| 1 | A) Complete repairing and rewinding of 01 no 225 KW, 3.3KV make- siemens Induction Motor, Sl. No 614 of Topa Project under Kuju Area |
| 2 | Cost of DGC copper wire/strip of size 6mmX2mm or 8 SWG (60 coil of 3 kg each coil) |
| 3 | Insulation Cost @ 15% of total copper cost |
| 4 | Labour cost @ 15% of total copper cost |
| 5 | Cost of moulding of one coil with Craption, nomax and mica with class \\"H\\" insulation |
| 6 | Cost of repairing of both DE & NDE end cover by assorted welding by machinable CI electrode formaterial filling and machaning as per bearing sixe |
| 7 | Cost of repairing of cable entry box/terminal box by drilling welding and thread cutting |
| 8 | Cost of dismantling and reassembling of motor after repairing |
| 9 | Cost of testing induction motor 1. insulation resistance value. 2. Winding resistance test. 3. High potential teat. 4. Direction of rotation and phase sequece test from WABL accredited Lab |
| 10 | Less scrap value @ 60% of total copper cost |
| 11 | B) Complete repairing and rewinding of 01 no 180 KW, 3.3KV make- siemens Induction Motor, Sl. No 200/05 of Topa Project under Kuju Area |
| 12 | Cost of DGC copper wire/strip of size 6mmX2mm or 8 SWG (60 coil of 2.4 kg each coil) |
| 13 | Insulation Cost @ 15% of total copper cost |
| 14 | Labour cost @ 15% of total copper cost |
| 15 | Cost of moulding of one coil with Craption, nomax and mica with class \\"H\\" insulation |
| 16 | Cost of repairing of both DE & NDE end cover by assorted welding by machinable CI electrode formaterial filling and machaning as per bearing sixe |
| 17 | Cost of repairing of cable entry box/terminal box by drilling welding and thread cutting |
| 18 | Cost of dismantling and reassembling of motor after repairing |
| 19 | Cost of testing induction motor 1. insulation resistance value. 2. Winding resistance test. 3. High potential teat. 4. Direction of rotation and phase sequece test from WABL accredited Lab |
| 20 | Less scrap value @ 60% of total copper cost |
| 21 | C) Repairing/reconditioning of 180KW, 3.3KV Alstrom motor make of Karma OCP under kuju Area |
| 22 | Cost of copper wore 9SWG |
| 23 | Cost of insulating materials |
| 24 | Labour cost @ 15% of total copper cost |
| 25 | Less scrap value @ 60% of total copper cost |
| 26 | Contractor profit @ 10% |
| 27 | D) Repairing/reconditioning of 360 KW, 3.3KV Marathon motor make of Karma OCP under kuju Area |
| 28 | Cost of copper wore 9SWG |
| 29 | Cost of insulating materials |
| 30 | Labour cost @ 15% of total copper cost |
| 31 | Less scrap value @ 60% of total copper cost |
| 32 | Contractor profit @ 10% |
| 33 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |