| 1 | Earth work in Filling in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 8km. form the foundation trenches including royalty@ 9.00 per cum. (Chapter No.4 PWD.SCH.-253(a)+ CPTR No. 3 1 to 8 Km.) |
| 2 | Providing and laying cement concrete in 1:5:10 (1 cement :5 fine sand 10 graded stone aggregate 40mm nominal size) and curing complete, including cost of form work in foundation and floors. (5-Chapter PWD.Si.-01) |
| 3 | Class-150 brick work in 1:4 cement and coarse sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapte No. 06 S.I. No. 2) |
| 4 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.(c) 1 cement : 4 Coarse sand.(Chapter No. 13 S.I. No.-582(ii))PWD Shedule |
| 5 | Providing and laying in postion machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement conrete work, using cement content as per approved design mix, including pumping of concrete to site of laying including the cost of centering, shuttering, finishing and but excluding reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retarder for setting of concrete/improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note:- Cement content considered in this item is @ 330kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.(i) upto plinth level |
| 6 | Raising & Re-Fixing of the Manhole including cleaning and brick work etc. All complete. (Non Scheduled) |
| 7 | Supply & fixing R.C.C Menhole cover heavy duty size etc. All complete. (Non Scheduled) |
| 8 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.cc Slab supply of reinforcement and its bending butinculding its fixing and binding the same with 24 bwgi binding wire and including necessary oentering and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150. (5-Chapter S.I. No.-284) PWD Sheduled |
| 9 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor.(Chapter No. 10 S.I. No. 504(B)) |
| 10 | Supply & Fixing R.C.C. Precast (Size 900x450x150mm) as per market rate. Etc. all complete. |
| 11 | Fixing of R.C.C. precast etc. all complete. |
| 12 | Supply & Fixing Granite Board 2.5\\"x4\\" Size Display Board including Painting, Lettering etc. all complete. (None Schedule) |
| 13 | Sub Total (A) |
| 14 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 15 | Grand Total Please Enable Macros to View BoQ information |