Name of Work:- _1_Construction of C.C. road and drain at Smaranika lane in Ward No. 10.
Sl. No.
Item Description
1
Dismantling of Cement Concrete Grade M-15 & M- 20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres
2
Dismantling and removing R.C.C.columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m leadT&P etc. as required for the work complete as directed by the Engineer-in-charge.
3
Earth work in ordinary soil in excavation of foundation trenches for columns, basement, tie beams, walls and steps in all kinds of soil including moorum, hard stoney earth and earth mixed with boulders except sheet rocks and boulder requiring blasting with all leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with all leads and lifts, T&P for shoring shuttering dewatering if required etc. complete as per the drawing, designing including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge.
4
Cement concrete (1:4:8) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete .
5
RCC work M20 with 20 mm and down graded size black hard grinite ( crusher broken ) stone chips including hoisting,lowering & laying concrete & compacting by using vibrator watering & curing for 4 weeks including cost & conveyance, royalties & taxes, Centring & Shuttering of all materials & labour required for the work etc complete with all T & P in all respect but excluding cost & conveyance of M.S rods & binding wires & tying the grills & placing in proper position. (includeing Centering & shuttering).
6
Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.
7
Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials all complete.
8
Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete.
9
Supplying, fitting & fixing of 12 mm thick Bitumenous expansion joint board (ISI) including cost of material, labour, t&p, transport etc complete as per the direction of EIC.@ 4.00 qnty c\c
10
Removing of excavated dismantlled materials away from work site by mechanical means including loading , unloading and dumping at 5.00 km lead from work site. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.