| 1 | Supply of the Following Material For in Installation of Deep well India Mark II Handpump & Related Items of work |
| 2 | 110 mm dia PVC Pipe ( 6Kg/Cm2) |
| 3 | 63 mm dia PVC Pipe ( 6Kg/Cm2) |
| 4 | 63 mm dia PVC Ribbed Strainer ( 6Kg/Cm2) |
| 5 | 110x63 mm dia Reducer (FRP) |
| 6 | 32 mm dia G.I. Pipe of Medium Cls |
| 7 | Transportation of Handpump Materails, T&P, & Camp equipage etc. to the site of work including & loading & unloading & Proper Stacking at side. |
| 8 | Hiring Charges for Necessary T& P & equipage required for Installlation of Handpump , Tripod, bogey, cutter, wire rope, clamps, wooden plants loading arrangement T&P etc Complete. |
| 9 | Sinking of 150 mm Dia Bore hole by casing pipe method in all type of Soil Strata handling & Dismantling after completion of work also including all labourmbGl |
| 10 | Lowering of PVC assembly comprising of pvc ribbed strainer 63 mm outer dia PVC pipe, 110x63 mm dia FRP reducer & 110 mm dia outer PVC pipe as per department Desing & Drawing Complete |
| 11 | Shrounding and Packing Pea-Graval/ Coarse send between borewell and PVC assembling before T&P etc requied for proper completion of the work |
| 12 | Extraction of Casing Pipe 150 m dia after Completion of lowring PVC pipe assembly including all labour T&P etc complete |
| 13 | Sealing of Strata by Bentonite |
| 14 | Dismantal of old assembly & re-Installing of India Mark-II Handpump assembly into the PVC assembly as per instructions of Eng Incharge etc Complete |
| 15 | Development of bore by pumping with pump are by manual back washing till the discharge is free from turbidity including hire charges of pumping equipment labour T&P etc |
| 16 | Diseinfection of Hand pump using Powder chlorine compound including through cleaing of all exterior part of handpump coming in contact with water also including supply of Bleaching Powder, Proper complition of the work |
| 17 | Construction of 1.85 mtr dia circular Cement Concreate Platform in 1:2:4 proper compltion of the work. |
| 18 | Construction of cement concrete drain for plateform as per departmental type design &requirement as per site condition of the work. |
| 19 | Construction of cement concrete drain for plateform as per departmental type design &requirement as per site condition of the work. |
| 20 | 10 nag Please Enable Macros to View BoQ information |