| 1 | Clearing snow (with frost) from roads by manual means using picks and shovels, snow depth up to 150mm |
| 2 | Clearing snow (with out frost) from Roads by Manually/ mechanical |
| 3 | Snow depth upto 150 mm |
| 4 | Snow depth over 150 mm but up to 250 mm |
| 5 | Snow depth over 250 mm but up to 350 mm |
| 6 | Snow depth over 350 mm but up to 450 mm |
| 7 | Snow depth over 450 mm but up to 550 mm |
| 8 | Snow depth over 550 mm but up to 650 mm |
| 9 | Snow depth over 650 mm but up to 750 mm |
| 10 | Snow depth over 750 mm but up to 850 mm |
| 11 | Snow depth over 850 mm but up to 950 mm |
| 12 | Snow depth over 950 mm but up to 1050 mm |
| 13 | Slip Clearance |
| 14 | Slip Clearance in ordinary soil with all leads and lifts etc complete job, as per the directions of the Engineer In-charge at site without damaging the public/ Pvt. Property. |
| 15 | Slip clearance in soils mixed with moorum kankar/shingle/Boulders including safe disposal with all leads and lifts complete job as per the directions of the Engineer In-charge at site without damaging the public / Pvt. Property. |
| 16 | Slip Clearance in soils mixed with decomposed soils, by blasting or any other means all leads and lifts complete job as per the directions of the Engineer In-charge at site without damaging the public/ Pvt. Property. |
| 17 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches forfoundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sidesand ramming of bottoms lift upto 1.5 m, including getting out excavated earth anddisposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil. |
| 18 | Hand packed stone filling in wire crates including cost of stone, inlcuding all lead, lift, carriage, handling, re-handling and cost of wire crate complete job. |
| 19 | Back Filling behind abutment , wing wall and return wall complete as per drawing and technical specification clause 1204.3.8 (Granular Material) also including all leads, lifts carriages, handling and re-handling complete. |
| 20 | Providing and laying watering and compacting in layers not exceeding 200 mm thick with 80-100 KN roller, river bed material free of organic material mixed with course aggregate, round Nallah shingle max.Agg. Size 75 mm thick including carriage from source to site of work including of all leads and lifts complete. |
| 21 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete, 1000 mm dia. R.C.C. pipe (laying by manual/mechanical means) |
| 22 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees andsaplings of girth upto 30 cm measured at a height of 1 m above ground level andremoval of rubbish upto a distance of 50 m outside the periphery of the area cleared.(Applicable for Non-DLP roads) Please Enable Macros to View BoQ information |