| 1 | M&L for point wiring with 1.5 sqmm size (nominal area) PVC insulated unsheathed single core multi stranded FRLSH copper conductor cable drawn into and incl concealed (on wall only) PVC conduit (medium grade) with fittings of adequate dia and length with all accessories and fittings like bends, elbow, crosses, etc. with modular terminal boxes with cover plate and frame for mounting fittings like; switches, sockets, fan regulator, etc. incl 1.5 sqmm size PVC insulated multistranded FRLSH copper conductor cable as earth continuity conductor and connected to earth dolly for one light/ fan/ exhaust fan/ bell point controlled by one 1-way switch/ bell push including taking down the existing old unserviceable wiring connection with casing-capping/ conduit/ batten and switch board of any description with and including making good the disturbed surfaces (as/if requred), complete all as per specified and as directed by Engineer-in-Charge. |
| 2 | All as per Item No. 01 here-in-above, but for One 3 pin socket outlet, 5 Amps on the same board, complete all as specified and as directed by Engineer-in-charge. |
| 3 | All as per Item No. 01 here-in-above, but for One 3 pin socket outlet, 5 Amps, independent board, complete all as specified and as directed by Engineer-in-charge. |
| 4 | All as per Item No. 01 here-in-above, but for One 3/5 pin socket outlet, 15 Amps, independent board, with cables 4 sq. mm size, complete all as specified and as directed by Engineer-in-charge. |
| 5 | M&L for point wiring with 1.5 sqmm size (nominal area) PVC insulated unsheathed single core multi stranded FRLSH copper conductor cable drawn into and incl PVC casing capping sleeves and caps of adequate width and length with all accessories and fittings like bends, elbow, crosses, etc. with PVC round block and PVC terminal boxes with 3.00mm thick laminated sheet cover for mounting fittings like; switches, sockets, fan regulator, etc. incl 1.5 sqmm size PVC insulated multistranded FRLSH copper conductor cable as earth continuity conductor and connected to earth dolly for one light/ fan/ exhaust fan/ bell point controlled by one 1-way switch/ bell push including taking down the existing old unserviceable wiring connection with casing-capping/ conduit/ batten and switch board of any description with and including making good the disturbed surfaces (as/if requred), complete all as per specified and as directed by Engineer-in-Charge. |
| 6 | All as per Item No. 05 here-in-above, but for One 3 pin socket outlet, 5 Amps on the same board, complete all as specified and as directed by Engineer-in-charge. |
| 7 | All as per Item No. 05 here-in-above, but for One 3 pin socket outlet, 5 Amps, independent board, complete all as specified and as directed by Engineer-in-charge. |
| 8 | All as per Item No. 05 here-in-above, but for One 3/5 pin socket outlet, 15 Amps, independent board, with cables 4 sq. mm size, complete all as specified and as directed by Engineer-in-charge. |
| 9 | S&F of Modular Switch, One Module, 1-Way, 6 Amps, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 10 | S&F of Modular Switch, One Module, 1-Way, 16 Amps, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 11 | S&F of Modular Bell push, One Module, 6 Amps, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 12 | S&F of Modular Socket, 3 Pin, combined, Two Module, 6 Amp, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 13 | S&F of Modular Socket, 2/3 Pin, combined, Two Module, 16 Amp, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 14 | S&F of Modular type electronic fan regulator, Two module, 120W, 240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 15 | S&F in-repair of modular cover plate (white) with frame, 2-module, complete all as specified and as directed by Engineer-in-charge. |
| 16 | S&F in-repair of modular cover plate (white) with frame, 3-module, complete all as specified and as directed by Engineer-in-charge. |
| 17 | S&F in-repair of modular cover plate (white) with frame, 4-module, complete all as specified and as directed by Engineer-in-charge. |
| 18 | S&F in-repair of modular cover plate (white) with frame, 6-module, complete all as specified and as directed by Engineer-in-charge. |
| 19 | S&F in-repair of modular cover plate (white) with frame, 8-module, complete all as specified and as directed by Engineer-in-charge. |
| 20 | S&F in-repair of modular cover plate (white) with frame, 12-module, complete all as specified and as directed by Engineer-in-charge. |
