| 1 | Cleaning Grass and Removal of Rubbish upto Distance of 30m outside the Periphery of the Area as per Technical specification Clause 201 |
| 2 | Compacting orignal ground Supporting subgrade (Loosening of the ground upto a level of 500 mm below the subgrade level ,watered graded & compacted in layer to meet requirement of the table 300 -2 for subgrade construction SOR no 3.30 I case no 1 |
| 3 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50M including all lift leveling ramming the foundation trenches, removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I. |
| 4 | Construction of subgrade and earthen shoulder with approved material obtained from borrow pit with all lifts and leads , Transporting to the site ,spreading grading to required slope and compacted to meet required to table 300.2 with 1000m leads as per technical specification clause 301. |
| 5 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Grade II |
| 6 | Providing and laying in position cement concret of specified grade excluding the cost of centring and shuttering -All work upto plinth level:-(1:1.5:3(1cement :1.5coarse sand (zone-III):3 graded stone aggregate 20mm nominal size) |
| 7 | Providing and laying dry rubble flooring complete as per drawing and Technical specification Clause 2506 |
| 8 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. A PCC Grade M15 |
| 9 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. A PCC Grade M15 |
| 10 | Stone masonary work in cement mortar 1:3 Foundation complete as per drawing and Technical speciication RRSM in CM 1:3 In Foundation |
| 11 | Stone masonary work in cement mortar 1:3 Superstructure complete as per drawing and Technical speciication RRSM in CM 1:3 In Superstructure |
| 12 | Stone masonary work in cement mortar 1:3 Foundation complete as per drawing and Technical speciication RRSM in CM 1:3 In Foundation |
| 13 | Stone masonary work in cement mortar 1:3 Superstructure complete as per drawing and Technical speciication RRSM in CM 1:3 In Superstructure |
| 14 | Plain/Reinforced cement concrete in Sub Structure complete as per drawing and technical specifications. A PCC Grade M20 in Abutment Cap |
| 15 | Furnishing and Placing Reinforced?Prestressed Cement Concrete in sub structure as per Drawing and Technical specfication (RCC Grade M25 in Deck Slab) |
| 16 | Providing and Laying cement Concrete wearing coat M30 grade including reinforcment complete as per drawing and Technical Specification |
| 17 | Providing M.S Reinforcement (tor steel) as per approved design , drawing removal of rush , curing ,bending , binding including supplying annealed wire , placing M.S rods …..do…do all complete |
| 18 | Plastering with cement mortar (1:3) on brick or stone masonary work in structure Technical specification clause 613.4,1204 |
| 19 | Providing weep hole in brick/stone masonary Plain/Reinforced concrete abutment,wing wall ,return wall with 100mm dia AC Pipe extending through the full width the structure with slope of 1(v):20(H) towards drawing face complete as per drawing and Technical Specification Clause 614,709,1204,3.7 |
| 20 | Back filling behind abutment wingwall and returnwall with sandy material complete as per drawing and Technical specification Clause 1204.3.8 SOR Item NO 13.9B |
| 21 | Carriage of Materials - Cement |
| 22 | Chips |
| 23 | Stone Dust |
| 24 | Boulder |
| 25 | Metal |
| 26 | Add GST @ 18% |
| 27 | Add Labour Cess @1% Please Enable Macros to View BoQ information |