| 1 | Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site. All the material at Sl. No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor. (Decentralized Items Provided by the Contractor as per Estimate). |
| 2 | Carriage of PCC Pole 8.5 Mtr. Long |
| 3 | Carriage of 11 KV XLPE Cable 3x70mm2 |
| 4 | Carriage of 11 KV XLPE Cable 3x185mm2 |
| 5 | Carriage of AB Cable 3x95+1x70+1x25mm2 |
| 6 | Carriage of AB Cable 3x50+1x35+1x25mm2 |
| 7 | Carriage of ACSR weasel conductor |
| 8 | 11 KV Cable Jointing Kit |
| 9 | 11 KV Fuse Set |
| 10 | Safe Carriage of 100 KVA T/F |
| 11 | Armound Cable with catenary arrangement 2x6mmsq |
| 12 | Carriage of other line material |
| 13 | Erection of Single PCC Pole (8.5 Mtr Long) for 11 KV HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 14 | Erection of Doubel PCC Pole (8.5 Mtr Long) for 11 KV HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site. |
| 15 | Cartage, Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost. |
| 16 | Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost. |
| 17 | Earthing Complete as per RESSPO Norms. |
| 18 | Pipe Earthing for T/F as per RESSPO Norms. |
| 19 | Laying and Commissioning of 11 KV XLPE size 3x70 mm2 cable (D/C) as per respo norms. |
| 20 | Laying and Commissioning of 11 KV XLPE size 3x185 mm2 cable (D/C) as per respo norms. |
| 21 | Errection & Commissioning of AB cable 3x95+1x70+1x25mm2 including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 22 | Errection & Commissioning of AB cable 3x50+1x35+1x25mm2 including fitting of Accessories (All Accessories shall be Provided by the Contractor). |
| 23 | Laying of Armound Cable with catenary arrangement 2x6mmsq as per respo norms |
| 24 | Fixing of 11 KV Cable Jointing Kit |
| 25 | Fixing of 11 KV Fuse Set |
| 26 | Dismounting of 10 KVA, 16 KVA T/F |
| 27 | Mounting & Jumpering of 10 KVA, 16 KVA T/F |
| 28 | Mounting & Jumpering of 100 KVA T/F with complete fitting. |
| 29 | Disconnection and Reconnection of Service Cable of Existing Consumers |
| 30 | Dismentaling of Old HT & LT Line |
| 31 | Carriage Charges site to store |
| 32 | Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required). |
| 33 | Cartage & Fitting of Three Phase Distribution Box |
| 34 | (Decentralized Items Providing & Erection/Fixing by the Contractor as per Estimate). |
| 35 | Clamp for Top. Tee Drp, Guard etc. |
| 36 | LT Clamp with I hook |
| 37 | Suspension Clamp |
| 38 | Dead and Clamp |
| 39 | Clamp for D/B |
| 40 | GI Pipe 6\\" Dia |
| 41 | Clamp for GI Pipe |
| 42 | Danger Board, No. Plate Bolth with |
| 43 | Concreting of Stay |
| 44 | Nut & Bolts Different Size Please Enable Macros to View BoQ information |