| 21 | S&F in-repair of Modular Switch, One Module, 1-Way, 6 Amps, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 22 | S&F in-repair of Modular Switch, One Module, 1-Way, 16 Amps, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 23 | S&F in-repair of Modular Bell push, One Module, 6 Amps, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 24 | S&F in-repair of Modular Socket, 3 Pin, combined, Two Module, 6 Amp, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 25 | S&F in-repair of Modular Socket, 2/3 Pin, combined, Two Module, 16 Amp, 240 Volt, conforming to IS and connecting up, complete all as specified and as directed. |
| 26 | S&F of Switch piano, flush type single pole, One way 5/6 Amp, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 27 | S&F of Bell push, flush type, 5/6 amp, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 28 | S&F of Bell Buzzer/ Ding Dong, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 29 | S&F of Socket outlet 3/5 pin, 5/6A, flush type, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 30 | S&F of Switch socket combination 2 in 1, 3/5 pin, 15/16 Amp, flush type universal, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 31 | S&F of Switch socket combination 2 in 1, 3/5 pin, 5/6A flush type, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 32 | S&F of stepped type electronic fan regulator flush type on the existing phenolic laminated sheet etc. as reqd., 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 33 | S&F of ceiling rose surface backelite three terminals, PVC/ polycarbonate, insulated body, complete all as specified and as directed by Engineer-in-charge. |
| 34 | S&F in-repair of Switch piano, flush type single pole, One way 5/6 Amp, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 35 | S&F in-repair of Socket outlet 3/5 pin, 5/6A, flush type, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 36 | S&F in-repair of Switch socket combination 2 in 1, 3/5 pin, 15/16 Amp, flush type universal, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 37 | S&F in-repair of Switch socket combination 2 in 1, 3/5 pin, 5/6A flush type, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 38 | S&F in-repair of Bell push, flush type, 5/6 amp, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 39 | S&F in-repair of Bell Buzzer/ Ding Dong, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 40 | S&F in-repair of Modular type electronic fan regulator, Two module, 120W, 240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 41 | S&F in-repair of stepped type electronic fan regulator flush type on the existing phenolic laminated sheet etc. as reqd., 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 42 | S&F in-repair of Lamp holder, PVC/Polycarbonate type with back plate suitable for batten fittings, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 43 | S&F in-repair of ceiling rose surface backelite three terminals, PVC/ polycarbonate, insulated body, complete all as specified and as directed by Engineer-in-charge. |
| 44 | S&F in-repair of fan capacitor of 2.5 mfd, 220-240V, AC, complete all as specified and as directed by Engineer-in-charge. |
| 45 | S&F in-repair of Sub-main Wiring with 2-Runs of Single Core 6.0 Sq mm PVC insulated FRLSH multi-stranded 1100 Volts grade with Copper Conductor drawn through and including Non-metalic Rigid PVC Casing capping ISI marked and its Accessories including 1-Run of Single Core 6.0 Sq mm PVC insulated FRLSH unsheated multi-stranded 1100 Volts grade with Copper Conductor Cable as Earth Continuty Conductor along with the Wiring and connected from DB to DB/Main Board, complete all as specified and as directed.NOTE :- (a) Cost of PVC Casing capping with all Fittings/Accessories will deem to be included in the quoted UNIT RATE.(b) Cables as mentioned in SCHEDULE ‘A’ Items and 1-Run of PVC Casing capping with all Fittings/Accessories will be measured and paid as ONE UNIT.(c) Sub-main Wiring will be measured as length of PVC Casing capping only. Wire required for looping, etc as ordered will deem to be included in the quoted UNIT RATE. |
