| 1 | Sewer Line Work In Remaining Area Of Housing Board Sector 3 Near Roadways Bus Dipot Sikar |
| 2 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 mIC to manholemanhole |
| 3 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.Add extra for overall depth of excavation above 1.5 m and upto 3.0 m over item no 17.1.1.1 |
| 4 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.Bituminous courses |
| 5 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.Granular courses |
| 6 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Stone, boulders, gravelly material(Taken Lead UP to 5kms) |
| 7 | Providing Barricading for Trenches using 80 - 100 mm dia Wooden Ballies as vertical post, atleast 1.5m above ground level and atleast 30-45 cm below ground level at a spacing of 3 m. Two rows of PVC Tape (preferably red in colour) strip barricading horizontal strip securely tied by the vertical members. Vertical members shall be painted in red and white colour. Rate is inclusive removal and cleaning of site complete in all respect. |
| 8 | Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.110 mm Nominal Dia |
| 9 | Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths full round HDPE DWC (double wall corrugated) pipes of SN8 grade as per IS 16098 (Part 2) amended upto date in trenches in complete including all material, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications, drawings and as per direction of Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.200 mm ID |
| 10 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer.200 mm internal diameter |
| 11 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for PVC/HDPE pipes of following sizes as per drawing and or as directed by Engineer.160mm nominal dia |
| 12 | Providing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 0.56m and depth upto 0.90 m, including concreting PCC M-10 grade (1:3:6) for 225mm thick foundation including curing compaction and foRM work etc complete, PCC M15 for benching and channel portion, PCC M15 for fixing the manhole frame and cover using stone aggregate 20mm Nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and roof. Supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note-Only Excavation work will be measured and paid separately |
| 13 | Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.0m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.0m, vertical height 0.805m, wall thickness 125mm), and circular rings of required heights (ID 1.0m, height 150/225/300/600 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 1.625m dia and 150mm thickness, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS foot steps / SFRC foot steps, including cost of shuttering, steel reinforcement, testing for water tightness etc. complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately.Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 0.805), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + 50mm) |
| 14 | Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.0m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.0m, vertical height 0.805m, wall thickness 125mm), and circular rings of required heights (ID 1.0m, height 150/225/300/600 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 1.625m dia and 150mm thickness, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS foot steps / SFRC foot steps, including cost of shuttering, steel reinforcement, testing for water tightness etc. complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately.Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.0m, wall thickness 125mm, height 150/225/300/600 mm for constructing extra depth of manhole beyond depth mentioned in item no-17.59.1 as per drawing. |
| 15 | Constructing providing and fixing of pre-cast RCC M-40 grade circular Road Side Inspection Chamber including earthwork with following dia and depth cylindrical piece with 100mm wall thickness, inbuilt 100mm thick base slab, inbuilt cover & frame on top, provision for 110mm OD in and out sewer connection with making proper inbuilt benching and channel with PCC M-15 grade including providing cast-in-situ 100mm thick base foundation of PCC M-10 grade, supplying and fixing circular precast SFRC Circular 300 / 450 mm dia manhole cover with frame MD-10 (as per IS-12592 amended upto date), including steel reinforcement minimum @ 80kg/cum, testing for water tightness complete in all respect as per drawing, specification and the direction of the Engineer.Pre-cast Road side inspection chamber of 300mm dia (internal), 450mm depth and 600mm dia base foundation |
| 16 | Construction of House Sewer Connection inside and outside of a dwelling properties to connect all the outlets of Kitchen, Bath, toilet/WC of the property to existing inspection chamber of Sewer Network, which includes Door-to-door survey of all properties to be connected with Sewer Network, Preparation of sketch / drawing of arrangement for each house with all the details and obtain approval from Engineer In-charge or his representative and Preparation of as built drawing (Layout plan) in AutoCAD for each property / dwelling connection with sewer network up to manhole. Including Dismantling of all type of flooring and roads, i.e. BT/CC/WMM/interlocking block etc with mechanical cutter. Including Required Excavation of pipe trench/chamber in all type of strata of specified width up to all depth, Providing, laying, jointing and aligning of PVC-U pipes (SN-8) as per 15328 (amended up to date) / HDPE DWC (double wall corrugated) pipes of SN-8 grade as per IS 16098 (amended up to date)/ SWR Pipes with required PVC/ DWC/SWR fittings with required level & location in buried position over bedding of 50 mm thick M-10 grade and in open position above ground/floor with an encasing of pipe 50 mm cover at 3 sides with M10 grade concrete, Providing, laying, jointing and aligning 160 mm dia PVC-U pipes (SN-8) as per IS15328 (Amended up to date) providing as sleeve to 110 mm dia PVC-U pipes / HDPE DWC (double wall corrugated) pipes (exposed to atmosphere) for crossing open drains, demolishing, If required and reconstruction of drain in original position with PCC M-10, Brick work with modular extruded burnt fly ash clay sewer bricks (Conforming to IS: 4885 - 1988) in CM 1:4, 12 mm thick plaster in CM 1:3 and Construction of 2 Nos brick masonry chamber of bricks class designation 75 of 115 mm wall thickness in cement mortar 1:4, clear inside dimension 320 x 320 x 550 mm, 50 mm thick base PCC 1:3:6, providing & fixing 350 x 350 mm RCC precast cover with frame of LD-2.5, earth filling in gaps, finishing with PCC 1:3:6 inside the chamber, Chamber-1 with square mouth S.W. gulley trap P-type of size 100 x 100 mm as per IS 651: 1992 (amended up to date) with CI grating, in slope around the mouth of Gulley Trap including provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. to connect a single inlet after connecting all the outlets of kitchen & bath & outlet of this chamber will connect to Chamber-2 or inspection chamber and the Chamber-2 with a provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. i.e. a single inlet after connecting all outlets of toilet & WC of premises to exiting Inspection chamber, Emptying of septic tank/soakage well etc. disposing of sludge within a lead of 5 Km and taking out the sewage, Bypass of septic tank/soakage well by providing, laying, jointing of 110 mm dia PVC-U pipes for all length from inlet to outlet, including PVC coupler, MS clamp and dismantling, repairing, making good the holes etc, Making connection with 110 mm dia PVC-U pipe with exiting inspection chamber (including making holes in Inspection Chamber) for pipes coming out from inside property and Chamber 1/2, making and repairing holes with CM in 1:4, repairing of floor and road with CC M-30 grade same as original thickness of floor and road, watering, backfilling, compaction and disposal of all surplus material and sewage etc. to a suitable location with all lead and lift, repairing of underground utilities, if damaged, Complete job to connect a dwelling premises to sewer network including all material, labour, taxes, charges etc. as per Specifications, drawing and directions of Engineer In-chargeLength up to 5 m |
| 17 | Providing, laying and spreading of granular sub-base by providing coarse graded Material (Table 400-2), spreading in uniform layers with motor grader on prepared surface, mixing BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material |
| 18 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing,rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion complete.Crusher broken - Grade-II (63-45mm) |
| 19 | Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing,rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion complete.Crusher broken - Grade-III (53-22.4mm) |
| 20 | Providing and applying primer coat over prepared surface of granular base with bitumen emulsion as per IS : 8887 and approved quality @ 0.6 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 21 | Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 22 | Providing and laying bituminous macadam in 50/75 mm compacted thickness on prepared surface with specified graded crushed stone aggregates as per Table 500-4, Grading-II for base/ binding course, loading of aggregate with F.E. loader, heating and mixing of stone aggregate and bitumen in computerised hot mix plant, transported to site by tippers to paver, laid over a previously prepared surface with paver finisher fitted with electronic sensing device to the required grade, level and alignment and rolling with power roller and vibratory compactor as per clauses 501.6 and 501.7 to achieve the desired compaction complete as per clause 504 of MoRT&H specification and including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding cost of primer/ tack coat.With Bitumen VG-grade 30 @ 3.3% (percentage by weight of total mix) |
| 23 | Providing and laying open graded premix carpet 20mm thick (compacted), on prepared surface in a single course as wearing course, composed of specified graded crushed stone aggregate as per Table 500-23, premixed with bituminous binder @ 14.60 kg/ 10sqm (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required), including loading of material with F.E. loader, hot mixing of stone aggregate and bitumen in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensor control to the required level and grade, compacting smooth wheeled roller 8-10 tonne capacity and finishing to required level to achieve the desired density as per clause 511 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion but excluding cost of tack coat/ seal coat.With Bitumen VG-grade 30 |
| 24 | Providing and applying premixed seal coat Type \\"B\\" comprising of thin application of fine aggregate 0.06 cum/ 10 sqm premix with bitumen binder @ 6.8 Kg/ 10 Sqm (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required) laying with paver finisher with electronic sensor control and rolling with power roller 8-10 tonne complete as per clause 513 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion.With Bitumen VG-grade 30 Please Enable Macros to View BoQ information |