| 1 | Tunnel Pavement under railway crossing |
| 2 | Providing and laying in position of specified Grade of Reinforced cement concrete including curing but excluding the cost of centring and shuttering. All work upto plinth level1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo mechanically bars Treated Bars of Grade 500 Fe or more .Including Loading,unloading,Twisting,Bending,binding, cost and carriage of all material from approved source to site of work complete Job |
| 4 | Railling for RCC Culvert at RD 0.550Kms |
| 5 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works..Including Loading,unloading,Twisting,Bending,binding, cost and carriage of all material from approved source to site of work complete Job |
| 6 | 1/2” or 12 mm Wedge expansion hold fastner.Including Loading,unloading,cost and carriage of all material from approved source to site of work complete Job |
| 7 | Painting on G.S sheets with synthetic enamel paint of approved band and manufacture of required colour to give an even shade on New work (two or more coats) including a coat of approved steel primer but excluding acoat of mordant solution. Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 8 | Cement Concrete Drain |
| 9 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :(Complete Job Finished work to be measured) |
| 10 | Providing and Laying of (Ist class) bedding on well compacted sand mooum of approved granular material (Boulder) as per clause 1105(II). Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job. (Finished work to be measured). |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-10 1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 12 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-15 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 13 | Providing and laying in position grade of reiforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size)Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). Flooring |
| 14 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured) Approach Slab |
| 15 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo mechanically bars Treated Bars of Grade 500 Fe or more .Including Loading,unloading,Twisting,Bending,binding, cost and carriage of all material from approved source to site of work complete Job |
| 16 | FORM WORK:-Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns, Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 17 | 01 No 500 mm Dia Pipe Crossings |
| 18 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :(Complete Job Finished work to be measured) |
| 19 | Type B (First Class) Bedding Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 20 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-10 1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 21 | Providing and laying non pressure of specified class RCC pipes including collars/spigot jointed with stiff mixture)of cement mortor in the preparation of 1:2 (1Cement:2 fine sand) including testing of joints etccomplete (500 mm Dia).Including cost of form work Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 22 | Back Filling:-Back Filling behind abutmentss, wing walls,return walls etc by way of providing and laying of River bed material (RBM) of approved source as per the directions of Engineer incharge.Including Loading,unloading,Twisting,Bending,binding, cost and carriage of all material from approved source to site of work complete Job Please Enable Macros to View BoQ information |