| 46 | S&F in-repair of Sub-main Wiring with 2-Runs of Single Core 4.0 Sq mm PVC insulated FRLSH multi-stranded 1100 Volts grade with Copper Conductor drawn through and including Non-metalic Rigid PVC Casing capping ISI marked and its Accessories including 1-Run of Single Core 4.0 Sq mm PVC insulated FRLSH unsheated multi-stranded 1100 Volts grade with Copper Conductor Cable as Earth Continuty Conductor along with the Wiring and connected from DB to DB/Main Board, complete all as specified and as directed.NOTE :- (a) Cost of PVC Casing capping with all Fittings/Accessories will deem to be included in the quoted UNIT RATE.(b) Cables as mentioned in SCHEDULE ‘A’ Items and 1-Run of PVC Casing capping with all Fittings/Accessories will be measured and paid as ONE UNIT.(c) Sub-main Wiring will be measured as length of PVC Casing capping only. Wire required for looping, etc as ordered will deem to be included in the quoted UNIT RATE. |
| 47 | S&F in-repair of surface mounted PVC box of size 100 mm x 100 mm and 50 mm deep, complete all as specified and as directed by Engineer-in-charge. |
| 48 | S&F in-repair of surface mounted PVC box of size 100 mm x 175 mm and 50 mm deep, complete all as specified and as directed by Engineer-in-charge. |
| 49 | S&F in-repair of surface mounted PVC box of size 200 mm x 150 mm and 50 mm deep, complete all as specified and as directed by Engineer-in-charge. |
| 50 | S&F in-repair of surface mounted PVC box of size 250 mm x 200 mm and 50 mm deep, complete all as specified and as directed by Engineer-in-charge. |
| 51 | S&F in-repair of Sheet Metal Enclosure MCB DB SPN, 2 way 240 volt, with rated Bus-bar, Single door type MCB DB suitable for mounting incoming and outgoing MCBs of any type, complete all as specified and as directed by Engineer-in-charge. |
| 52 | S&F in-repair of Sheet Metal Enclosure MCB DB SPN, 4 way 240 volt, with rated Bus-bar, Double door type MCB DB suitable for mounting incoming and outgoing MCBs of any type, complete all as specified and as directed by Engineer-in-charge. |
| 53 | S&F in-repair of Sheet Metal Enclosure MCB DB SPN, 8 way 240 volt, with rated Bus-bar, Double door type MCB DB suitable for mounting incoming and outgoing MCBs of any type, complete all as specified and as directed by Engineer-in-charge. |
| 54 | S&F in-repair of Sheet Metal Enclosure MCB DB SPN, 12 way 240 volt, with rated Bus-bar, Double door type MCB DB suitable for mounting incoming and outgoing MCBs of any type, complete all as specified and as directed by Engineer-in-charge. |
| 55 | S&F in-repair of Sheet Metal Enclosure MCB DB TPN, 4 way 415 volt, with rated Bus-bar, Double door type MCB DB suitable for mounting incoming and outgoing MCBs of any type, complete all as specified and as directed by Engineer-in-charge. |
| 56 | S&F in-repair of MCB Triple Pole & Neutral (TPN), 'C' Curve, 40-100 Amps, 415 Volt for fixing on MCB DB’s, 10 KA, 50 Hz, conforming to IS/IEC 60898, connecting up and testing, complete all as specified and as directed by Engineer-in-charge. |
| 57 | S&F in-repair of MCB Triple Pole & Neutral (TPN), 'C' Curve, 16-32 Amps, 415 Volt for fixing on MCB DB’s, 10 KA, 50 Hz, conforming to IS/IEC 60898, connecting up and testing, complete all as specified and as directed by Engineer-in-charge. |
| 58 | S&F in-repair of MCB Single Pole & Neutral (SPN), 'C' Curve, 6-32 Amps, 240 Volt for fixing on MCB DB’s, 10 KA, 50 Hz, conforming to IS/IEC 60898, connecting up and testing, complete all as specified and as directed by Engineer-in-charge. |
| 59 | S&F in-repair of MCB Single Pole & Neutral (SPN), 'C' Curve, 40-63 Amps, 240 Volt for fixing on MCB DB’s, 10 KA, 50 Hz, conforming to IS/IEC 60898, connecting up and testing, complete all as specified and as directed by Engineer-in-charge. |
| 60 | S&F in-repair of MCB Single Pole (SP), 'C' Curve, 6-32 Amps, 240 Volt for fixing on MCB DB’s, 10 KA, 50 Hz, conforming to IS/IEC 60898, connecting up and testing, complete all as specified and as directed by Engineer-in-charge. |
| 61 | S&F in-repair of LED strip light (warm white), AC, IP-65 rated, 6W/ mtr, 220-240V, 50Hz, alongwith connector, power plug, bridge rectifier and all connected items, complete all as specified and as directed by Engineer-in-charge. |
| 62 | S&F in-repair of surface and wall mounted LED tube light fitting (Decorative, Box type) 1x 20W, (4 Feet) with aluminium housing, 6500K, 220-240 Volts, AC decorative regal type with and including LED tube light connecting up with three core flexible copper conductor cable of suitable size from ceiling rose to fitting, complete all as specified and as directed by Engineer-in-charge. |
