| 1 | Clearing Jungle including uprooting rank, vegetation, grass, brush wood, trees and sapling of girth upto to 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m. outside the periphery of the area cleared. |
| 2 | Weed Clearance from Canal including extraction of roots |
| 3 | Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively) (A) Dry |
| 4 | Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively) (B) Wet |
| 5 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: |
| 6 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil. |
| 7 | Earth work in bulk excavation by mechanical means (hydraulics excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil. |
| 8 | Earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc, (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottom lift up to 1.50m including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil. (1 meter from cutting edge) |
| 9 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in All kinds of soil. |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 11 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 12 | Removal of dead animals and disposal at safe place far from locality as per direction of Engineer in charge. |
| 13 | Deployment of Hydraulic excavator including POL charges for all sorts of works, not measurable. |
| 14 | Hand picking stones in wire crates excluding cost of stones and wire crates |
| 15 | Opening out wild crates those and re-binding after filling. |
| 16 | Supply of labour for all sort of works as per requirement for canal siphons, canal section and drainage structure and survey work. |
| 17 | Carriage/Disposal of mulba/earth from the periphery of silt cleared to dumping area lead upto 2.0 kms |
| 18 | Filling E.C Bags with sand/earth, including cost of sewing and strings, excluding cost of bags and earth/sand |
| 19 | Unloading sand/earth filled bags from Boats Placing in dry. |
| 20 | Unloading sand/earth filled bags from Boats Placing in wet. |
| 21 | Slip clearance in ordinary soils disposal lead upto 50M and lift upto 1.50 M respectively. |
| 22 | Supply of stones. |
| 23 | Dumping stone excluding cost of stones in horizontal on level. |
| 24 | Constructing Muthu Bunds, comprising boulders and wood bushes in alternate layes , including working in water situations. |
| 25 | Carriage of Sand and stone aggregates from Source to site of work average lead 10 Kms by Mechincal Transport. |
| 26 | Carriage of Nallah Stone from Source to site of work average lead 10 Kms by Mechincal Transport. |
| 27 | Pumping out water caused by springs, Tidals or River seepage, broken water mains or Drains and the like. |
| 28 | Painting and writing of Gauges on Main Ravi Canal, Ujh Barrage and its distributaries. |
| 29 | Centering and shuttering incl. strutting, propping etc and removal of form work for: Foundations, footings bases of columns etc for mass concrete. |
| 30 | Cost of EC. Bags. |
| 31 | Add cost of wire crates Please Enable Macros to View BoQ information |