| 1 | Cement Concrete Drain and Edge Wall |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :(Complete Job Finished work to be measured) |
| 3 | Providing and Laying of (First Class) bedding/stone soling on well compacted Sand,moorum or approved granular material (bulder) as per clause 1105 (II) Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job. (Finished work to be measured). |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-10 1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-15 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 6 | Providing and laying in position Reiforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-15 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo mechanically treated bars.Including Loading,unloading,Twisting,Bending,binding, cost and carriage of all material from approved source to site of work complete Job |
| 8 | FORM WORK:-Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns, Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). Please Enable Macros to View BoQ information |