| 63 | S&F in-repair of surface and wall mounted LED light fitting mirror type 1x 10W, (2 Feet) with aluminium housing & integrated electronic driver, 6500K, 220-240 Volts, AC decorative box type with and including LED lamp connecting up with three core flexible copper conductor cable of suitable size from ceiling rose to fitting, complete all as specified and as directed by Engineer-in-charge. |
| 64 | S&F in-repair of surface and wall mounted LED 20 Watts tube Rod (4 Feet) with plycarbonate housing and very high efficiency, complete all as specified and as directed by Engineer-in-charge. |
| 65 | S&F in-repair of 12W Elegantly designed sleek surface/recess mounted pressure die-cast aluminium luminaire in powder coated white finish in square/round profile with optimized heat sink for efficient heat dissipation and independent electronic LED driver, Ac 220-240V, connecting up with three core flexible copper conductor cable of suitable size from ceiling rose to fitting, complete all as specified and as directed by Engineer-in-charge. |
| 66 | S&F in-repair of decorative wall light (indoor) of brushed nickel/ chromium finish with opal glass diffuser and 10Watt LED lamp of E-27 base, complete all as specified and as directed by Engineer-in-charge. |
| 67 | S&F in-repair of decorative dual wall light (indoor) of brushed nickel/ chromium finish with opal glass diffuser and 10Watt LED lamp of E-27 base, complete all as specified and as directed by Engineer-in-charge. |
| 68 | S&F in-repair of 10 watt capacity, B-22 base LED Bulb/ lamp (Warm white/ Cool White), complete all as specified and as directed by Engineer-in-charge. |
| 69 | S&F in-repair of slim square panel LED luminaire with frame 600 mm x 600 mm, white powder coated with CRCA housing, 35/36 watt, 220-240 V, AC recessed type with high efficiency PMMA diffuser soft glare free light complete with driver, holders & LED lamp suitable for roof ceiling including connecting up with three core flexible copper conductor cables of suitable size, complete all as specified and as directed by Engineer-in-charge. |
| 70 | S&F in-repair Energy saving new generation environmental friendly long life versatile presure die cast aluminium housing IP 66 building security light fitting luminaire with high power LEDs as light source and electronic driver of capacity 25 watts with pre wired and lens embedded PC cover having Bottom opening seperate driver compartment and Impact resistance of IK08 with necessary mounting arrangements/ fixing bracket, complete all as specified and as directed by Engineer-in-charge. (NOTE- the cost of G.I. pipe bracket, bracket mounting clamp, bolts and nuts shall be paid separately) |
| 71 | M&L for earthing complete with galvanised steel earth plate electrode of size 600 mm x 600 mm x 6 mm thick buried directly in ground (earth pit not less than 2.25 mtr deep below normal ground level) with top edge of the plate not less than 1.5 mtr below ground level, connected to galvanized earth wire 4.00 mm dia by means of bolts nuts check nuts & washers of galvanized iron or steel , procteded by GI pipe 15 mm bore( light grade) and watering pipe 20 mm bore GI pipe (medium grade) and chamber and coping shall be in PCC 1:3:6 type C1 using 20mm graded stone agg. 50 mm thick cover of RCC 1:2:4 type B1 using 20 mm graded stone agg. reinforced with 8 mm dia MS tor bar @ 80 mm c/c both ways including excvation and earth work and removal of surplus soil complete all as shown in electrical plate no 3 of SSR PT 1, 1991 with charcoal dust and salt complete and earth lead connected to earthing test point (up to main switches, DBs) including taking down existing damaged one, complete all as specified & testing on completion. NOTE:- (i) Item includes the cost of 1.5 mtr length GI pipe for protection for GI earth wire. (ii) item rates includes the cost of 7.5 mtr GI earth wire. |
| 72 | M&L for disconnecting and taking down ceiling fan of 1200/1400 mm sweep, sealing cable end, dismantling blades and removing fan and blades to store for Opening Stator, Cleaning of Parts, replacement of Unserviceable Parts as ordered, Greasing of Moveable Parts, re-winding the coil and Re-assembling the ceiling fan after proper repair and applying two coats of synthetic enamel paint over a coat of red oxide primer by spraying including filling cavities with filler, after cleaning all dust and necessary surface preparation including hanging the ceiling fan in original position and connecting up including provision of cable from ceiling rose or connector to fan (as/if required), complete all as specified and as directed by Engineer-in-charge. NOTE:- Spare-parts and cost of re-winding shall be measured and paid separately under relevent item. |
