| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: Superintending Engineer, Kanupur Rehabilitation Camps & Building Division, Basudevpur,Dist-Keonjhar Name of Work:- “Construction of Kirtan Mandap at Jagannathpur for the DPs of village Rugudi”. Contract No: SE, KRC & BD-25/2025-2026 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER# NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SlNo. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P. Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT Rs. P. TOTAL AMOUNT In Words |
| 2 | Earth work in excavation of foundation in hard soil or gravelly soil with all leads & lifts with shoring and shuttering with working pump if required etc. complete as per the direction of the Engineer-in-charge. |
| 3 | Supplying & filling foundation & plinth with sand well watered and rammed including all cost of materials, labour charges etc. complete as per the direction of the Engineer-in-charge. |
| 4 | Cement concrete ( 1:3:6) in foundation and floors using 4 cm size black hard crusher broken granite stone metal (free from weathered skinned & debris etc.) of approved quality including cost and conveyance royalities of all materials and cost of all labour with T& P required for the work complete and as directed by the Engineer-in-charge . |
| 5 | R.C.C/C.C work M-20 using 20mm size down graded black hard crusher broken granite chips (free from weathered skinned and debris) etc. including hoisting, lowering, laying and compacting concrete using vibrator watering , and curing for 28days including cost, conveyance, royalities of all materials & cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of m.s Rod or Tor steel and binding wires and labour charges for bending binding and tying the grill etc. complete and as directed by the Engineer-in-charge |
| 6 | Rigid & smooth centering and shuttering for R.C.C./C.C.works including falseworks and dismentaling then after casting including cost of materials with cost of all labour with T&P required for the work etc. complete as directed by Engineer-in-charge..a) Foundation footing and column base & plinth beam. |
| 7 | (b)Column & beam , Ground Floor |
| 8 | (C)Lintel |
| 9 | (D)Roof slab |
| 10 | Providing F.A. Brick masonry in C.M. (1:6) using F.A. bricks of approved quality having crushing strength not less than 75 kg/cm2 in including all costs, conveyance, royalty of all materials and cost of all labour with T & P required for the work and with all leads, lifts & delifts including watering, curing & scaffolding etc. all complete as per per drawing & specification and as directed by the Engineer-in-charge.a) Foundation and plinth |
| 11 | 12mm (1/2\\") thick cement plaster ( 1:6) finished smooth to outside smooth surface of brick walls after rackingout the joints including watering and curing etc. scaffolding if requiredetc. complete with cost, conveyance, royalities and taxes of all materials with cost of all labour with T&P required for the work etc. complete as directed by Engineer-in-charge. |
| 12 | 6mm thick cement plaster ( 1:4) finished smooth to R.C.Csurface or ceiling including watering and curing etc. scaffolding if requiredetc. complete with cost, conveyance, royalities and taxes of all materials with cost of all labour with T&P required for the work etc. complete as directed by Engineer-in-charge. |
| 13 | Providing and fixing vetrified tile in dadoos and skirting and risers of steps in 12 mm thick cement plaster (1:3) jonted with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing complete including all cost conveyance and labour etc. complete as per the direction of the Engineer-in-charge. |
| 14 | Providing and fixing vetrified tile in floors treads or steps and landing on 20 mm thick bed of cement mortar (1:4) (1 cement : 4 sand) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing complete including all cost conveyance and labour etc. complete as per direction of the Engineer-in-charge. |
| 15 | Providing 2.5 cm thick grading concrete (1:2:2) on roof slab with 6 mm size crusher broken granite chips (free from weathered skin and debris etc.) on new works including watering and curing including cost, conveyance, royalty, taxes etc. of all the materials and labour etc. complete as per the direction of the Engineer-in-Charge. |
| 16 | Painting two coat with weathercoat over one coat of primer including cost,coveyance,royality & T& P materials labour etc.complete as per the direction of the Engineer in charge. |
| 17 | Painting two coat with Distemper over one coat of wall primer including cost,coveyance,royality & T& P materials labour etc.complete as per the direction of the Engineer in charge. |
| 18 | Providing fitting, fixing of M.S. grills,door ,window ,shutter & staircase hand rail of different size as per the approved design including cost of all materials, labour and conveyance etc. complete as per the direction of the Engineer-in-Charge. |
| 19 | Painting two coats with enamel paint over a coat of red oxide primer to give an even shade including cost of primer, paint & labour and T & P required for the work etc. complete as per the direction of the Engineer-in-Charge. |
| 20 | Cutting , straightening, coiled or bent up M.S Rod or Tor steel bending, binding welding and joinging if necessary and tying the grills and placing in position as required for RCC work and providing fan hooks hoisting lowering and including cost, conveyance and taxes of M.S rods or tor steel and binding wire of 18 to 20 gause required for the work for bending, binding and tying the grills (payment will be made on weight of M.S Rod or Tor steel only and no separate payment will be made towards the weight of binding wire) etc. complete as directed by the Engineer-in-charge . Total in Figures 2112750.15 2112750.15 INR Twenty One Lakh Twelve Thousand Seven Hundred & Fifty and Paise Fifteen Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |