| 2 | TOTAL PRICE FOR ENTIRE SCOPE OF WORK AS PER TENDER NO.: BHEL/CPC/DRL/C_MPH_T-Yard/27/005FOR Civil, Structural & Architectural works including Leveling & Grading of Main Plant#2:-Power House, CCR, TG, BFP, CEP, Service Building with Parking, T-Yard, Compressor, DG, AC & Ventilation Ducting, TG Hall EOT Crane Erection, Structural Works of Power Block Area #2 (Powerhouse, Pipe Racks and other misc. structures), FOPH, Labour Sheds for workers including land leasing, Paving & Sewerage Waterline Works of Entire Power Block Area, Rooftop Solar System Foundation, Sewage Water Line (Within Main Power Block#2 area), Pipe Racks/Cable Racks, AC & Ventilation Ducting, Fire Protection System (FPS), Safety Control Room (Civil, structural, electrical, Fire Fighting, HVAC etc.),Safety Park, PCRI Chem. Lab(RCC), Occupational Health Centre (RCC), ACC(Levelling and grading, Civil foundation works of Air cooled condenser (ACC) up to FGL, ACC duct foundation, ACC equipment foundations, ACC Elevator & Staircase foundation & Civil works(Foundation & Superstructure) etc. (Excl Cement, Reinforcement Steel & Structural Steel unless noted otherwise) at 1X800 MW Darlipali Super Thermal Power Project, Stage-II Please Enable Macros to View BoQ information |