| 73 | M&L for re-winding the coil of ceiling fan 1200/1400 mm sweep with Supper Enameled Copper Wire of same Gauge and same Weight with Insulation Paper, Varnishing and Heating, complete all as specified and as directed by Engineer-in-charge. |
| 74 | M&L for re-winding the coil of exhaust fan/ table fan/ wall fan/ pedestal fan of any sweep with Supper Enameled Copper Wire of same Gauge and same Weight with Insulation Paper, Varnishing and Heating, complete all as specified and as directed by Engineer-in-charge. |
| 75 | S&F in-repair of PVC fan blade of upto 450mm dia suitable for exhaust fan/ table fan/ wall fan/ pedestal fan, complete all as specified and as directed by Engineer-in-charge. |
| 76 | Supply only Ball Bearing No. 6201/6202/6203/6204 as approved suitable for Ceiling Fan of 1200/1400mm Sweep, complete all as specified and as directed by Engineer-in-charge. MAKE- SKF/ NBC/ TATA |
| 77 | S&F in-repair of Thermostat/Thermal cutoff suitable for Water Storage Geyser of range 0-90ºC as required, conforming to IS (Make as approved) complete all as specified and as directed. |
| 78 | S&F in-repair of Electro-plated Heating Element of any shape (as per site requirement & as approved), suitable for Electric Geyser of 1.5/2.0 KW capacity, 240 Volts, complete all as specified and as directed. MAKE : BAJAJ/RECOLD/HAVELLS/USHA |
| 79 | S&F in-repair of Stainless steel braided flexible connection pipe of 450mm long (02 Nos) with brass connector series for both inlet and outlet of Geyser, complete all as specified ans as directed. MAKE:- PRAYAG/POLYTUF/ AS EXISTING |
| 80 | S&F in repair Plug Top of 3Pin, 15/16 Amps capacity with indicator, complete all as specified and as directed. MAKE:- ANCHOR/L&T/HAVELLS |
| 81 | S&F in-repair of 1100 volts grade heavy duty cable PVC insulated aluminium stranded conductor of, served with inner sheathing of PVC tape and overall PVC sheathed in service connections suspended by insulating hangers not more than 1 metre apart including 4mm suspension wire, one twin core cable flat or circular of 16 Sqmm section, complete all as specified and as directed by engineer-in-charge. |
| 82 | All as per Item No. 81 here-in-above, but for cross-sectional area 10 Sqmm, complete all as specified and as directed by Engineer-in-charge. |
| 83 | Taking out existing Split AC of capacity 1.5/2.0Ton by carefully disconnecting existing electrical connection, removing aside, servicing after proper cleaning and refixing including all electrical connections, checking for leakage etc if any complete all as specified and directed. |
| 84 | M&L for leakage testing with nitrogen flushing and gas charging for Split type AC 1.5/2 ton with suitable refrigerant and testing complete all as specified directed. |
| 85 | Disconnecting the blower motor from the system, repairing & rewinding to the motor with suitable gauge of copper enameled wire incl replacement of two Nos bushes & bearing reconnecting the blower motor of the system properly making electrical connecting for proper function of AC 1.5 ton capacity complete all as specified and directed. |
| 86 | S&F in repair starting capacitor for different make air conditioners of 1.5/2.0 ton capacity after taking down old unserciveable worn out starting capacitor, complete all as specified and as directed by Engineer-in-charge. |
| 87 | Supply and fix in repair running capacitor suitable for AC 1.5/2 Ton capacity complete all as specified and directed. |
| 88 | Supply and fix in repair thermostate for split type AC of suitable capacity(1.5/2.0 Ton) as per site requirement complete all as specified and directed. |
| 89 | Supply and fix in repair relay assembly suitable capacity (1.5/2.0 Ton) as per site requirement complete all as specified and directed.. |
| 90 | S&F in repair of overload protection for 1.5/2.0 ton split AC capacity as per site requirement, complete all as specified and as directed by Engineer-in-charge. |
| 91 | Supply and fix in repair strainer for following capacity 1.5/2.0 to split type air conditioners complete all as specified and directed. |
| 92 | S&F in replacement of contactor for 1.5/2.0 Ton Split type/window type AC complete all as specified and directed.. |
| 93 | Re- Installation/Shifting of Split AC of capacity 1.5/2.0 ton when and where required including gas recharge and fixtures such as bracket ,bolt, nuts wall drilling , complete all as specified and directed. |
