| 1 | The rate of supply of item is inclusive of Freight and insurance at site including loading & unloading. |
| 2 | PCC Poles 9 mtr long 200 Kg |
| 3 | PCC Poles 9 mtr long 400 Kg |
| 4 | 33 KV D/C Lattice Structure (42' ungalvanised with 3 Nos. 33 KV cross arm (Channel)) |
| 5 | ACSR DOG Conductor |
| 6 | ACSR Rabbit Conductor |
| 7 | 33 KV 3C X 300 Sqmm. HT XLPE Cable |
| 8 | 11 KV 3C X 185 Sqmm HT XLPE Cable |
| 9 | 33 KV 3C X 300 Sqmm. Outdoor CABLE JOINTING KITS |
| 10 | 11 KV 3C X 185 Sqmm Outdoor CABLE JOINTING KITS |
| 11 | 33/11 KV GSS Structure Set Complete (Rural) |
| 12 | 33 KV Line DP Set |
| 13 | 11 KV Line DP Set |
| 14 | 33 KV 630 Amps. Isolators with PI (W/o EB) |
| 15 | 33 KV 630 Amps. Isolators with PI (With EB) |
| 16 | 11 KV 400 Amps. Isolators with PI (Without EB) |
| 17 | 33 KV Horn Gap Fuse Set with Post Insulator |
| 18 | 11 KV Horn Gap Fuse Set with Post Insulator |
| 19 | 12 KV Outdoor VCB Kiosks |
| 20 | 36 KV Outdoor VCB Kiosks |
| 21 | 33 KV Disc Insulator 45 KN B&S Type |
| 22 | 33 KV Disc Insulator H/W Set for 45 KN B&S Type |
| 23 | 11 KV Disc Insulator 45 KN T&C Type |
| 24 | 11 KV Disc Insulator H/W Set for 45 KN T&C Type |
| 25 | 33 KV Pin Insulator |
| 26 | 33 KV Galvanised MS Forged Pin |
| 27 | 11 KV Pin Insulator |
| 28 | 11 KV Galvanised MS Forged Pin |
| 29 | G.S. Stay Sets 20X2400 MM |
| 30 | 33 KV Stay Insulator |
| 31 | G.S. Stay Sets 16X1800 MM |
| 32 | G.S. Stay Wire 7/10 SWG |
| 33 | 11 KV Stay Insulator |
| 34 | Stay Set Clamps suitable for 9mtr. Long PCC Poles |
| 35 | 1.8 Mtr. Channel Bracket with clamp |
| 36 | 1.4 Mtr. Channel Bracket with clamp |
| 37 | G.S. Earthwire 8 SWG |
| 38 | G.S. Earthwire 6 SWG |
| 39 | MS Rod Type Earthing Set with wire and clamp |
| 40 | PG Clamp for ACSR DOG Conductor |
| 41 | M.S. Channel 100X50X6 MM |
| 42 | 11 KV CT-PT Set 200/5 Amps. |
| 43 | Danger Plates |
| 44 | 11/0.4 KV DISTRIBUTION TRANSFORMER 25 KVA THREE PHASE WITH M&P BOX (AL WOUND) (COMPLETELY SELF PROTECTED WITH PROVISION OF LT BUSHING BOX) |
| 45 | 5 MVA 33/ 11 KV Power Transformer |
| 46 | HT TVM with accuracy 0.2s with DLMS protocol |
| 47 | M. S. Flat 50 X 6 mm |
| 48 | 30 KV Station type surge arrestor |
| 49 | 9 KV Station type surge arrestor (LA) |
| 50 | 11/0.4 KV DISTRIBUTION TRANSFORMER 25 KVA THREE PHASE WITH M&P BOX (AL WOUND) |
| 51 | 33 KV S/C Lattice Structure (36' ungalvanised with 1 No. 33 KV cross arm (Channel)) |
| 52 | MIP Meter Box |
| 53 | Conducting route survey as per approved route map and pegging of route with tee off point section point & double pole locations. |
| 54 | Grass cutting and surface dressing including removal of unwanted/rubbish plants with roots from open ground/yard and other Nigam premises with stacking of grass/plants at desired place near the ground. |
| 55 | Levelling of ground |
| 56 | Levelling of ground above 30 cm. to 90 CM. depth with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder. (Including all lead & lifting) |
| 57 | Trimming of tree branches/plants manually/ by machine and preparing route approchases for proposed line. |
| 58 | Excavation of pit in ordinary rock which does not require blasting/murrad (in Jodhpur discom) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit. |
| 59 | (A) Height of poles/R.S.Joist/M.S. Rail /Size of pit |
| 60 | 9 Mtr/ 1.2mx0.6mx1.50 m deep |
| 61 | (B) Lattice Tower /Size of pit |
| 62 | 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep |
| 63 | (C) Stay set/Depth of pit |
| 64 | 8'x 3/4\\" -0.75x0.5x1.6 m |
| 65 | 6'x 5/8\\" -0.75x0.5x1.35 m |
| 66 | Excavation of pit in Hard rock (Where blasting/drilling is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit. |
| 67 | (A) Height of poles/R.S.Joist/M.S. Rail /Size of pit |
| 68 | 9 Mtr/ 1.2mx0.6mx1.50 m deep |
| 69 | (B) Lattice Tower /Size of pit |
| 70 | 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep |
| 71 | (C) Stay set/Depth of pit |
| 72 | 8'x 3/4\\" -0.75x0.5x1.6 m |
| 73 | 6'x 5/8\\" -0.75x0.5x1.35 m |
