|
| 1 | Dismantling of dammar road with all labour T&P complete. |
| 2 | Excavation of earth mixed soil c sand with all labour T&P complete. |
| 3 | Bailling out or pumping out/liquid mud during trench excavation with all labour T&P complete. |
| 4 | Providing and laying granular, bedding with carefully compacted graded hard crusher broken stone of 100% passing through 20mm sieve, 20- 50% passing through 10mm sieve and 100% retained on 6mm sieve with all labour T&P complete. |
| 5 | Supply of 250 mm dia NP-3 sewer pipe with all labour T&P complete. |
| 6 | Laying, jointing and testing of 250 mm dia NP-3 sewer pipe line with all labour T&P complete. |
| 7 | Provision for inter connection in between proposed sewer line and existing disposal point with all labour T&P complete. |
| 8 | PCC work 1:4:8 cement sand & 40mm thick brick ballast with all labour T&P complete. |
| 9 | 1st class brick 1:4 cement sand with all labour T&P complete. |
| 10 | 12mm thick plaster 1:3 cement sand with all labour material T&P complete. |
| 11 | CC for frame fixing 1:2:4 cement sand & 20mm thick stone ballast with all labour T&P complete. |
| 12 | Supply of polycrite cover with m.s. frame. |
| 13 | Cartage charges for cover & frame from store to site. |
| 14 | Lighting of during night work. |
| 15 | Provision for site clearance after constuction work with all labour T&P complete. |
| 16 | Repairing of damaged water connection during work with all labour T&P complete. |
| 17 | Repairing of damaged sewer connection during work with all labour T&P complete. |
| 18 | Repairing of unforseen items i.e. power cable, water line, telephone cable, damaged during laying of sewer line with all labour, material T&P complete. |
| 19 | Supply of sand and filling into trenche with all labour, material T&P complete. |
| 20 | Supply of G.S.B. and filling into trenche with all labour, material T&P complete. |
| 21 | Providing and erecting temporary barricading at site as par drawing/direction of engineer-in-charge. |
| 22 | Reinstatement of dismantled dammar road with all labour T&P complete. |
| 23 | Disposal of excavated earth where sufficient width of road is not available for stacking of excavated earth average lead 250m. |
| 24 | Traffic diversion during work for proper completion of work. Please Enable Macros to View BoQ information |