|
| 1 | Name of dept.Water Resource Department, Punjab Division:Barnala Canal and Ground Water Division, Barnala Name of the work: Estimate for Remodeling/Reconstruction of Aqueduct at RD 16041 of Sub Minor no. 4 of Handiaya Minor Name of Firm Sr.No Description Unit Qty. Rate (in figures) Rate (in Words) |
| 2 | Dismentalling Of Brick Work |
| 3 | Dismantling concrete 1:3:6 |
| 4 | Dismentalling Of Reinforced cement concrete |
| 5 | Earth work in excavation of foundation of structure as per drawing and technical specification, including setting |
| 6 | Preparing, watering & ramming surface of layingconcrete (horizontal). |
| 7 | Plain/RCC in sub structure complete as per drawing and technical Specifications. PCC Grade M15. Height upto 5m |
| 8 | Plain/RCC in Super structure complete as per drawing and technical Specifications. RCC Grade M25. Height upto 5m |
| 9 | Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per drawing and technical specifications |
| 10 | Providing and filling joint sealing compound with coarse sand and 6 percent bitumen by weight complete as per drawings and technical clause 2605 of MORT&H specifications. |
| 11 | First Class Brick masonry In Mud |
| 12 | Dismentalling of Brick Work In Mud |
| 13 | Scraping of Bricks dismantled from brick work in mud. |
| 14 | HYSD Bars (fe 500) |
| 15 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H |
| 16 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification |
| 17 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M15 |
| 18 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 ((a)) Height upto 5m ((ii)) With Batching Plant, Transit Mixer and Concrete Pump |
| 19 | NOC PWD PUNJAB GOVT |
| 20 | Dismantling in cement concrete. Reinforced concrete. |
| 21 | Back filling behind abutment, wing wall andreturn wall complete as perdrawing and TechnicalSpecification. Sandy material. |
| 22 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. Complete in all respect as per drawings, designs, specifications and instructions of Engineer- in-charge. |
| 23 | Earthwork in excavation in foundation of bridges, culverts, buildings including handling of materials with a combined lead of 15 meters dressing of bed and side stacking the excavated soil from the edge of excavation and subsequent filling around:- (a) For ordinary gravel soil involving pick work. Complete in all respect as per drawings, designs, specifications and instructions of Engineer- in-charge. |
| 24 | Supplying, fitting and placing HYSD bar reinforcumcement in super-structure completeas per drawing and technical specifications. |
| 25 | Add Extra for differnece in rate of coarse sand and carriage cost |
| 26 | Add Extra for differnece in rate of coarse sand and carriage cost |
| 27 | Furnishing and Placing Reinforced/Prestressed cement concretein/sub-structure superstructureas per drawing and Technical Specification. Using Batching Plant, Transit Mixer and Concrete Pump For Solid slab super-structure including vibrator (M-30) |
| 28 | Any other item |