| 74 | Earth work excavation and foundation of platfrom of transformers and brakers including dressing of sides and ramming of bottoms. Liftup to 1.5 Meter including taking out the excavated soil and depositing and refilling of jhiri, watering and ramming and disposal of surplus excavated soil as directed with in a lead of 50 Meter. |
| 75 | Hard soil mixed with boulders |
| 76 | Providing and laying cement concrete including compaction etc, complete using stone aggregate 40 mm nominal size (hand broken) in foundation plinth excluding the cost of shuttering using 1 cement:5 sand:10 aggregate mix. |
| 77 | The rates are all lead of cement, lime, ballast, sand, surkhi and grit etc. at site of work. |
| 78 | For all concrete work coarse sand shall be used no extra will be paid. |
| 79 | Concrete mix prepared by power driven mechanical mixer shall be used. |
| 80 | Under exceptional coditions, where mechanical mixer and vibrator are not used (with the approval of Engineer Incharge reduced by 3% for mechanical mixer and 2% for Vibrator |
| 81 | Thickness of the cement concrete should not exceeed 100 mm. |
| 82 | Plaster on new surface on walls in cement, sand mortar 1:6 including racking of joint etc. complete fine finish 25 mm thick. |
| 83 | The rates for complete work including racking of joints, curing, grinding, mixing and finishing T&P and scaffolding material and cost of material with all lead and lift. |
| 84 | The rates cover protection of all place and things, requiring protection and cleaing such places and thing of all droppings and splashes of mortar etc. |
| 85 | Cement concrete flooring grade 1:2:4 (1-cement :2- coarse sand :4-graded stone aggregate) rounding off edges etc. but excluding cost of nosing of steps etc. complete. |
| 86 | 25 mm thick with 12.5 mm thick nominal size aggregate. |
| 87 | 75 mm thick with 20 mm thick nominal size aggregate. |
| 88 | The rates for all items inculde all form of work, laying, curing and finishing etc. The rates are for complete work at site, inclusive of all leads. |
| 89 | The rates cover the preparation and cleaing of all places |
| 90 | Masonry for foundation and plinth |
| 91 | Randon Rubble stone masonry for foundation and plinth in cement sand mortar 1:6 (1 Cement : 6 Sand) including labour charges. |
| 92 | Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The cost muffing and grouting will be paid extra. |
| 93 | Lattice Structure |
| 94 | Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line. Including fixing of top bracing of M.S.Channels with pilot plates and clamps. The support is to be back filled with soil with proper ramming. |
| 95 | PCC Poles 9 Mtr. Long(400 Kg.)/11Mtr.long |
| 96 | PCC Poles 9 Mtr. Long(200 Kg.) |
| 97 | Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming. The work includes fixing of stay clamps. Stay insulator with stay wire at both ends with proper tension. Size of stay set/stay wire |
| 98 | 8\\"x3/4\\" with 7/8 SWG stay wire |
| 99 | 6\\"x5/8\\" with 7/10 SWG stay wire |
| 100 | Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement, river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21 days in steel plates shuttering /farmer base. |
| 101 | Supplying and laying of randum rubble stone boulder having weight not less than 20 kgs. |
| 102 | Fixing of all type of fabricated material on erected supports with nut & bolts as per approved design & drawing of sub-station. |
| 103 | Fixing and assembly of disc. point channel pair with pilot plates & clamps on erected double pole structure as per design. |
| 104 | 33 KV line |
| 105 | 11 KV line |
| 106 | Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 Nos. disc. & 1set of H/W) on terminal point including fixing of hardware and strips. |
| 107 | Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 1 Nos. disc & 1 set of H/W) on terminal point including fixing of hardware and strips. |
| 108 | Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 2 nos. disc. & 1set of H/W) on terminal point including fixing of hardware and strips. |
| 109 | Fixing of 33kv pin insulator with pins. |
| 110 | Fixing of 11 KV pin insulator with pins. |
| 111 | Fixing of danger plates on supports/structure |
| 112 | Fixing of PG clamp of Dog /Racoon Conductor |
| 113 | Assembly, Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. |
| 114 | (A) G.O. switch. with earthing blade. |
| 115 | 33kv G.O.switch |
| 116 | (B) G.O. switch. without earthing blade. |
| 117 | 33kv G.O.switch |
| 118 | 11kv G.O.switch |
| 119 | Assembly and installation of Horn Gap fuse set (set of 3 nos) on erected structure as per design, complete in all respect with post insulator including jumpering on both ends for connection with the system. |
| 120 | 33kv Horn Gap fuse set. |
| 121 | 11kv Horn Gap fuse set. |
| 122 | Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV & LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. |
| 123 | 25 and 40 KVA |
| 124 | Laying, jointing, stringing, tensioning and clamping of conductor with proper sag as directed, using bolted type hardware including binding on pin insulators, jumpering on section points with binding wire / P.G.clamps. Aluminium jointing sleeves will be used for jointing the conductor. The line must stand at proper voltage on charging. |
| 125 | (B) IN RURAL AREA |
| 126 | ACSR DOG |
| 127 | ACSR RABBIT |
| 128 | Laying, jointing, stringing, tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc. including proper binding at each end. |
| 129 | (B) IN RURAL AREA |
| 130 | G.I.Earth wire 6 SWG |
| 131 | Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod 20mm dia each 3 meter long and driving into earth by mechanical means as per approved design. Drawing & specification. (In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom) |
| 132 | Mesh earthing for 33/11 kv sub-station as per approved map & design using MS flat 50X6mm/MS road 20mm dia including laying of flat/rod at the depth of 0.65 Mtrs., welding & jointing at joints, structures & equipments etc. as under: |
| 133 | Excavation of trench of 0.65 Mtrs. depth and 0.5 Mtr. width |
| 134 | Ordinary rock (where blasting is not required). |
| 135 | Preparation of spikes made of M.S Rod of 20 mm dia and 3 Mtr. length as per design and requirment to be driven in earth by mechanical means and Providing & fastening of suitable clamps with the M.S. Rod, connection of earth wire/stay wire/MS flat in clamp depending on type of soil: |
| 136 | Where drilling is required |
| 137 | Filling of trench with available excavated muck in layers of 20cm (Max.) consolidating each deposited layer by ramming & watering with lead up to 50 Mtr, and lift up to 1.5 Mtr. |
| 138 | Painting of exposed portion of MS flat/rod with two coats of red-oxide primer and two coats of green enamel paint.including material. |
| 139 | Erection of PCC poles in excavated pit in alignment after checking the same with plumb line as per approved design & drawing of 33/11kv sub-station. The pit should be back filled with the soil with proper ramming below 30cm ground level and then muffed above 15cm average ground level with cement concrete ratio1:3:6. The charges for muffing will be paid extra as per chapter code no 5.7. |
| 140 | (B) IN RURAL AREA |
| 141 | PCC Poles 9 Mtr. Long |
| 142 | Laying / stringing of bus bar with ACSR Dog & jumper connection using tie rod, 33KV /11KV insulator strings, required hardware, P.G.clamps/T clamps etc. as per requirement including Y-connections at bus bar jumpering point as per the direction of engineer in-charge. |
| 143 | ACSR DOG/RABBIT |
| 144 | Supply, stacking & spreading of stone boulders 40 mm. Mono size. (Less voids 17%) |
| 145 | Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization, filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom. |
| 146 | 33 KV VCB/SF-6 Breaker |
| 147 | 11 KV OCB/KIOSK |
| 148 | Installation of current/potential transformers on supporting structure including checking of wiring & conducting all pre-commissioning tests before energization & satisfactory operation in all respect (The CT/PT set will be tested by Discom). |
| 149 | 11 KV CT(1 set of 3 Nos.) OR PT Set |