| 94 | S&F in repair indoor unit air filter for split type AC of capacity 1.5/2 ton capacity complete all as specified and directed. |
| 95 | Supply and fix in repair PCB with/ without inverter type suitable for window/Split AC any type of capacity 1.5/2.0 ton as per existing make complete all as specified and directed. |
| 96 | S&F in repair fan blower motor (indoor/ outdoor) for split type AC of capacity 1.5/2.0 Ton as per site requirement of existing make available at site complete all as specified and directed. |
| 97 | S&F in repair of ODU stand/bracket for split AC of 1.5/2 ton Capacity including fitting such as wall bracket ,nuts ,bolts, MS stands etc complete all as specified and directed. |
| 98 | Material and labour in repair of copper condenser coil of split type AC of capacity 1.5/2 ton complete all as specified and directed. |
| 99 | Material and labour in repair of cooling coil of split type AC of capacity 1.5/2 ton complete all as specified and directed. |
| 100 | S&F hermetically sealed compressor unit for 1.5/2.0 ton split AC complete including vacuuming and gas charging and connecting all electrical and gas pipe connection and testing after taking down carefully unserviceable compressor unit from base by dismantling all electrical /gas connections, complete all as specified and as directed by Engineer-in-charge. |
| 101 | S&F in repair of copper tubing of 1/2\\"/3/8\\"/1/4\\" including teflon capping, complete all as specified and as directed by Engineer-in-charge. |
| 102 | S&F in repair of water tube PVC 1/2\\" to 1/4\\" for connection of water outlet line including clamp and necessary arrangement, complete all as specified and as directed by Engineer-in-charge. |
| 103 | S&F in replacement of insulation cover of size 5/8\\" for insulating copper tube of split type AC all per directed by the Engineer-in-Charge. |
| 104 | S&F in replacement of of flair nut for tighting the inlet valve of gas of desire size for connection of indoor and outdoor of split AC all per directed by the Engineer-in-Charge. |
| 105 | S&F in replacement PVC insulated & PVC Sheathed three core cable of size 2.5 sqmm with copper conductor 1100 Volts grade conforming to IS:694/1990 ISI all as specified and directed. |
| 106 | Supply and fix in repair fan blade for AC 1.5/2 Ton capacity complete all as specified and directed. |
| 107 | Supply and fixing in repair of swing motor for 1.5/2 ton capacity split AC as required at site including taking out old swing motor complete all as specified and as directed. |
| 108 | Disconnecting refrigerator of capacity upto 335 ltrs for cleaning with blower & soap water solution making dust free to the system, tighting all nuts bolts screws etc and refixing the refrigerators in existing places properly, complete all as specified and as directed by Engineer-in-charge. |
| 109 | Material and labour for leak testing with nitrogen and gas charging with suitable refrigerant in the system including cleaning the system with CTC, rectification of leakage and replacement of strainer/capillary tube of Refrigerator, Deep freeer, water cooler of any capacity complete all as specified and as directed by Engineer-in-charge. |
| 110 | S&F in repair of starting capacitor of suitable capacity of Refrigerator, Deep freeer, water cooler complete all as specified and as directed by Engineer-in-charge. |
| 111 | S&F in repair of running capacitor of suitable capacity of Refrigerator, Deep freeer, water cooler complete all as specified and as directed by Engineer-in-charge. |
| 112 | S&F in repair of box type relay assembly of Refrigerator, Deep freeer, water cooler complete all as specified and as directed by Engineer-in-charge. |
| 113 | S&F in repair of thermostat of Refrigerator, Deep freeer, water cooler complete all as specified and as directed by Engineer-in-charge. |
| 114 | S&F in repair of overload protection relay suitable for Refrigerator, Deep freeer, water cooler complete all as specified and as directed by Engineer-in-charge. |
| 115 | S&F in repair of cooling coil for Refrigerator, Deep freeer, water cooler complete all as specified and as directed by Engineer-in-charge. |
| 116 | S&F in repair of door gasket for Refrigerator, Deep freeer, water cooler complete all as specified and as directed by Engineer-in-charge. |
