| 1 | Excavation for roadway in Marshy Soil with hydraulic excavator 0.90 cum buket capacity including and loading in tippers and disposel with a lift upto 1.5 m and lead upto 1000m, trimming of bottom and side slopes in accodance witth requiements of lines, grade and cross-section as per Technical Speification Clause 302.3.6 |
| 2 | Dismantling of existing structures like culverts,bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work including T&P and scaffolding wherever necessary,sorting the dismantled material,disposal of unsericeable material and stacking the servieable material with all lifts and lead of 1000 m as per Technical Specification SR No.2.5 Ref No.202( dismantling of bricks\ tiles work) |
| 3 | Providing concrete for plain/reinforced concrete in (P.C.C grade M 10)(1:3:6) open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203. I/c all cess, Labour cess, levy, toll fee, royalty, Contractor Profit but excluding GST. |
| 4 | Reinforced cement concrete M20 (1:1.5:3) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204/1.1.5.3 |
| 5 | Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specificatio Clause 1002,1005,1010 & 1202 |
| 6 | M.s work in heavy size such as trusses built up gates,record racks, roof work, channel, gates etc including rivet(ing or welding where necessary rectangular tubes 76.2x38x3.25 mm andincluding of all work complete AS PER REQUIREMENT |
| 7 | Providing & fixing empty cement bags filled with local earth hand sewing with suja & sutli and placing in position within 60 m including cost of E.C.Bags all labour material and T&P required for proper completion of work.SI. 5.10 (a) |
| 8 | Dewatering work or undergroung water as well assurface water with the help of diesel engine pumpingJset during earth wOrK in excavation of foundation for|/laying lean concrete and brick work in foundation/dha es, labour and other T&P incldingincdluding ost of hire chargeg of pumping set, fuel|operaton as por requierment at site &as directed bycoSt of the Engineer-in-charge( 10 hp) 20 days |
| 9 | Provision of Shilanyas and Likarpan Granite Stone engraved and filling with colour paint including all charges of labour, matarial tools,tackles, transportion, fixing stands and frames etc for inauguration. Please Enable Macros to View BoQ information |