| 1 | Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 2 | Sand Filling in foundation trenches as per drawing & technical specification |
| 3 | Providing and laying Pitching of slopes laid over prepaired filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specification . |
| 4 | Plain/Reinforced Cement concrete in open Foundation complete as per Drawing and Technical specifications. PCC Grade M15 using batching plant & manual placing |
| 5 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M15 |
| 6 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Random Rubble masonry (coursed/uncoursed) |
| 7 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications Random Rubble Masonry (Coursed/uncoursed) |
| 8 | Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M20 Height upto 5m |
| 9 | Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 |
| 10 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications |
| 11 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. |
| 12 | Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications. |
| 13 | Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications Granular Material |
| 14 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications |
| 15 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification |
| 16 | Providing 25mm thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 17 | Providing 12mm thick cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 18 | Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. |
| 19 | CARRAGE OF MATERIALSCEMENT = 35 KM |
| 20 | STEEL =35 KM |
| 21 | BOULDER =70 KM |
| 22 | STONE CHIP =70 KM |
| 23 | SAND = 12 KM |
| 24 | Add 18% for G.S.T. |
| 25 | Labour Cess Please Enable Macros to View BoQ information |