| 117 | S&F in repair of PCB for Refrigerator, Deep freeer, water cooler of any capacity and type (single/ double) complete all as specified and as directed by Engineer-in-charge. |
| 118 | Supply and fix in repair stand for refrigerator/Water cooler of any capacity complete all as spd and directed. |
| 119 | S&F in replacement of evaporator coil unit complete suitable for Refrigarator/Deep Freezer of any capacity complete all as specified and directed. |
| 120 | Supply and fix in replacement of ice chamber cabinet of Refrigerator of capacity upto 320 ltrs complete all as specified and directed. Note: Rate of Refrigrant R-134a shall be included in quoated rate. |
| 121 | S&F in repair of compressor of refrigerator/Deep freezer of capacity upto 335 ltrs and re-connecting the compressor to the system properly. including recharging refrigerant gas, complete all as specified and as directed by Engineer-in-charge. |
| 122 | S & F in repair compressor of capacity upto 150 ltrs capacity water coolers . including recharging refrigerant gas and testing complete all as specified and directed. |
| 123 | S&F in repair fan blower motor for Refrigerator/Deep freezer/waer cooler of any capacity as per site requirement of existing make complete all as specified and directed. |
| 124 | S&F in repair of door gasket for Deep freeer upto 405 Ltr capacity, complete all as specified and as directed by Engineer-in-charge. |
| 125 | S&F in replacement of tap chromium plated 15 mm dia suitable for water cooler all as specified and directed. |
| 126 | Supply and fix in repair float valve suitable for 80/120 ,40/80, 120/150 ltrs capacity water cooler complete all as specified and as directed. |
| 127 | M&L for re-winding of coil of stabilizer of any capacity complete all as specified and as directed by Engineer-in-charge. |
| 128 | AQUA GUARDTaking down aqua guard any capacity from its position by disconnecting electric connection and separate the usefull components for reuse in the same work and repair/replacement the unserviceable components, complete all as specified and directed by Engineer-in-Charge.NOTE :- Parts replaced of Aqua Guard shall be measured and paid separetly under respective items. (MAKE of spare parts- Kent/ Eureka forbes/ as existing) |
| 129 | (a) zinc copper alkaline filter |
| 130 | (b) RO membrane filter |
| 131 | (c) UV filter |
| 132 | (d) Activation carbon filter |
| 133 | (e) Booster pump for aqua guard |
| 134 | (f) PCB rect (exchange basic) hi flow |
| 135 | (g) Heavy metal remover cartridge assy |
| 136 | (h) Eva tube kit |
| 137 | (j) Transformer (inova) |
| 138 | (k) Carbon block |
| 139 | (l) Eva Pipe 2 mtr long |
| 140 | (m) water suction pump |
| 141 | REVERSE OSMOSIS (R.O) PLANTTaking down R.O plant of discharge capacity upto 300 Ltrs/hour from its position by disconnecting electric & water connection, servicing the same by cleaning the filters with the help of clean water and compressed air as required, dismantling the unserviceable part/components, complete all as specified and directed by Engineer-in-Charge.NOTE :- Spare parts shall be measured and paid separetly under respective items. (MAKE of spare parts- Kent/ Eureka forbes/ as existing) |
| 142 | (a) Sediment filter |
| 143 | (b) Low pressure switch |
| 144 | (c) Activated carbon filter |
| 145 | (d) Solenoid valve |
| 146 | (e) Booster pump |
| 147 | (f) TDS Control valve |
| 148 | (g) RO membrane |
| 149 | (h) Flow restrictor Tube |
| 150 | (j) UF Membrane |
| 151 | (k) Non return valve |
| 152 | (l) High pressure switch |
| 153 | (m) Post carbon filter |
| 154 | (n) SMPS unit |
| 155 | (o) UV equaliser with UV lamp |
| 156 | Supplying and charging in layers new washed, cleaned, dust free, well graded gravels filter media suitable for use in filtration plant of suitable size complete all as specified and as directed by Engineer-in-charge. |
| 157 | Supplying and charging in layers special fine/coarse sand suitable for use in filtration plant of size 1/8 mm x 1/16 mm mesh complete all as specified and as directed by Engineer-in-charge. |
| 158 | Supply and charging in layers manganese dioxide (MnO2) treated charcoal in lumps of sizes 20 mm to 15 mm containing at least 65% of manganese, suitable for use in filtration plant complete all as specified and as directed by Engineer-in-charge. |
| 159 | Supply and charging in layers Granule Anthracite in lumps suitable for use in filtration plant complete all as specified and as directed by Engineer-in-charge. Please Enable Macros to View BoQ information |