|
| 1 | (A) GRW make pump 1000GPM,100mtr headRepairing of impeller (brass) with refilling of metal grinding facing , machining and grove cutting etc |
| 2 | Providing and fixing of shaft sleeve ( de & nde) |
| 3 | Repairing of neck ring with, refilling of metal grinding, facing, machining and grove cutting etc |
| 4 | Providing and fixing of impeller key |
| 5 | Providing and fixing of shaft sleeve nut |
| 6 | Repairing of bearing housing with metal filling facing, machining etc (c.i. electrodes) |
| 7 | Replacement of complete set of gaskit and “o” ring |
| 8 | Providing and fixing of bearing 09 6313-c3-zz) |
| 9 | Dismantling scrubbing and fitting pump with its parts in proper direction and fitting of spare like test valve ,cooling pipe etc and painting of pump. |
| 10 | Providing and fixing of shaft e-19 |
| 11 | Repairing of gland stud with washer |
| 12 | Providing and fixing of inter stage bush |
| 13 | Providing and fixing of gland packing |
| 14 | (B) 70 LPS Sykes pumpRepairing of impeller (brass) with refilling of metal grinding facing , machining and grove cutting etc |
| 15 | Providing and fixing of shaft sleeve ( de & nde) |
| 16 | Providing and fixing of bearing 3309 |
| 17 | Providing and fixing of impeller key |
| 18 | Providing and fixing of shaft sleeve nut |
| 19 | Providing and fixing of body bush |
| 20 | Replacement of complete set of gaskit and “o” ring |
| 21 | Providing and fixing of bearing 3309.-c3 |
| 22 | Dismantling scrubbing and fitting pump with its parts in proper direction and fitting of spare like test valve,cooling pipe etc and painting of pump. |
| 23 | Providing and fixing of shaft e-19 |
| 24 | Repairing of gland stud with washer |
| 25 | Providing and fixing of inter stage bush |
| 26 | Providing and fixing tyre coupling |
| 27 | Providing and fixing of gland bush |
| 28 | Providing and fixing of gland packing |
| 29 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |