|
| 1 | Surface excavation averaging 15cm deep and n.exc 30cm deep and getting out in soft/loose soil complete all as specified and directed |
| 2 | Excavation in trenches and not exe. 1.5 m wide and not exe. 1.5 m in depth for foundation of drain, man hole , laying of UG cables etc. not exe. 10 Sq. m on plan and not exe. 1.5 m depth and getting out in hardt/dense soil complete all as specified and directed. |
| 3 | All same as per item No 2 here-in-above but in soft/ loose soil -do- |
| 4 | Excavating in post holes (or similar holes) each not exceeding 0.5 cu. m, getting out in soft/ loose soil and removing surplus soil to a distance exceeding 500 m and making good surface. |
| 5 | Returning filling in trenches including spreading, leveling, watering and well ramming in layers not exceeding 25 cm thick in soft / loose complete all as specified and directed |
| 6 | Removing excavated surplus soil to a distance out side vicinity of MD land and depositing where directed complete all as directed. |
| 7 | M & L for Hard core of broken hard stone or boulders of guage not exceeding 63 mm , deposited spread as subbase to inter locking tiles in layers n.exc 15cm thick , watered & well rammed to true surface complete all as specified and directed. |
| 8 | M&L for anti-termite treatment to the bottom and sides of excavation at the rate of 5 litres of emulsion per square metre of surface area complete all as specified & as directed |
| 9 | M&L for anti-termite treatment to the top surface of filled earth at the rate of 5 litres of emulsion per square metre of surface complete all as specified & as directed |
| 10 | M & L for PCC 1 :4 : 8 type D2 using 40 mm graded crushed stone aggregate as in foundation filling & mass concrete complete all as specified and directed |
| 11 | M & L for PCC 1 :2 : 4 type B2 using 40 mm graded crushed stone aggregate as in foundation filling mass concrete complete all as specified and directed |
| 12 | M&L for cement concrete 1:2:4 type B1, using 20mm graded crushed stone aggregate as in lintels upto 1.5m clear span, cills, steps, seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates and the like including weathering, slightly rounded, chamfered angle and throating as directed including use and waste of form work (straight or curved) all exposed surface of concrete finished fair complete all as specified & as directed Please Enable Macros to View BoQ information |
| 13 | M&L for cement concrete 1:2:4 type B1, using 20mm graded crushed stone aggregate as in lintels upto 1.5m clear span, cills, steps, seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates and the like including weathering, slightly rounded, chamfered angle and throating as directed including use and waste of form work (straight or curved) all exposed surface of concrete finished fair complete all as specified & as directed Please Enable Macros to View BoQ information |