rock |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means overareas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including gettingout and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineerin-charge. |
| 4 | Providing & making Gabion structure with Mechanically Woven Double TwistedHexagonal/Square Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause2500, of required size, Mesh Type 10x12 ([=100 mm with tolerance of ± 2%) Zinc coated, Meshwire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m intervaland shall have minímum 10 numbers of openings per meter of mesh perpendicular to twist,tying with lacing wire of diameter 2.2mm, supplied @3% by weight of Gabion boxes, filledwith boulders with least dimension of 200 mm, as per drawing, all complete as per direction ofEngineer-in-charge. |
| 5 | Stone Soling/dry stone packing/Dry stone masonry as per direction of EIC |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness)including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, stringor lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets,sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and|finishing:1:1/2:3 (1 cement: 1½ coarse sand): 3 graded stone aggregate 20 mm nominal size) |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inposition and binding all complete upto plinth level. |
| 8 | Centering and shuttering including strutting, propping ete. and removal of form work Please Enable Macros to View BoQ information |