|
| 1 | Annexure-A (LABOUR CHARGES) |
| 2 | Fabrication of MS Channel angle iron etc in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESPO schedule and local approved drawing. |
| 3 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all types of soil including proper dressing of sides and ramming of bottom including etting out the excavated soil and disposal of surplus excavated soil as directed complete work. |
| 4 | Erection of PCC single support pole in proper level and alignment along with fixing of all accessories like top channel & clamps as per RESPO manual. |
| 5 | Dismantling of Transformers from double pole /plinth including opening of all connections, circuts & earthing strip etc. (100 KVA). |
| 6 | Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120, 150 Sq.mm. (Including all cost of material). |
| 7 | Excavation of earth of size 2.1x2.1x1.2 meter for DTR Plinth |
| 8 | Brick work in 1:4 ratio of DTR Plinth. |
| 9 | RCC Work of 1:2:4 ratio 15 cm thickness of DTR Plinth |
| 10 | Cement Plaster on side walls in 1:4 ratio on DTR Plinth |
| 11 | Erection, providing and fixing of wire mesh of size 50x35 mm around plinth and toe wall duly welded with frame of M.S angle iron 35 x35x6 mm and strip of size 35x6 mm in mid of each side along with wire mesh (width of wire mesh 1.5 meter ) with the height of 0.5 meter above the plinth and 2 meter above the toe wall with 1 No. gate and locking arrangment in the toe wall size including grouting of 6 Nos. legs in the ratio in block of size 0.25x0.25x0.45 meter including gravlling of shingle of size 20 to 40 mm and complete painting of wire mesh with aluminium paint with two coat (Including the cost of cement and all material) |
| 12 | Installation/ mounting of new 250 KVA Tranformer on plinth structure and fixing of channel / angle etc. and making all connections of HT and LT side and its complete commissioning. |
| 13 | Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work. |
| 14 | Cartage of PCC Poles from store centre to construction site with loading, unloading at both points and proper stacking.(Distance 51- 70 Km) |
| 15 | Cartage of other material (other than poles) by vehicle from Store Center to nearest construction site Store including loading and unloading at both ends(distance 51-70 Km) |
| 16 | Cartage of the 100 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 21-50 Km) |
| 17 | Cartage of the 250 KVA transformer from store center to construction site with loading and unloading at both points.(Distance 51-70 Km) |
| 18 | Headload cartage of PCC Pole from road to site (distance 0-1 Km) |
| 19 | Headload cartage of small material (distance 0-1 Km) |
| 20 | Headload cartage of 100 KVA transformer from road to site(distance 0-1 Km) |
| 21 | Headload cartage of 250 KVA transformer from road to site(distance 0-1 Km) |
| 22 | Disconnection and reconnection of consumer connection. |
| 23 | Installation of LT Distribution Box complete work both 1 Phase and 3 Phase. |
| 24 | Laying, Sagging & binding of AB cable of size 120 sqmm.(Only for cable, additional provisions to be made for matching accessories installation, case of any network modification i.e additionalpole etc. and for actual connection,disonnection as per site condition. |
| 25 | Laying & Fixing Insulated Cable LT XLPE Alu. Cond. Power cable. |
| 26 | Fixing of Ded end Clamp with I Hook. |
| 27 | Fixing of Suspension Clamp with I Hook. |
| 28 | Installation of ACB LT Distribution Box. |
| 29 | Straighthning & Laying of GI Strip Earthing for Structure /Panel. |
| 30 | Fixing of E.S.E. in the yard of sub-station with grouting of high mast pole, connecting with Copper Cable from lightning arrestor to earth pit in direction of Engineer-in-Charge complete work in all respect. |
| 31 | Making of Earthing with digging of pit 3 mtr depth & grouting the earthing pipe with filling of BFC (Back Filled Compound) & Connect the Copper Cable with Earthing Pipe upto ESE & Counter. |
| 32 | Annexure-B (SUPPLY ITEMS) (As per UPCL Norms) |
| 33 | Supply of LT Bare N.Conn.PG. Clamp L-DB 120-25 Sq.mm |
| 34 | Supply of Suspension Clamp Eye Hook LT ABC Cable |
| 35 | Supply of MS Clamp with N&B for Distribution Box. |
| 36 | Supply of MS Clamp for Dead End Clamp with N&B. |
| 37 | Supply of Dead End Clamp with I Hook |
| 38 | Supply of GI Strip 35x5 mm. |
| 39 | Supply of MS Clamp with N&B for Suspension Clamp |
| 40 | LT Cable PVC 1x25 mm |
| 41 | Supply of SMC Three Phase L.T. Distribution Box with inbuilt panal lock, Al bus bar RYB 25x6mm., Al Busbar N. 40x6mm. for connection of L.T. consumer (Sintex make or other ISI mark reputed company ) with Panel Lock with key) |
| 42 | Supply of LT ACB Panel 800A with Metering CT & Box |
| 43 | Supply of Al. Crimping Type Lugs 400 Sq.MM |
| 44 | Supply of Aluminium Lugs O Type 25 mm (4x25) |
| 45 | Supply of Al. Strip size 40x5 mm with 2 nos. holes. |
| 46 | Supply of IPC for 120 Sqmm to 25 Sqmm |
| 47 | Supply of IPC for 120 Sqmm to 120 Sqmm |
| 48 | Supply of Ace Chemrod DIA60MM length 3000MM |
| 49 | Supply of Fluid Compound for Chemical Earthing Rod. Please Enable Macros to View BoQ information |