| 150 | Laying energisation & commissioning of underground cable for working voltage of 11 KV/33 KV Aluminium conductor, Power cable XLPE/PILCA armoured in RCC class NP-2 Non-pressure pipes of sizes mentioned against each refilling of earth in the remaining excavated area making necessary connection including testing etc. as required (It includes providing, laying & jointing RCC class NP-2 Non-pressure pipes conforming to IS:458 of approved make with collars, jointed with CM 1:20 depth of cable shall be 1.2 meter. |
| 151 | (A) 33 KV Cable |
| 152 | 3x300 sq. mm in pipe of dia 300 mm |
| 153 | Providing and fixing of G.I. Pipe of 150 mm diameter. B-Class (IS:1239 mark), at the starting and finishing point of 33 KV under ground cables and to lay & clamp vertically with the existing support including labour charges. |
| 154 | Installation of metering points on 11 KV Out going feeder at 33/11 KV S/S. |
| 155 | The installation work to be carried out as per drawing/design, under the supervision of concerned Assistant Engineer |
| 156 | Mounting structure |
| 157 | The requisite steel members will be supplied by contractor including the hardware. Contractor shall joint/weld the members to form the mounting structure as per drawing. Necessary tools, welding, machines, lifting devices etc. shall be arranged by contractor. |
| 158 | Civil works |
| 159 | Erection of lattices in alignment including excavation and concreting of structure foundation including cement, sand and grit 20 mm size (crusher broken) having ratio 1:3:6 and grit 40 mm size for ratio 1:5:10 and curing for period as required (21 days). Area of concreting will be as per the drawing. |
| 160 | Metering Equipments: |
| 161 | The requisite metering equipments (CTPT set, meter, meter box & suitable conductors for jumpers), will be provided by the concerned Assistant Engineer in healthy condition at site. The cables from CTPT set to meter box laid down in 50 mm GI pipe with suitable bends & nipples, shall be provided by contractor alongwith the consumable items such as PVC tapes, petroleum jelly etc. The cable should be PVC multi strand copper 4 core 2.5/4 Sq. mm ISI marked and firm & tight connections shall be made by suitable connector e.g. at CTPT sets by using clamps and at meter/TTB by suitable lugs etc. The CTPT sets so installed shall be earthed by means of the MS Flat (size 50x6 mm) by joining it with the nearest earthing available at the sub-station. Requisite earthing material shall be made available by the contractor. |
| 162 | Meter: |
| 163 | Meters should be fixed firmly inside the tamper proof box, as per drawing. All the meter fixture will be provided by contractor including all consumables. |
| 164 | Meter Box |
| 165 | The meter box shall be provided by the concerned Assistant Engineer. However, hardware or any other items required to fix the meter inside the meter box will be provided by contractor. The meter box will be fixed firmly with sufficient strength at a place as per drawing. The test terminal block (TTB) link type shall be provided by contractor in the meter box. |
| 166 | Painting: |
| 167 | All surfaces interior and exterior of lattice structure shall be white aluminum painted. |
| 168 | Commissioning of Metering Equipments: |
| 169 | Installed meters inside the box and metering equipments duly mounted on the mounting structure will be powered up by connecting load in the presence of the concerned Assistant Engineer who will arrange the necessary shut down. The completion certificate shall be furnised by contractor be filled accordingly. Since the work involves higher A.C. voltage level, the contractor shall take full care regarding safety norms, so as to avoid any accidental hazards. |
| 170 | Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper. (including cost of red oxide) |
| 171 | On new surface |
| 172 | Painting with aluminium paint of approved brand and manufacturer to give an even surface. (including cost aluminium paint) |
| 173 | On new works with two coats. |
| 174 | Laying of 11 KV, XLPE, Cable (Aluminium conductor) underground as per relevant IS/JVVNL standards including excavation of 30 cm x 120 cm deep trench in Kaccha land 25 cm thick under layer of sand. 'A' class beicks covering refilling soil in the remaining (Including fixing of G.I.Pipe of required size at both end with 3 Mtr projected above the ground surface & 0.3 Mtr. below ground level) |
