| 1 | Divider Work Parshuram Park to Kalyan Ji Mandir & Adjoining Sikar |
| 2 | Dismantling of flexible pavements and disposal of dismantledmaterials up to a lead of 50 metres as directed by Engineer.Bituminous courses |
| 3 | Dismantling of flexible pavements and disposal of dismantledmaterials up to a lead of 50 metres as directed by Engineer.Granular coursesfatehupr road to rajdhani tiles one side |
| 4 | Earth work in excavation for roadway, including trimming bottom and sid slopes in accordance with requirement of line, grades and crosssections, including disposal of surplus material with all lift and leadupto 1000 metre as per MoRT&H specification clause 301sides of road |
| 5 | Carriage of Materials by mechanical transport including loading, unloading andstacking :: 2 km |
| 6 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel :of diversion.1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate40 mm nominal size) |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories( each story of height upto 3.5 metre from floor level) includingstrutting, propping etc. and removal of form forWalls (any thickness) including attached pilasters, buttresses, plinthand string courses etc. |
| 8 | Reinforcement for R.C.C. work at all levels including straightening,cutting, bending, placing in position a12 mm bar longitudinal 350/.150 mm nd binding all complete. |
| 9 | Providing and laying in position specified grade of reinforced cementconcrete excluding the cost of centring, shuttering, finishing andreinforcement - All work upto plinth level :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size) |
| 10 | Plastering with cement mortar (1:3) on Brick/stone work in substructure/ super structure at any height complete as per clause 1312 of MoRT&H specification including all material, labour,scaffolding etc. |
| 11 | Painting with synthetic enamel paint of approved brand andmanufacture of required colour to give an even shade: |
| 12 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 13 | Providing and fixing “L” type bollard 135cm height made out of1.25mm thick M.S. sheet welded in conical section having upper dia15cm and lower dia 20cm with another attachment of 150x150x7mmthick plate and hold fast at bottom, whole body is painted in whitestove enamel and red reflective 3 band, each of 7.5cm and onereflective sheet of 15cm dia provided to it complete in all respectincluding all material, labour, diversion. Please Enable Macros to View BoQ information |