| 1 | Slip Clearance in Soils ,mixed with moorum/kankar/ shingle/ boulders disposal lead upto 50 mtrs and lift 1.50 mtrs |
| 2 | Silt clearance from canals, sumps ,Intake channels, inclusive of initial lead and lift ( 50 mtrts and 1.50 mtrs ) respectively. |
| 3 | Slip clearance in ordinary soil disposal lead upto 50 mtrs and lift 1.50 mtrs |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: |
| 5 | All kinds of soil |
| 6 | Ordinary Rock |
| 7 | Weed clearance from canals/khuls including extraction of roots |
| 8 | Contruction of Muttu Bunds/ Diversion Bunds comprising boulders and wooden bushes in alternate layers , including working in water conditions (including all sorts of carriages ) |
| 9 | providing and Fixing and placing of EC bags at requsite site complete job (including all sorts of carriages) |
| 10 | Providing and laying of poltythene sheets of standard quality at requsite sits ( including all sorts of carriages) |
| 11 | Providing and fixing of PVC pipes of approved band and quality (including all sorts of carriages ) |
| 12 | 200mm dia pipe |
| 13 | 150mm dia pipe |
| 14 | 100mm dia pipe |
| 15 | Providing and fixing of RCC pipes of standard quality (including all sorts of carriages complete job) |
| 16 | 600mm dia pipe |
| 17 | 450mm dia pipe |
| 18 | 300mm dia pipe |
| 19 | Providing and fixing of GI sheets at damaged spots at requsite sites (including all sorts of carriages complete job) |
| 20 | Providing and fixing of poplar wood (including all sorts of carriages complete job) |
| 21 | Engagement of Hydraulic Excavator ( including all sorts of carriages ) |
| 22 | Chain Mounted Machine |
| 23 | Engagement of Labours for Clearance of canals/khuls and bush cuttings during the irrigation season |
| 24 | Skilled labour |
| 25 | Unskilled labour |
| 26 | Transportation of departmental pipes from Divisional Store including loading ,unloading etc upto site of work(Complete Job) |
| 27 | Hiring of vehicle for visiting of various sites to and fro during the irrigation season day and night including fuel and driver charges complete job |
| 28 | Providing of various tools for smooth functioning of Irrigation season ( including cost of tools,carriages etc) |
| 29 | Pick Axel |
| 30 | Shoval |
| 31 | Spade |
| 32 | Hand Saw ( Small size) |
| 33 | Axe ( Small Size) |
| 34 | Removal of Unhyghenic materaial from designated sites and its disposalas per directions ,all inclusive |
| 35 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 36 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 37 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 38 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 39 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, (TMT bars of grade Fe-500D or more.) |
| 40 | Hand packing of stones in wire crates , excluding cost of crates and stones |
| 41 | Dumping ot stones excluding cost of stones in Horizontal in level |
| 42 | Supply of stones excluding carriages and head load |
| 43 | Cost of crates excluding cost of stones |
| 44 | Centering and shuttering including attached pilisters etc and removal of farm work , all walls upto plinth level |
| 45 | Providing and laying of dry stone soling |
| 46 | 12 mm thick cement concrete plaster 1:4 mix |
| 47 | Random Rubble masonary with hard stones in foundation and plinth including levelling up with cement concrete 1:6:12 upto plinth level with cement mortar 1:6 Mix |
| 48 | Quarry stones |
| 49 | Nallah Stones |
| 50 | Dry RR masonary with hard stones in foundation and plinth |
| 51 | Quarry stones |
| 52 | Nallah Stones |
| 53 | Pointing on stone work with cement mortor 1:3 mix flush/ruled pointing |
| 54 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete (welded) |
| 55 | Providing Geo Tagged Photographs including printing etc complete |
| 56 | Carriage of materials by Mechanical Transport |
| 57 | Crates Upto 1 km |
| 58 | Beyond 5 to 10 km/KM |
| 59 | Beyond 10 to 20km/KM |
| 60 | Beyond 20KM to Every Additional KM |
| 61 | Stones upto 1km |
| 62 | Beyond 5 to 10 km/KM |
| 63 | Beyond 10 to 20km/KM |
| 64 | Beyond 20KM to Every Additional KM |
| 65 | 40mm Aggrigate 1KM |
| 66 | Beyond 5 to 10 km/KM |
| 67 | Beyond 10 to 20km/KM |
| 68 | Beyond 20KM to Every Additional KM |
| 69 | 20mm Aggrigate / Sand 1KM |
| 70 | Beyond 5 to 10 km/KM |
| 71 | Beyond 10 to 20km/KM |
| 72 | Beyond 20KM to Every Additional KM |
| 73 | Cement/Steel 1km |
| 74 | Beyond 5 to 10 km/KM |
| 75 | Beyond 10 to 20km/KM |
| 76 | Beyond 20KM to Every Additional KM |
| 77 | RCC Pipes 300 MM Dia 1KM |
| 78 | Beyond 5 to 10 km/KM |
| 79 | Beyond 10 to 20km/KM |
| 80 | Beyond 20KM to Every Additional KM |
| 81 | RCC Pipes 450 MM Dia 1KM |
| 82 | Beyond 5 to 10 km/KM |
| 83 | Beyond 10 to 20km/KM |
| 84 | Beyond 20KM to Every Additional KM |
| 85 | RCC Pipes 600 MM Dia 1KM |
| 86 | Beyond 5 to 10 km/KM |
| 87 | Beyond 10 to 20km/KM |
| 88 | Beyond 20KM to Every Additional KM |
| 89 | Carriage of materials by Manual Means |
| 90 | Crates for 1st 50 mtrs |
| 91 | For Every additional 50 mtrs |
| 92 | Stones for 1st 50 Mtrs |
| 93 | For Every additional 50 mtrs |
| 94 | 40mm Aggrigate for 1st 50 mtrs |
| 95 | For Every additional 50 mtrs |
| 96 | 20mm Aggrigate/Sand for 1st 50 mtrs |
| 97 | For Every additional 50 mtrs |
| 98 | Cement/Steel for 1st 50 Mtrs |
| 99 | For Every additional 50 mtrs |
| 100 | RCC 300 MM Dia pipes 1st 50 Mtrs |
| 101 | For Every additional 50 mtrs |
| 102 | RCC 450 MM Dia pipes 1st 50 Mtrs |
| 103 | For Every additional 50 mtrs |
| 104 | RCC 600 MM Dia pipes 1st 50 Mtrs |
| 105 | For Every additional 50 mtrs Please Enable Macros to View BoQ information |