|
| 1 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetra in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rocks, chiseling/wedging out of rocks (where blasting is prohibited) as per drawings and MORD technical specification 2014 clause 305 (Three zero five) and as per direction of the Engineer-in-Charge. The rate includes, octroi, royality Malkhana , Toll tax , Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 2 | Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 150 mm (One Hundred fifty millimetre)spread thickness (finished work including materials and labour)as per direction of Engineer-In-Charge including carriage of material with in all leads and lifts and other incidentals as directed by the Engineer-In-Charge. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 3 | Providing and laying mechanically mixed and vibrated concrete for plain/reinforced concrete in open foundation complete as per drawing and MORD tecnical specification clauses 802, 803, 1202 & 1203. Nominal Mix 1:4:8 (one cement is to four sand is to eight crushed graded stone aggregate) 40mm (forty millimeter) as per direction of Engineer-in-Charge including carriage of materials with with in all leads and lifts and other incidental. The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 4 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level. 1:1.5 :3(One cement is to one point five coarse sand is to three crushed graded stone aggregate 20 mm (twenty milimetre) nominal size.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. |
| 5 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level : (C.C. 1:3:6)(One cement is to three Coarse sand is to six crushed graded stone aggregate) 20 mm (twenty millimeter) nominal size.The rate includes, octroi, Malkhana , Toll tax , Goods and Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. Please Enable Macros to View BoQ information |