| 175 | a) 3x35 Sq mm to 3x185 Sq mm |
| 176 | Installation of cable termination / straight through joints on 11KV Aluminium conductor XLPE /PILCA Cable with outdoor/ indoor termination end and /or straight through joint including required excavation / remoral/ fixing / refixing/ testing etc. as required |
| 177 | A) (i) Outdoor end terminal 3x35 Sq mm to 3x185 Sq mm |
| 178 | Laying of 33 KV XLPE Cable (Aluminium Conductor) underground as per relevant ISS / JVVNL standard including excavation of 30 cm width x120 cm deep trench in Kaccha land 25 cm thick under layer of sand. 'A' class bricks or concrete block covering refilling soil in the remaining portion and providing/fixing cable route indicators at every 30Mtr.of cable and at every turn. |
| 179 | B) 3x240 Sq mm to 3x400 Sq mm |
| 180 | Intallation of 33 KV Cable (XLPE) termination / straight through joints (Heat shrinkable type) as per manufacturer's kit guidance and direction including preparation of cable and testing refilling etc as required. (Including crimping of lugs) Including required excavation/ removal/ fixing/ reaffixing/ testing etc. as required. |
| 181 | (i) Outdoor end terminal |
| 182 | (ii) 3x240 Sq mm to 3x400 Sq mm |
| 183 | Laying of 33 KV & 11KV XLPE cable without Road cutting i.e. through burrowing machine \\"VERMIER\\".(120 cm deep).Use of this technology must be restricted to the situation like:- |
| 184 | (i) When the passages available for laying the proposed cable is totally a metal or cement concrete road. |
| 185 | (ii) When the road cutting is not permitted by the local administration. |
| 186 | A) 33 / 11 KV 3C x 300 Sq.mm cable |
| 187 | Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. |
| 188 | 33 KV line |
| 189 | Installation of lightening arrestors on erected structure /support (1 nos) including connection with earth by wire /strip as required and jumpering etc. |
| 190 | (A) sub-station type |
| 191 | 33 KV L.A. each |
| 192 | 11 KV L.A. each |
| 193 | 3 Nos. of earthing of 11/0.4 KV distribution transformer /sub-station with 3 pieces of M.S.Rod 20mm dia each 3 meter long and driving them into earth by mechanical means at a distance as per approved design & drawing & specification. The work includes flattening of top ends of M.S.rod drilling a hole of 9/16\\" dia. at flattened top and tightening of M.S.flat 50x6mm/25x3mm (having 3 hole 2ends and 1mm middle) with nuts and bolts with M.S.rods top end hole. The flat will also be welded with M.S.rod. The end will be connected to equipments as under in sequence. |
| 194 | Laying of MS flat /MS rod in 0.65Mtr. deep excavated trench and welding of MS flat/rod continuosly with 100 mm overlaping for straight joint including coating of MS flat joints with molten bitumen and covering joint with bitumen impregnated tape to protect from rust. |
| 195 | Shaping of MS flat for connecting the equipments with earthmesh. The work includes the welding of MS flat with equipments/structure and also with earth mesh. The work also includes coating of MS flat joint with molten bitumen and covering jointwith bitumen impregnated tape to protect from rust. |
| 196 | Earthing of new 33/11 KV S/S with bentonite compound (including material) involving following activities. |
| 197 | Digging of 10.5 ft. deep pit of 4 ' dia (approx 132 cu.ft) |
| 198 | Supply of 2\\" G.I pipe with cap (including fabrication of 30 holes in the periphery of pipe) |
| 199 | Making chamber for water pouring including cast iron manhole cover |
| 200 | Supply cost of 200 kg bentonite compound with making slurry |
| 201 | Supplu of black cotton soil approx 80 cu.ft. |
| 202 | Connecting electrode with Mesh Earthing |
| 203 | Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization, filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom. |
| 204 | 11 KV VCB (Outdoor ) |
| 205 | Fixing and assembly of disc.point channel pair with pilot plates top hampers & clamps on erected single pole structure as per design. |
