| 1 | Clearing Jungle including uprooting rank, vegetation, grass, brush wood, trees and sapling of girth upto to 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m. outside the periphery of the area cleared. |
| 2 | Weed Clearance from Canal including extraction of roots |
| 3 | Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively) (A) Dry |
| 4 | Silt clearance from canals. Inclusive of initial lead and lift (50m & 1.5m respectively) (B) Wet |
| 5 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: |
| 6 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil. |
| 7 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in All kinds of soil. |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 10 | Removal of dead animals and disposal at safe place far from locality as per direction of Engineer in charge. |
| 11 | Deployment of Hydraulic excavator including POL charges for all sorts of works, not measurable. |
| 12 | Supply of labour for all sort of works as per requirement for canal siphons, canal section and drainage structure and survey work. |
| 13 | Carriage/Disposal of mulba/earth from the periphery of silt cleared to dumping area lead upto 2.0 kms |
| 14 | Filling E.C Bags with sand/earth, including cost of sewing and strings, excluding cost of bags and earth/sand |
| 15 | Unloading sand/earth filled bags from Boats Placing in dry. |
| 16 | Unloading sand/earth filled bags from Boats Placing in wet. |
| 17 | Slip clearance in ordinary soils disposal lead upto 50M and lift upto 1.50 M respectively. |
| 18 | Supply of stones. |
| 19 | Dumping stone excluding cost of stones in horizontal on level. |
| 20 | Constructing Muthu Bunds, comprising boulders and wood bushes in alternate layes , including working in water situations. |
| 21 | Carriage of Sand and stone aggregates from Source to site of work average lead 10 Kms by Mechincal Transport. |
| 22 | Carriage of Nallah Stone from Source to site of work average lead 10 Kms by Mechincal Transport. |
| 23 | Pumping out water caused by springs, Tidals or River seepage, broken water mains or Drains and the like. |
| 24 | Painting and writing of Gauges on Main Ravi Canal, Ujh Barrage and its distributaries. |
| 25 | Centering and shuttering incl. strutting, propping etc and removal of form work for: Foundations, footings bases of columns etc for mass concrete. |
| 26 | Cost of EC. Bags. |
| 27 | Supply of course sand (erath for filling E.C. bags) |
| 28 | Supply of zinc coated Gabions mechanically woven double twisted hexagonal in shape having wire mesh size of 100x120mm & having mesh wire dia 2.7mm selvedfe wire dia: 3.4mm & lacing wire dia 2.2mm & PVC coating thickness |
| 29 | Hand picking stones in a wire crates excluding cost of stones and wire crates |
| 30 | Tipping stone-filled wire crates in position, including equipments charges |
| 31 | Engaging carpenbter (Average) for removing doors, adjusting sizes and re-fixing then including repair of windoe and doors |
| 32 | Engaging sewer men for aleaning septic tanks, Manholes and choked sewer, pipes in RTIC Colony, Kathua |
| 33 | Engaging Fitter 2nd class for plumbing work in RTIC Colony and Office Complex Please Enable Macros to View BoQ information |