| 1 | A) Erection Part |
| 2 | ERECTION PART 11kV HT Line TS NO-83/2026-27 WBS 32100261-001-Una-HT-136 |
| 3 | Erection of S.T Single Pole Str. 9 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , Alluminium Paint and ramming & painting of poles complete in all respect. |
| 4 | Erection of S.T 2 Pole Str. 9 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , Alluminium Paint and ramming & painting of poles complete in all respect. |
| 5 | Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect. |
| 6 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. |
| 7 | Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 8 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 9 | Dismantling of existing ACSR/AAAC conductor from 11 kV / LT overhead line, including disconnection from insulators, cutting, lowering to ground level with proper safety precautions, removal of binding wire, and stacking of conductor at a safe location. The work includes use of required tools & tackles, labour, and all incidental charges complete in all respects as per site conditions and directions of Engineer-in-Charge. (REMOVAL of CONDUCTOR & GI Wire FROM INSULATOR,DE -STRINGING and ROLLING of CONDUCTOR and GI Wire |
| 10 | Dismantling of PCC pole including uprooting, lowering, and stacking complete. |
| 11 | Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site |
| 12 | SUPPLY PART. 11kV HT Line TS NO-83/2026-27 WBS 32100261-001-Una-HT-136 |
| 13 | Prov. Steel Tublar 9 mtr long with cap. (Provided By HPSEBL) |
| 14 | Prov. RCC Muff |
| 15 | Prov.AAAC 7/4.26 mm Conductor (Provided By HPSEBL) |
| 16 | Prov.G.I.Wire No. 8 SWG in mtr. (Provided By HPSEBL) |
| 17 | Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm |
| 18 | Prov. Angle Iron (50x50x6mm) Leggth 750 mmx2 |
| 19 | Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm |
| 20 | Prov.X-Bracing Set.MS Angle Iron (50x50x6 mm) Length 2125 mm x2 Nos. |
| 21 | Prov.X-Arm (Horizontal) MS-Channel Iron (100x50x6mm) Length 2340 mm x2 Nos. ( ∆) Formation. |
| 22 | Prov. MS Channel Iron (75x40x6 mm) Length 2800 mm |
| 23 | MS Channel Iron (75x40x6 mm) Length 2800 mm for holding the 11kv G.O.Switch handle |
| 24 | G.O. Switch Handle Supporting (Channle Iron 75x40x6 mm) Length 460mm |
| 25 | Prov.GO AB Switch Unit (11kV, 400A, 25 KA ) |
| 26 | Prov.D.O Fuse Unit |
| 27 | Prov.Nuts and Bolts of Various Sizes |
| 28 | Prov.MS Half Clamp (Provided By HPSEBL) |
| 29 | Prov.MS Full Clamp |
| 30 | Prov.Barbed Wire |
| 31 | Prov.Eye/Earth Hook |
| 32 | Prov.11kv Pin Insulator with pin complete in all respect |
| 33 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 34 | Prov.11kv Stay Set |
| 35 | Prov. Stay Wire (7/3.15 mm) (10 kg. per Stay Set) |
| 36 | Prov.11kv Earthing set complete in all respect. |
| 37 | Prov.Red Oxide (1.5 Ltr. Per Pole) |
| 38 | Prov.Alluminum Paint |
| 39 | Prov.11kv Danger Plate (250x200x1.6 mm) Please Enable Macros to View BoQ information |