| 206 | 11 KV line |
| 207 | Excavation of pit in Hard rock (Where blasting/drilling is required) to erect various supports and stay sets including stacking of excavated muck from the edge of excavation/pit. |
| 208 | (B) Lattice Tower /Size of pit |
| 209 | 11.4/10.8 Mtr/ 1.5mx1.5m x1.80 m deep |
| 210 | Laying, jointing, stringing, tensioning and clamping of G.I.Earthwire continuosly on single/double pole by using earth clamps /nuts & bolts with washers and earth reel etc. including proper binding at each end. |
| 211 | (B) IN RURAL AREA |
| 212 | G.I.Earth wire 8 SWG |
| 213 | Pipe Earthing for Power Transformer at 33 / 11 KV S/S:-Supply & erection of earthing electrode shall consist of G.I. Pipe 100 mm. of 3 Mtr Length. The electrode shall be buried as far as practicable 3 meters below ground level. Wherever possible, earth electrodes shall be located as near the water tap, water drain or near down take pipe. Earth electrodes shall not be installed in proximity to a metal fence. It shall be kept clear of the buildings foundations and in no case it shall be nearer than 2 meters from the outer face of the wall. The electrode shall be surrounded with layer of charcoal dust and salt mixture through out the length. The 100 mm GI pipe shall be provided with holes of 12 mm dia. drilled at 75 mm interval upto 2.5 meters length from bottom. The top of the pipe shall be provided with a G.I. threaded cap for watering the earth through a pipe. A Clamp with Pati of 12\\" of M.S. Flat of size 50X6 mm shall be fixed (Bolted) on the top edge of the pipe which in turn shall be connected to Neutral / Body of the Power Transformer through M.S. Flat size 50X6 mm. The G.I. cap over the GI pipe shall be housed in a masonry chamber, approximately 300 mm x 300 mm x 300 mm deep. The masonry chamber shall be provided with a RCC inspection cover resting over a RCC frame, embedded in masonry. |
| 214 | Fabrication of steel structures of M.S angle, M.S. channel & M.S.Flat including cutting, drilling as per design and drawing. |
| 215 | 11/0.433 KV Substation Structure (185.83 Kg) |
| 216 | 33 KV Line D.P.sets (142.314 Kg) |
| 217 | 33/11 KV Rural Sub-Station Structure (4086.879 Kg) |
| 218 | Wiring service line from LT Pole to meter of the consumer with 4 Sq.mm. T/C XLPE armoured cable of aluminium conductor confirming to IS (latest amendment) procured as per specification of Nigam and approved vendor of Jaipur Discom duly clipped/hocked and insulating tape complete in all respect. |
| 219 | Laying of 33 KV & 11KV XLPE cable without Road cutting i.e. through burrowing machine \\"VERMIER\\".(120 cm deep).Use of this technology must be restricted to the situation like:- |
| 220 | (i) When the passages available for laying the proposed cable is totally a metal or cement concrete road. |
| 221 | (ii) When the road cutting is not permitted by the local administration. |
| 222 | B) 33 / 11 KV below 3C x 300 Sq.mm cable |
| 223 | For Extra Loop (Ghera) to be provided near the pole on termination point and the length of cable along the pole for mounting of cable jointing kit. |
| 224 | 11 KV Cable:- |
| 225 | 3X35 Sq.mm to 3X185 Sq.mm Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: SUPERINTENDING ENGINEER (TW), JVVNL, JAIPUR Name of Work: Execution of deposit works, including the Supply, Erection, Installation, Testing, and Commissioning of materials/equipment for the construction of 33/11 KV sub-stations, 33 KV & 11 KV overhead Line, laying of 33 KV and 11 KV underground XLPE Cable, construction of 33 KV Bay, 11 KV Bay and shifting of 33 KV & 11 KV line, Metering under Baran circle on turnkey basis against TW/TN-621. Contract No: JPD/SE(TW)/TW/TN-621 Name of the Bidder/ Bidding Firm / Company : ABSTRACT OF PRICE SCHEDULE FOR SUPPLY & ERECTION OF MATERIAL & EQUIPMENT(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) |
| 226 | Description |
| 227 | Quoted rate in BOQ1- SUPPLY OF MATERIAL AND EQUIPMENT |
| 228 | Quoted rate in BOQ2- ERECTION OF MATERIAL AND EQUIPMENT Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |